RFI - Attachment 4 - Updated Stormwater Management Plan

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
STORMWATER MANAGEMENT PLAN
               FOR
   11 LEO ALLEY ROAD, NOOSAVILLE
               FOR

        DEVCON CAPITAL 9
        DATE: FEBRUARY 2021
        PROJECT NO: 192297
 REPORT NO: AG/AG/26719RPT ISSUE E
Log in to download the original file

RFI - Attachment 4 - Updated Stormwater Management Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 22 pages

Page 2

                                    STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                               Location: 11 Leo Alley Road, Noosavile


                               DOCUMENT ISSUE APPROVAL

Project No:                192297


Title:                     Stormwater Management Plan


Client:                    Devcon Capital 9


Date:                      February 2021


Issue:                     E


Distribution:              Noosa Council – Two (2) copies, 1 digital
                           Covey Associates – One (1) copy
                           Devcon Capital 9 – One (1) copy



© Copyright Covey Associates Pty Ltd (2021).

This document is the property of Covey Associates Pty Ltd. This document and the information
contained in it are solely for the use of the authorised recipient and this document may not be used,
copies of reproduced in whole or part for any purpose other than that for which it was supplied by
Covey Associates Pty Ltd. Covey Associates Pty Ltd makes no representation, undertakes no
duty and accepts no responsibility to any third party who may use or rely upon this document or the
information contained in it.

COPYRIGHT NOTICE:                Parts of this document contain material originally prepared by:

This material is the intellectual property and copyright of Covey Associates Pty Ltd.




Author: Allister Gaffney                                     Reviewed: Mark Cumming
        BEng (Hons), MEng                                             BEng (Hons), RPEQ

Page 3

                                       STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                            Location: 11 Leo Alley Road, Noosaville


                                               CONTENTS

1.0 INTRODUCTION                                                                                         1

2.0 SITE DESCRIPTION                                                                                     1

       2.1     Site Location                                                                             1

       2.2     Proposed Land-use                                                                         1

3.0 STORMWATER QUALITY MANAGEMENT                                                                        2

       3.1     Water Quality Objectives                                                                  2

      3.2 Water Quality Modelling                                                                        2
     3.2.1 MUSIC Model Parameters                                                                        2
     3.2.2       Scenario Method                                                                         3
     3.2.3       Proposed Stormwater Treatment Train                                                     4
     3.2.4       MUSIC Model Results                                                                     4

      3.3 Bioretention Basin Maintenance                                                                 5
     3.3.1 ‘Construction Period’ Maintenance                                                             5
     3.3.2       ‘Maintenance Period’ Maintenance                                                        5

4.0 STORMWATER QUANTITY MANAGEMENT                                                                       5

5.0 CONCLUSION                                                                                           7

6.0 REFERENCES                                                                                           7




                                           LIST OF APPENDICES
APPENDIX A                 Site Plan
APPENDIX B                 MUSIC Model
APPENDIX C                 Stormwater Calculations
APPENDIX D                 Pre-lodgement Meeting Notes

Page 4

                                  STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                               Location: 11 Leo Alley Road, Noosaville


1.0 INTRODUCTION
This Stormwater Management Plan (SMP) has been commissioned by Leo Alley Drive
Developments Pty Ltd (PWH) to support a development application for 11 Leo Alley Road,
Noosaville. This SMP contains information relating to the stormwater quality and quantity
management of runoff associated with the development.

Noosa Shire Council (NSC) requires that stormwater quality and quantity be appropriately managed
and treated prior to discharge from the site. The Queensland State Planning Policy (SPP 2017) also
requires that urban development projects demonstrate how the potential impacts to receiving
environments are mitigated. The objective of this SMP is to outline the requirements for effective
stormwater management for the development in its entirety.

2.0 SITE DESCRIPTION

2.1      Site Location

The proposed development is located at 11 Leo Alley Road, Noosaville. The real property description
is Part of Lot 252 on SP104257. Refer to Figure 1 for further detail.

The site is approximately 0.5 ha in size and has compacted hardstand for an existing landscaping
supply business.




      Figure 1 – Site Locality (courtesy of Nearmap.com, accessed 4 June 2019, dated 27 May 2019)

2.2      Proposed Land-use

The proposal is for an industrial complex consisting of 21 industrial units and associated
infrastructure. Refer to the enclosed site plan in Appendix A for more details.




