SOME GUIDEUNES FOR HILLSIDE CONSTRUcrION
GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obtain advice from a qualified, experienced geotechn al practitimer at early Prepare detailed plan and start site works before
ASSE’>SMENT e of I ann
.
and before site works. technical advice.
PLANNING
SITE PLANNING Plan development withoot regard for the Risk.
Use flexible structures wlch incorponte properly designed brickwork, timber Floor plans which require extensive cutting and
or sted frames.timber er panel cladding. fling.
HOUSE DESIGN
Cmsider use ofsplit levels. Movement Bolerant structures.
Use decks for recreational areas where appropriate.
SITE CLEARING Retail natural velletatim wherever practicable. Indiscriminatelv clear the site.
ACCESS &. SatisfY requirements below for cuts. fiUs. retaining walls and drainage. Excavate and fill fer site access before
DRIVEWAYS CoonciJ specificatims for grades may need to be modified. geotechnical advice.
Driveways and paJiting areas may need to be fully suppated m piers.
EARTHWORKS Retail nalUra! contoors wherever possible. IndiscriminatttY bulk earthworks.
M imise depth. Large scale cuts and benching.
Suppcrt with engineered retaining walls or batter to sppropriate slope.
CUTs
Provide ~~measures and eT05im control. unsu,;~~’
l.Iln<ie- .
reauiremenl3
e
Minimise height Loose or poaiy compacted fill. wlch if it fals.
Strip vegetatim and topsoil and key into natural slopes prier to fining. may flow a considerable distance including
Use clean fill materials and compact to engineering standards. mto property below.
FlLI Batter to appropriate slope or suppcrt with engineered retaining wall. Block natural drainage tines.
Provide surface drainage and appropriate subsurl’acc dranage. Fill over existing vegetation and topsoil
Include slUmps, trees. vegetation, topsoil,
boolders. buildinll rubble etc in fiU.
ROCK OUTCROPS Remove or stabilise boulders wlch may have unacceptable risk. Distwb or undercut detached blocks or
&.BoUWERS SuPpcrt rock faces where necess .
boolders.
Engineer design to resist applied soil and water forces. Construct a structurally inadequate wall such as
Found m rock where practicable. sandstme flagging. brick or unreinforced
RETAINING
Provide subsurface drainage within wall backfill and surface drallBe on slope blockwork.
WAILS Lack ofsubsurface dra and weep holes.
above.
Cmstruct wall as som as possible after cut/fill operatim.
Found within rock where practicable. Fomd m topsoi~ loose fill. detached boulders
Use I’OWB ofpicrs or strip footings oriented up and down slope. or undercut cliffs.
FOOTINGS
Design for lateral creep pressures ifnecesS8l)’.
Backfill foOl excavations to exclude ingress of surface water.
Engineer designed.
Suppcrt on piers to rock where practable.
SWIMMING POOLS Provide with mder-drainage and gravity dran ootlct where practicable.
Design for high soil pressures wlch may develop on uphill side wllst there
may be little <X’ no lateral suoocrt m downhi1lside.
DRAINAGE
Provide at tops of cut and fill slopes. Discharge at top offills and cuts.
Discharge to street draagc or natural water coorses. Anow water to pond m benh areas.
SURFACE Provide general falls to prevent blockage by s tatim and incorporate silt traps.
Line to minimise infiltration and make flexible where possible.
Soccial structures to dissiDate energy at changes of slope and/or dircctim.
Provide filter aroond subsurface drain. Discharge roofrunoff into absOIJItim trenches.
Provide dran behind retaining walls.
SUBSURFACE
Use flexible pipelines with access for maintenance.
Prevent inflow of surface water.
Usually requires pump-out or mains sewer systems; absorptim trenches may Discharge sullage directly onto and into slopes.
SEPTIC &.
be possible il some areas ifrisk is acceptable. Use absorption trenches without cmsideratim
SU"U.oAGE
Storaae tanks shoold be water-tillht and adequately founded. oflandslide risk.
EROSION Cmtrol erosim as this may lead to instability. Failure to observe earthworkI and drae
CONTROL&. Revegctate cleared area. recommcndatims when landscaping.
LANDSCAPING
OWNER’S Clean drainllBe systems; rep8 broken joints in drains and leaks in supply
RESPONSffiIIlTY pipes.
Where structural distress is evident scc advice.
Ifseepaae observed, determine causes <X’ seek advice on cmsequences.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU13/0106Related documentApplication case desk ↗
REFERENCED DOCUMENT - MCU13/0106Related documentApplication case desk ↗
About this file
- File size
- 16.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.