Council archive · source document
08/1796 - Preliminary Building Approval - Roofed Patio [As Published] · 172008.1796
INTEGRATED PLANNING ACT 1997 . : IDAS Assessment Checklist, Version 21.3, 9 May 2008 SECTION 6 Complete Section 6 if you have received a referral agency response about an aspect of your proposal prior to making an application: [PRE APPLICATION REFERRAL AGENCY RESPONSE -“ " EF ly: ease ER 64 REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS =| HAVE YOU SATISFIED ANY CONDITIONS STATED BEEN RECEIVED UNDER IPA S3.2.2 — list a separate matter in each row IN THE RESPONSE? 0 Yes | (1) No | 1 Noconditions © Yes | C1 No | () Noconditions OO] Yes | C1 No | CI Noconditions 0 Yes | CJ No | £) Nocontitions © Yes | £1 No | CJ Noconditions O Yes | (1 No | (2 Noconditions OC Yes | C) No | C Noconditions N If yes for any of the referral matters listed in the table above - A referral for this matter Is not required, and the relavant Part identified in the IDAS Assessment Checklist is not required to be completed. A copy of tha referral agency response and evidence of how you have satisfied any conditions stated in the response must be attached to your application. #no for any of the referral mattors Usted in the table above - The relevant Part identified in the IDAS Assessment Checklist is required to be completed. The application must be referred to the relevant referral agency, unless the referral agency is the Assessment Manager. © Page 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1796 - Preliminary Building Approval - Roofed Patio [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.