Covey Associates Pty Ltd                             1                                  Project No: 192297
Consulting Engineers                                                                      26719Rpt, Issue E

Page 5

                                       STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                                  Location: 11 Leo Alley Road, Noosaville


3.0 STORMWATER QUALITY MANAGEMENT

3.1 Water Quality Objectives

This section of this SMP will demonstrate how the proposed stormwater quality management
strategy complies with the requirements of NSC and the SPP (2017) in terms of demonstrating how
the relevant stormwater pollutant reduction objectives will be met.

Stormwater runoff generated from the site must achieve the required pollutant reduction targets
(Table 1) and be demonstrated through the use of appropriate modelling software.

                       Table 1 – Pollutant Reduction Targets for South East Queensland
           Pollutant Type                                    Reduction Objective
   Total Suspended Solids (TSS)              80% reduction in average annual load of pollutants
      Total Phosphorus (TP)                  60% reduction in average annual load of pollutants
         Total Nitrogen (TN)                 45% reduction in average annual load of pollutants
       Gross Pollutants (GP)                 90% reduction in average annual load of pollutants

The proposed development ultimately drains to the Noosa River located approximately 1.9 km to the
north of the site. Table 2 outlines the specific performance criteria required within receiving waters
for the Noosa River, as identified in the Environmental Values and Water Quality Objectives – Basin
No. 140 (Part), including Kin Kin Creek, Teewah coastal creeks, Lakes Cooroibah, Cootharaba,
Doonella and Weyba (Environmental Pretection Water Policy, 2010). The proposed development is
identified on Plan WQ1413 of the Environmental Protection (Water) Policy (2009) Southeast
Queensland Map Series as being coastal freshwaters.
 Table 2 – Noosa River Environmental Values and Water Quality Objectives (as per WQO’s for coastal
                                           freshwaters)
                           Pollutant                             Water Quality Objectives
                       Turbidity                                         <10 NTU
                Suspended Solids (SS)                                     <6 mg/L
                     Chlorophyll a                                         <5 µg/l
                    Total Nitrogen                                       <500 µg/L
                  Oxidised Nitrogen                                      <60 µg/L
                  Ammonia Nitrogen                                       <20 µg/L
                  Inorganic Nitrogen                                     <420 µg/L
                   Total Phosphorus                                      <50 µg/L
           Filterable Reactive Phosphorus                                <20 µg/L
           Dissolved Oxygen (% saturation)                         85 – 110 % saturation
                          pH                                              6.5 – 8.0
                     Conductivity                                       500 µS/cm

3.2 Water Quality Modelling

3.2.1 MUSIC Model Parameters
The MUSIC Modelling Guidelines – South East Queensland Version 1.0 (2010) was used to source
base and storm flow concentrations and runoff generation. The model used rainfall data from the
Bureau of Meteorology (BoM) Cooroy Rainfall Station, over a ten (10) year period (1973 – 1983) at
a 6 minute time step. This adopted rainfall station and period is in accordance with Water by Design’s
MUSIC Modelling Guidelines – South East Queensland Version 1.0 (2010). All source nodes were
set up in accordance with this guideline, specifically for split catchments. Commercial and industrial
rainfall-runoff parameters and industrial pollutant export parameters have been used for each split


Covey Associates Pty Ltd                                2                                  Project No: 192297
Consulting Engineers                                                                         26719Rpt, Issue E

Page 6

                                STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                              Location: 11 Leo Alley Road, Noosaville


catchment source node. No routing of drainage links was adopted for the purpose of taking a
conservative approach. This approach assumes that the flow through the drainage system takes no
time, which over estimates the likely pollutant load. MUSIC version 6.3.0 was used for this
assessment. Copies of the MUSIC models are found in Appendix B.

3.2.2 Scenario Method
The proposed development was modelled using split catchment source nodes, comprised of roof
area, driveway and landscaping nodes. It is considered that each catchment needs to achieve the
required pollutant reduction targets. The total area of the proposed development is approximately
0.5 ha, and consists of 21 industrial units. The development has been split into two (2) catchments
(catchment A and B). Refer to Table 3 and Figure 2 for detail.

                               Table 3 – Catchment Characteristics
                                Roof (ha)             Driveway (ha)              Landscape (ha)
  Fraction Impervious            100%                     100%                        0%
      Catchment A                0.208                    0.127                      0.014
      Catchment B                0.033                    0.053                      0.008

A portion of the landscape area within catchment A and B is proposed to bypass the bioretention
basin within each catchment respectively. Refer to Figure 2 for the MUSIC map and Appendix B for
the MUSIC model for further information.




