Council archive · source document
08/1796 - Preliminary Building Approval - Roofed Patio [As Published] · 172008.1796
INTEGRATED PLANNING ACT 1997 Past E, Version 3.1, 3 March 2008 RECEIVED ‘45 OCT 2008 Building &/or operational works assessable against a planning scheme iNature of the works 1. Nature of work that requires assessment against a planning scheme: DX] Building work - Complete Table A LE) Operational work - Complete Table B Table A (i) What is the nature of the building work made assessable in the planning scheme? See attached Letter (i) Are there any current approvals associated with this application? (e.g. material change of use) DXNo = _[[] Yes - Provide details below 2. What is the dollar value of this operational work? (Le. the total value including GST, materials and labour) |$ \Mandatory information howe | 3. Confirm that the following mandatory information accompanies this application Confirmation of todgement Method of todgement Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the Cer mo "9 pm “mens (X) Confirmed OFFICE USE ONLY Date Received Reference Numbers [ Advice for completing Part E General advice e Part Amust also be completed for all IDAS development applications. * The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question. o1 A development permit authorises development to occur, while a preliminary approval Is a step in the approval process and does not authorise development to occur
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1796 - Preliminary Building Approval - Roofed Patio [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.