08/1796 - Preliminary Building Approval - Roofed Patio [As Published] · 172008.1796
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SECTI ON 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
- HERITAGE 28s? iB Rs Se FRG 2 1a Sea ch RE
1.1A | ls any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act 1992?
No - Gotoai.18 [1 Yes
Ityes, has an exemption certificate for the proposal'' been issued under the Queensland Heritage Act 1992?
(J Yes DONo
If no, is the proposed work emergency work for the Queensfand Heritage Act 1992?
C0 Yes No
If no, is the work ie out by the State?
(J Yes No - (Complete Form 1, Part C;) This application requires assessment by the Environmental Protection Agency (EPA).
it EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
IPA, schedule 8, pat t, table §. item 2. iP Regulaton, schedule 2, lable 1. lem 11, tabe 2. item 18: (PA, saction 1.3.5 {Definitions for tarms used in development).
1.1B
Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered ina
Local Heritage Register under Part 11 of the Queensland Heritage Act 1992?
BaNo - GotoQ1.2 oO Yes - (Complete Form 1, Part C2) This application requires assessment by the relevant local government agains! the IDAS Code in
the Queensiand Heritage Regulation 2003. if the development involves building work and the local govemment is not the
Assessment Manager for the application, the local government has jurisdiction as Concurrence Agency.
IPA, seheduie 8. pant 7. table §, item 2A, schedule 2 abies 1. 2.3.46 5, {P Reguiation, schedule 2, table 1. itant 114; IPA, section 1.3.5 (Definitions for tars used in davelogmant);
Queensland Hartaye Regulation 2003, schaduis 2 (DAS Code),
SREMOVING QUARRY:MATERIAL;‘WILD'RIVER AREA oe
EE PS. TREE LH
eRe!
1.2
Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
ml No-Gotoai3 [] Yes
It yes, is an allocation notice required under the Water Act 2000?
No 0 Yes
tyes, is any part of the removal of quarry material intended to pe located in a declared wild river area under the Wild
Rivers Act 2005?
O No — (Complete. Form 1, Part Kx) This application requires assessment by the Department of Natural Resources and Water (NRW), If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. ,
| YS - Unless the application is consistent with any property development plan applying to the fand, the Assessment Manager must refuse to receive it.
(Complete Form 1, Part K;). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005,
choduls B, past 1, table 8, ; IP Reguiaton, schedule 2, lable Z.itam 11 IP Raguiadon, schedide 1, table §, tam 2 (vv anea); Water Act 2000, section 9650; Wild Rivers Act
VIRONMENTALLY.RELEVANT ACTIVITY; WILD RIVER‘AREA if» sade! SEN
Does the proposal involve an environmentally relevant activity (ERA), other than a-mining acivity ora petroleum activity?
[SPNo-Gotoars [Yes
If yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
C)No
It no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every aspect of each
proposed ERA?
oO No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. ff the Administering Authority |s not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to 01.4
(1) Yes - Goto a1.
(Yes
Ifyes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters?
(J Yes
{f yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?
oO Yes - Unless the application is consistent with any property development ‘plan applying to the land, and the application is accompanied by an
allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. It the Administering Authority is not the Assessment Manager for the apptication, the e agency has jurisdiction as Concurrence
Agency.
oO No -An application for the ERA will be taken to be not proparly made and the Assessment Manager must refuse to receive it.
(1 No - Answer the following questions on the next page
‘+ In this IDAS Assessment Checklist, the term proposal refers to the proposed use, work or lot reconfiguration the subject of the application.
- Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1796 - Preliminary Building Approval - Roofed Patio [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.