                                   Figure 2 – MUSIC Model Map



Covey Associates Pty Ltd                          3                                    Project No: 192297
Consulting Engineers                                                                     26719Rpt, Issue E

Page 7

                                       STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                                     Location: 11 Leo Alley Road, Noosaville


3.2.3 Proposed Stormwater Treatment Train
The stormwater runoff from each catchment will be treated by bioretention basins. Two (2)
bioretention basins are proposed for the development (Bioretention Basin A and B). The filter media
of each bioretention basin was modelled using a total nitrogen content of 400 mg/kg and an
orthophosphate content of 30 mg/kg. This is in accordance with the MUSIC Modelling guidelines
(consultation draft) by Water by Design (2018). Refer to Table 4 for the bioretention basin
characteristics.

                                   Table 4 – Bioretention Basin Characteristics
                                          Bioretention Basin A              Bioretention Basin B
      Extended Detention (m)                      0.30                              0.30
          Filter Depth (m)                        0.50                              0.50
        Surface Area (m2)                        35.00                             10.00
          Filter Area (m2)                       35.00                             10.00


3.2.4 MUSIC Model Results

MUSIC modelling of the proposed catchments was performed to ensure the nominated treatment
strategy achieves the required pollutant reduction objectives. The target reductions in stormwater
pollutants are based on a comparison of an unmitigated scenario, having no treatment on site, and
the mitigated scenario, which has stormwater treatment measures incorporated onto the site. Tables
5 and 6 provide the results of the modelling for catchment and Table 7 provides the modelling results
for the development in its entirety. The MUSIC modelling demonstrates that compliance has been
met or exceeded for the objectives required by NSC and the SPP (2017) for Total Suspended Solids
(TSS), Total Phosphorus (TP), Total Nitrogen (TN) and Gross Pollutants (GP).

                                 Table 5 - MUSIC Model Results for Catchment A
                  Unmitigated           Mitigated       Reduction           Target
 Pollutant                                                                                     Compliance
                    (kg/yr)              (kg/yr)       Achieved (%)      Reduction (%)
    TSS               949                  178              81                80                       Y
     TP              1.91                 0.498            73.9               60                       Y
    TN               11.8                 5.82             50.7               45                       Y
    GP                114                   0              100                90                       Y

                                 Table 6 - MUSIC Model Results for Catchment B
                  Unmitigated           Mitigated       Reduction           Target
 Pollutant                                                                                     Compliance
                    (kg/yr)              (kg/yr)       Achieved (%)      Reduction (%)
    TSS               378                   63             83.4               80                       Y
     TP              0.651                0.15              77                60                       Y
    TN                3.1                  1.5             52.7               45                       Y
    GP               29.2                    0             100                90                       Y

                           Table 7 - MUSIC Model Results for Overall Development Area
                  Unmitigated           Mitigated       Reduction           Target
 Pollutant                                                                                     Compliance
                    (kg/yr)              (kg/yr)       Achieved (%)      Reduction (%)
    TSS              1360                  272              80                80                       Y
     TP              2.64                 0.728            72.4               60                       Y
    TN               15.4                 7.82             49.3               45                       Y
    GP                143                   0              100                90                       Y




Covey Associates Pty Ltd                                  4                                   Project No: 192297
Consulting Engineers                                                                            26719Rpt, Issue E

Page 8

                                 STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                               Location: 11 Leo Alley Road, Noosaville


3.3 Bioretention Basin Maintenance

The proposed bioretention basins will require consideration and management during both the
construction period and maintenance period of the development. In order to establish vegetation and
treatment functions in the bioretention systems, the filter media will require protection from the
common pollutants generated in the construction phases of the development. During the operational
phase, regular maintenance is required to ensure a comprehensive vegetation establishment, a
critical component in stormwater pollutant uptake. Below are details on the general maintenance
periods and the requirements for the construction and maintenance periods.

3.3.1 ‘Construction Period’ Maintenance

Erosion and sediment control devices will be installed at the commencement of the works to capture
and treat runoff during construction works. The sediment control devices should be cleaned out as
required and at the end of the works. During the construction stage, all sediment control devices are
to be inspected weekly, after runoff generating rain events and prior and after prolonged site shut
downs (e.g. holiday periods). Proposed bioretention basins may be excavated and used as a
sediment basin.

