Original source · versioned page text
Approved Plans - 132002.220270.3
Plans and drawings: the text below has words only, no drawings.
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
132002.220270.3 12 NOV 12
[OCR of page images]
8°54'05"
26.148
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
132002.220270.3 12 NOV 12
45.563
99°21"
xs
2
70:sq.m
EXISTING
IWORKSHOP/
STORAGE
EXISTING
CARPARK
Sy
1
PROPOSED ADDITION OVER
EXISTING FOOTPRINT TO
CONTAIN OFFICE ON
MEZZANINE UPPER FLOOR.
\
Y
\
@)
=>.
®,
A\ on
VO
oH
AV
EMTS
EMTR
49.977
17.787
188°53'55"
98°54'20"
SITE PLAN
gy
WV
GATEWAY DRIVE
RPD
LOT 2 ON SP 189445
PARISH OF TEWANTIN
COUNTY OF MARCH
SUNSHINE COAST REGIONAL COUNCIL
(NOOSA COUNCIL NOW
NORTHERN REGION)
NOTES
All survey pegs are to be
sited in position prior to the
commencement of any
construction.
All dimensions are in
millimetres U.N.O.
LEGEND:
EXISTING STRUCTURE
PROPOSED ADDITIONS
NOTE:
LEVELS & DIMENSIONS FOR
EXISTING STRUCTURE TO BE
VERIFIED ON SITE.
DO NOT SCALE.
NOTE:
BUILDING CLASSIFICATION 6, 7b & 9b
General Notes:
These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility to
further interpret the design and drawings to detail the project for construction.
The builder shall verify the location of all services.
All levels and dimensions are to be checked and verified by the builder on site prior to the commencement of any
work, making of shop drawings or fabrication of components.
DO NOT SCALE OFF DRAWINGS.
USE FIGURED DIMENSIONS.
Amendments:
Proposed Additions
To Existing Unit at
2/61 Gateway Dve, Noosaville
Lot 2 on SP 189445
for GMS Corp Pty Ltd
WORKING DRAWING
SITE PLAN
Scale: 1:200 @ A3
Drawn: JL
Signed:
Revision:
Sheet: 1 “)
Date: 27/9/10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
132002.220270.3 12 NOV 12
[OCR of page images]
5360 EXISTING
900 01980 2390 855
L
L
T
L
L
70 1540 70
890
900
1760
90
70
1980
3040 MEZZANINE
2060
3040 MEZZANINE
1120 70
[
|
90
90
<)
EXISTING
WORKSHOP!
STORAGE
12500 EXISTING INTERNAL
EX. STORAGE RACKS
12500 EXISTING INTERNAL
EX. STORAGE RACKS.
9460
9460
12/12
MEZZANINE/OFFICE
5360 EXISTING
2825
PLY FLOOR
exo
Siu UAUUAIILTAIM HI Hin LAAT NIAAA IA DzI.i0.J 0D £kl
NJ
NOTE:
LEVELS ARE ON AN ARBITRARY DATUM.
LEVELS & DIMENSIONS FOR EXISTING
STRUCTURE TO BE VERIFIED ON SITE.
DO NOT SCALE.
NOTE:
ALL OPENING SIZES ARE TO BE
CONFIRMED ON SITE BY CONTRACTOR.
C) GROUND FLOOR PLAN
C) MEZZANINE FLOOR PLAN
SUNSHINE COAST REGIONAL COUNCIL
132002.220270.3
APPROVED
12 NOV 12
NOTES:
STAIRS TO COMPLY WITH BCA D2.9 AND D2.13.
BALUSTRADES AND HANDRAILS TO.
COMPLY WITH D2.16 AND D2.17.
N3
STRUCTURAL DESIGN BASED UPON
NON-CYCLONIC N3 FOR WIND SPEEDS
TO 41 mis.
TERMITE PROTECTION
AS PER AUSTRALIAN STANDARD AS3660.1/2000
HATCHINGS AND FITTINGS ARE
INDICATIVE ONLY.
EXIT SIGNS TO BE IN ACCORDANCE WITH BCA E4.5
WHERE NO LINTEL SPECIFIED OVER OPENING
MINIMUM 90 x 35 F17 APPLIES.
ALL TIMBER FRAMING TO BE IN ACCORDANCE,
WITH THE CURRENT AS1684.2
LEGEND:
EXISTING STRUCTURE TO
BE RETAINED
NEW TIMBER FRAMED WALL
ED EXISTING DOOR
FRAMING SCHEDULE:
B1 200x63mm SMARTFRAME LVL BEAM
FJ1 140x45mm F27 HWD FLOOR JOISTS
P41 90x90mm HWD POST
PP1 140x45mm F27 HWD POLE PLATE
TOP PLATES 35x70/90 MGP10
STUDS 90/70x35 MGP10 @ 450 CRS
TOP PLATES 35x70/90 MGP10
(" STUDSATSIDESOF
OPENINGS
(2400 High Walls)
WIDTH OF | No, OF STUDS
OPENING | EACH SIDE
900
1200
1500
1800
2100
2400
a
FLOOR AREAS:
LOWER FLOOR
EX. WORKSHOP/STORE:
UPPER FLOOR
MEZZANINE/OFFICE:
67 sq/m
16.35 sq/m
OVERALL TOTAL: 83.35 sq/m
General Notes:
These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility to
further interpret the design and drawings to detail the project for construction.
