08/1796 - Preliminary Building Approval - Roofed Patio [As Published] · 172008.1796
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
S ECTIO N 4 Section 4 must be completed when the application seeks approval to cary out o operational work.
IPLANNING SCHEME <<. “Die mhel, GLU EF
41 Is any of the proposed operational work assessable under a planning scheme?
CINo - Goto o42 DYes- (Compete Fort Part E) Answer Os4.1.1 - 4.1.7 below.
'E-CONTROLLED ROAD &
Is any part of the premises located in part oe a future State-controled road, or within 100m of a State-controlled road?
(No :
if no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
EINo (7 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
0 Yes
If yes, is all of the proposed operational work associated with the following?
(i) Ammaterial change of use that is assessable under the planning scheme [No D1 Yes
(li) Reconfiguring a lot that increases the total number of lots, or increases the total number oflots © []No (] Yes :
abutting the State-controlled road |
If no to either or both (i) or (ii) above - Answer (a) - (c) below
(a) Is any of the proposed operational work associated with access to a State-controlled road?
CING Yes - this application must be referred to the Department of Main Roads (Mn as Concurenca Agency.
(b) Is any of the proposed operational work for filling or excavation?
CNo 0 Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to. the Department of Main Roads (DMR) as Concurrence Agency
0 Yes - This'zpplication must be referred to DMA as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
CINo (Yes !
H yes, is the operational work proposed in a future State-controlled road not defined by route?
Cl No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
O Yes - This application: must be referred to OMA as Advice Agency.
3, tora Heo}
JP PRagulation. schedule 2, able 3, tam 3,1? Ragutation, scheduse 2, table
}ACIO SULFATE SOILS :
41.2 |\s any of the operational w work proposed | ine a local government ar area isted*™ in State Planning Policy 2/02: Planning and ‘Managing
Development involving Acid Sulfate Soils? '
CINo-dotooss3 (1) Yes
It yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
CJ No 1 Yes
If yes, does the proposed operational work involve the following? . |
(i) Excavating more than 1,000m° of soil or sediment at or below 5m AHD CINo (1) Yes i
(ii) Filling the premises with 1,000m3 or more of material with.an average depth of 0.5mon [JNo [] Yes i
land, soil or sediment at or below 5m AHD
It yes to either or.both (i) or (ii) above - This apptication must to be referred to the Department of Natural Resources and Water (NRW) as
Advice Agancy
IP Asguialion, schadule 2 tebe 3, tem 4; State Pisnning Policy 202: Planning and Managing Development involving Acid Sulfate Sls, saction 3.6,
+1 Aurukun, Bowen, Brisbane, Broadsound, 8undaberg, Burdekin, Burke, Bumett, Caboottura, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1796 - Preliminary Building Approval - Roofed Patio [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.