08/1796 - Preliminary Building Approval - Roofed Patio [As Published] · 172008.1796
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SECTION 3 Section 3 must be completed when the application seeks approval to reconfiguring a Jot. IPA, schedule 8. pet 1, table 3
STATE:CONTROLLED ROAD? 3 "OE hg Bs FR APE
3.1 | Is any part of the premises located i in par of a future State-contralled ro road, or within 100m ofa State-controlled toad?
[No
It no, is the proposed reconfiguration listed in integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold?
oO No O Yes - The application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
Yes
If yes, will the proposed reconfiguration result in the following?
(An increase in the total number of lots : ONo (Yes
{ii) An increase In the total number of lots abutting the State-controlled road O No O Yes
I yes to either or both (i) or (i) above; is the reconfiguration proposed in a future State-controlled road not defined by toute? .
Og Yes - This application must be referred to the Department of Main Roads (DMA) as Advice Agency
O No - This application must be referred to DMR as Concurrence Agency.
IP Regulation, schedtte 2, table 3 3:1 Beguiaton, scheoule 2, abie 2. itanr 2.
3.2 | Isany pari of the premises within a coastal management district?
LINe-Gotoo33 (C] Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
P.
. schedule 2, lable 2. tom 13/2).
TATION: N
Do the premises include a alot containing the following? /
_{) Accategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) (1No [7] Yes
‘
{ii) If there is no PMAV for a lot, remnant vegetation : [1] No OC Yes
. lfyes to either or both (i) or (ii) above, are 2 or more lots proposed to be created?
(J No-Gotoas4 [] Yes
If yes, is any lot, before the proposed reconfiguration, 2ha or larger?
LINo-Gotoos4 {(] Yes
tyes, is the size of any lot proposed to be created, 25ha or smaller?
| No - Go fo 03.4 0 Yes - (Complete Form 1, Part J) This application must be referred to the Department of Natural Resources
and Water (NRW) as Concurrence Agency.
BP Regulation, sctedtde 2, tab
MEASEMENTS.
34° |Is any part of the premises subject to an easement?
(INo-Gotoa3s _) Yes - Answer both (a) and (b) below
(a) Is there an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for a transmission
rid or supply network under that Act?
No oO Yes - This application must be referred to the entity as Advice Agency.
(b) Is there an easement in favour of the holder of Pipeline Licence Number 1 Issued under the Petroleum Act 1923 for the
construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
oO No | Yes - This application must be referred to the licence holder as Adviea Agency.
ELECTRICITY, SUBSTATIONS
3.5 |1s any part of the premises situated within 100m of a substation site under the Electri ty Act 1994?
oO No - Go 10 03.6 oO Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
If Reguiation, schaduie 2, tabie 2, Nee
27).
Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1796 - Preliminary Building Approval - Roofed Patio [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.