The builder shall verify the location of all services.
All levels and dimensions are to be checked and verified by the builder on site prior to the commencement of any
work, making of shop drawings or fabrication of components.
DO NOT SCALE OFF DRAWINGS.
USE FIGURED DIMENSIONS.
Amendments:
Proposed Additions
To Existing Unit at
Lot 2 on SP 189445
for GMS Corp Pty Ltd
2/61 Gateway Dve, Noosaville
WORKING DRAWING
FLOOR PLANS
Scale: 1:100 @ A3 Date: 27/9/10
Drawn: JL Sheet: 2 of 3
Signed:
Revision:
Page 3
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
132002.220270.3 12 NOV 12
[OCR of page images]
EXISTING ROOF
|
JOINERY
EXISTING ROOF
EXISTING ROOF
QW NL/]/00,_,_/L_L_7_, FTY~“
PURLINS
PAINTED PBD SHEETING
WITH COVER BATTENS
FIXED TO TIMBER
FRAME WALLS
MEZZANINE RL 2.44
WINDOWS FIXED TO
MANUFACTURER'S SPEC
ALUMINIUM FRAMED
JOINERY
90 x 90 HWD.
TIMBER POST
TIMBER FRAMED
STAIRS FIXED TO
MANUFACTURER'S SPEC
EX. SLAB RL 0.00
75 MIN
ELEVATION A
SCALE 1:100
YELLOWTONGUE PLY
EXISTING OVER 140x45mm F27
WORKSHOP/ EXISTING CONCRETE HWD FLOOR JOISTS.
WALLS & SLAB BATTEN SCREW FLOOR
STORAGE JOISTS TO POLE PLATE
AND BEAM
MEZZANINE RL 2.44
MEZZANINE/OFFICE
ALUMINIUM FRAMED
WINDOWS FIXED TO
MANUFACTURER'S SPEC.
PAINTED PBD SHEETING
<—— WITH COVER BATTENS
FIXED TO TIMBER
FRAME WALLS
140x45mm F27 HWD
POLE PLATE FIXED TO
EXISTING WALL VIA
2/M12 BOLTS (TYPICAL)
EXISTING CONCRETE
WALLS & SLAB
4
EX. SLAB RL 0.00
|
90x90mm HWD POST
HOT DIP GALVANISED
BRACKET EITHER SIDE OF
<——— POST WITH 2/M12 BOLTS
FIX BRACKET TO EX. CONCRETE
SLAB VIA 2/M12 BOLTS
UZ LTCTTTTTaa——_———> es,
y
200x63mm SMARTFRAME LVL.
BEAM FIXED TO EXISTING WALL.
VIA GALVANISED BRACKET
EITHER END. 2/M12 BOLTS EACH
TO BEAM AND WALL
EXISTING
WORKSHOP/
STORAGE
DETAIL SECTION
~
NOTES:
STAIRS TO COMPLY WITH BCA D2.9 AND D2.13.
BALUSTRADES AND HANDRAILS TO
COMPLY WITH D2.16 AND D2.17.
N3
STRUCTURAL DESIGN BASED UPON
NON-CYCLONIC N3 FOR WIND SPEEDS
TO 41 mis.
TERMITE PROTECTION:
AS PER AUSTRALIAN STANDARD AS3660.1/2000
HATCHINGS AND FITTINGS ARE
INDICATIVE ONLY.
NOTE:
LEVELS ARE ON AN ARBITRARY DATUM.
LEVELS & DIMENSIONS FOR EXISTING
STRUCTURE TO BE VERIFIED ON SITE.
BO NOT SCALE.
NOTE:
ALL OPENING SIZES ARE TO BE
CONFIRMED ON SITE BY CONTRACTOR.
SCALE 1:50
/oi\ POST FOOTING DETAIL
Ye) SCALE 1:20 SUNSHINE COAST REGIONAL COUNCIL
APPROVED
132002.220270.3 12 NOV 12
Amendments: Proposed Additions WORKING DRAWING
General Notes:
These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility to
further interpret the design and drawings to detail the project for construction.
The builder shall verify the location of all services.
All levels and dimensions are to be checked and verified by the builder on site prior to the commencement of any
work, making of shop drawings or fabrication of components.
DO NOT SCALE OFF DRAWINGS.
USE FIGURED DIMENSIONS.
To Existing Unit at
Lot 2 on SP 189445
for GMS Corp Pty Ltd
2/61 Gateway Dve, Noosaville
ELEVATION & SECTION
DETAILS
Scale: As Shown @ A3 Date: 27/9/10
Drawn: JL
Signed:
Revision:
Sheet: 3 “)