Any sediment basin will require regular, weekly inspection to prevent scour and sediment build up.
Basins should be inspected regularly and cleaned out when 1/3rd full. At the completion of
construction, the sediment basins will be removed. The bioretention basin will be installed at the end
of the building construction phase when the site is stabilised.

3.3.2 ‘Maintenance Period’ Maintenance

The bioretention basins will be temporarily turfed during the maintenance period. Once construction
of 80% of the site in each catchment of the development is complete, the turf will be removed and
the basins will be vegetated appropriately.

4.0 STORMWATER QUANTITY MANAGEMENT
The majority of the existing site is considered to be hardstand as the current use of the site is for
storing landscape supplies which are normally delivered and taken away from the site using heavy
vehicles. Due to the proposed development the fraction impervious of the site increases slightly from
80% in the existing case to 83% in the developed case. The time of concentration in both cases is
effectively the same as both sites have a similar fraction impervious.

The subject site has an existing stormwater pit which is identified to be a lawful point of discharge.
The existing underground stormwater network is currently connected to this pit. The stormwater pit
is located in an easement which discharges to an existing 300mm RCP stormwater main. The
existing stormwater network ultimately discharges to Eenie Creek located approximately 500m to
the south.

A stormwater drainage system is proposed for the development which incorporates a bioretention
basin and an underground drainage network. The northern portion of the site will discharge
stormwater to the east by connecting to the existing stormwater network within the easement. In the
event that the stormwater pit over tops stormwater will discharge as overland flow to the grassed
area located to the east as it does in the existing case.

The southern portion of the site will discharge to the existing stormwater manhole located in Leo
Alley Road to the south. In the event that the proposed network overtops stormwater will discharge
as overland flow to the Leo Alley Road roadway and enter the existing stormwater network via the
existing gully pits located downstream on Production Street as it does in the existing case.


Covey Associates Pty Ltd                            5                                   Project No: 192297
Consulting Engineers                                                                      26719Rpt, Issue E

Page 9

                                      STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                                   Location: 11 Leo Alley Road, Noosaville


For your information, the peak stormwater discharge from the site for both the existing case and
developed case was estimated based on the Rational Method (as defined in the Queensland Urban
Drainage Manual 2017), aerial images and council mapping. The parameters used and calculations
are shown in Appendix C.

In summary the peak stormwater discharges are shown in Table 6.

                                 Table 6 – Total Site Peak Stormwater Discharge

                                         Peak Stormwater Discharge
                           AEP (%)                 (L/s)                     Difference
                                       Existing Case    Developed Case
                       10 (minor)           209                210                +0.5%
                      100 (major)           358                361                +0.8%

The results show that there is an increase in peak stormwater discharge from the site in the
developed case when compared to the existing case. However, as the increase in stormwater
discharge is minor (less than 1% in the major storm event) the effect on downstream and
neighbouring properties is considered to be insignificant and negligible.

The peak major storm event discharge to the stormwater main to the east in the easement is
estimated to be 144 L/s via a 225mm RPC pipe. The downstream pipe from development connection
point is a 300mm RCP stormwater main at approximately 2.5% grade. The capacity of the
stormwater main has been approximated to be 180 L/s. Therefore, the stormwater main has the
capacity to cater for the piped stormwater flow from the proposed development.

Further, all stormwater discharging from the site in the developed case will discharge to a
bioretention basin which will have an extended detention depth of 300mm. This equates to
approximately 13.5 kL of total stormwater detention storage for the site. The stormwater detention
volume was not considered in the calculation of peak stormwater discharge from the developed site.
The peak stormwater discharge values are therefore considered to be conservative and the peak
stormwater discharge from the proposed development is likely to be less than the existing case
scenario. Therefore, the proposed development will have a non-worsening effect on surrounding and
adjacent properties with regards to stormwater discharge.

At the pre-lodgement meeting held for the proposed development, council did not have any
objections with regards to using stormwater treatment devices to provide stormwater
detention/mitigation as shown in Appendix D.




