Skip to the record
Every meeting, every word.

Original source · versioned page text

Ccf_000013

Attached to the e-mail Operational Works Application OPW18/0028 - 8 Supplejack Crt Lake Macdonald.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Department of Infrastructure, Local Government and Planni

 

Section 2 — Further development details
7) Does the proposed development application involve any of the following?

   

  
     

 

 

 

Material change of use C1 Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot O Yas — complete division 2

Operational work Yes — complete division 3

Building work (1 Yes — complete DA Form 2 — Building work details

 

 

 

Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.

8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)

ae (if applicable)

 
 
    

 
 
   

  

 

 

 

 

 

 

8.2) Does the proposed use involve the use of existing buildings on the premises?

 

(Yes

 

 

 

 

(No

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1) What is the total number of existing lots making up the premises?

   
   
  
     
   

OD AY aeLa oe aloe aCe Meum tal—ale)' reconfiguration? (tick all applicable boxes)
(J Subdivision (complete 10)) oO Dividing land into parts by agreement (complete 11))

(J Boundary realignment (complete 12)) '{_] Creating or changing an easement giving access to a lot from
a construction road (complete 13))

 

 

 

10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use (o) ih Unres— wo)

Intended use of lots created Residential | Industrial Other, please specify:

 

 

Number of lots created

10.2) Will the subdivision be staged?

C1 Yes — provide additional details below
(No

How many stages will the works include?

What stage(s) will this development eee te
apply to? =

 

 

 

 

 

Intended use of parts created Residential Commercial rial Other, please specify:

 

 

 

 

 

 

Number of parts created — |

 
Log in to download the original file

CCF_000013.pdf · 10.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.