Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2017-06-15 Special Meeting Agenda

of 200

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

4.3   Theme 3: The Noosa Economy
No.   Project                                                                                              Responsibility

1     Commence renewal of Park Road boardwalk.                                                             To be determined

2     Finalise construction of Rufous Street Digital Hub project (Stage 1) and adoption of hub operating   To be determined
      model.

3     Continued implementation of Local Economic Plan incl. providing support to existing industry To be determined
      representative groups and evaluation of peak body models.




                                                                                                           Noosa Council | Operational Plan 2017 – 2018
                                                                                                                                                 Page 8
Log in to download the original file

2017-06-15 Special Meeting Agenda(PDF, 8MB).pdf · 8.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.