Building inspection report - 233 Kyona Road East Moree

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

The building to be moved has overall plan dimensions of approximately 19.2m x 16.5m and 3.65m
ceiling height, and consists of the following members/ materials:

-100 x 75 cypress bearers

-100 x 50 cypress floor joists & 450 centres

-100 stud framing

-the roof framing consists typically of 100 x 50 cypress rafters at 900 centres, 100 x 50 cypress ceiling
joists, & 75 x 50 cypress battens, 100 x 50 cypress collar ties, 100 x 50 cypress struts

-external cladding is original timber weather boards

-internal wall lining is typically plaster board

-flooring is pine T&G boards or shot edge boards

-roof cladding is Custom Orb sheeting.



Structural timber replacement:

It is the builder/removalists responsibility to ensure that any defective timber found during the
course of removal and re-establishment is replaced with new equivalent timber members.

Where a splice join is required, it should be adequate to ensure there is no loss of strength due to
replacement of the defective timber member.

All cuts should be spliced with timber fish plates of the same dimensional width and 500 either side
of the cut location, fixed with 2/M10 bolts each side of the cut. This should be increased to 750mm
for floor joists or to the satisfaction of the inspecting authority.



External treatment:

All timber should be treated in accordance with Australian Standard AS1684.2 2006 Non Cyclonic
Areas Residential timber framed construction Part 2 recommendations.

The exterior of the residence is clad with original weather boards which are in poor condition with
effective failure of the painting system. Selective replacement of boards will be required. All external
timber surfaces will need to be stripped, cleaned, prepared & painted.



Roof sheeting & gutters:

The existing roof sheeting & guttering is in poor condition and will be replaced.



Tiedown requirements:

    -   Rafter to wall top plate – 1 framing anchor with 4/2.8mm nails each leg to receiving
        members or 30 x 0.8 GI strap with 4/2.8mm nails each end to top plate face.
Log in to download the original file

Building inspection report - 233 Kyona Road East Moree.pdf · 11.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.