Covey Associates Pty Ltd                                 6                                  Project No: 192297
Consulting Engineers                                                                          26719Rpt, Issue E

Page 10

                                  STORMWATER MANAGEMENT PLAN
Client: Devcon Capital 9                                                  Location: 11 Leo Alley Road, Noosaville



5.0 CONCLUSION
It can be seen in the results presented in Tables 5 & 6 that the stormwater treatment measures
designed for the proposed industrial complex achieve the performance criteria for water quality set
by the NSC and by the SPP (2017). Annual load reductions of TSS, TP, TN and GP between the
mitigated and unmitigated MUSIC model scenarios have been met or exceeded.
The stormwater treatment measures for the proposed development were designed to achieve the
maximum cost/benefit ratio for the optimal hydraulic loading of the treatment measures. Water
Sensitive Urban Design (WSUD) measures have been proposed for the site and water quality
modelling has demonstrated that the effective treatment of key pollutants is possible.

Sufficient consideration of stormwater controls has been demonstrated by:

 •    Compliance with the requirements of Noosa Shire Council’s Load Based Reduction Objectives;
 •    Compliance with Queensland State Planning Policy (2017);
 •    Compliance with Urban Stormwater Quality Planning Guidelines (2010);
 •    Compliance with QUDM (2013); and,
 •    Compliance with the EPP (Water) 1997

Further, as the fraction impervious of the existing site is similar to that of the proposed development
there is a very minor increase in stormwater peak flows which is considered to be insignificant and
negligible. Further, the proposed bioretention basins will assist in mitigating stormwater peak flows
due to their extended stormwater detention depth. The proposed development will there have a non-
worsening effect on adjacent and surrounding properties.

This site, based on this SMP has demonstrated that efficient management of stormwater quality and
quantity is possible by the management strategies nominated for the proposed development.


6.0 REFERENCES
Healthy Waterways (2006), Water Sensitive Urban Design Technical Design Guidelines for South East
       Queensland, Brisbane

Department of State Development, Infrastructure and Planning (2017) State Planning Policy. Brisbane,
     Queensland.

Department of Environment and Resource Management (2010) Urban Stormwater Quality Planning
     Guidelines. Queensland, Australia.

Water by Design (2010) MUSIC Modelling Guidelines. SEQ Healthy Waterways Partnership. Brisbane,
     Queensland. IBSN 978-0-9806278-4-8.

CSIRO, 1999, Urban Stormwater: Best Practice Management Guidelines

Water by Design (2012), Bioretention Technical Design Guidelines (Version 1), Healthy Waterways Ltd,
    Brisbane.

Institute of Public Works Engineering Australia, Queensland Division Ltd (2013) Queensland Urban
        Drainage Manual, Third Edition.

Water by Design (2012), Maintaining Vegetated Stormwater Assets (Version 1), Healthy Waterways Ltd,
    Brisbane.



Covey Associates Pty Ltd                              7                                    Project No: 192297
Consulting Engineers                                                                         26719Rpt, Issue E

Page 11

APPENDIX A
SITE PLANS


[OCR of page images]
APPENDIX A
SITE PLANS

Page 12

                                                                                                                                                                                                     LEGEND

                                                                     MRV
                                                                     BAY

                                           AMENITIES
                                                   FFL 13.50

                                                                       5                 6                7           8           9           10
                                                                    FFL 13.35      FFL 13.15           FFL 13.15   FFL 12.95   FFL 12.95   FFL 12.85




                               4
                        FFL 13.50
                                                                                                                                                                         ²


         PARKING
                                                                                                                                                                                                          FFL




                                                                                                                                                       RL 12.15
                                                                       17               18               19           20          21
                                                                    FFL 13.35      FFL 13.15           FFL 13.15   FFL 12.95   FFL 12.95




                              3
                        FFL 13.50




                                                                       16               15                14          13          12          11
                                                                    FFL 13.35      FFL 13.15           FFL 13.15   FFL 12.95   FFL 12.95   FFL 12.85                                                  STORMWATER DRAINAGE NOTES




                              2
                        FFL 13.50

                                                                                             ²




         PARKING



                               1
                        FFL 13.30



                                                                                                                                                                       BIN WASH AREA DETAIL

               STORMWATER MANAGEMENT PLAN - NORTH




SCALE 1:400 (A3)                                                                                          STORMWATER MANAGEMENT PLAN - SOUTH

                                                                                Consulting Civil &                                                                PROPOSED INDUSTRIAL                                     192297   C001
                                                                                Structural Engineers                            STORMWATER                        COMPLEX                11 LEO ALLEY ROAD,                          E
                                                                                Project Management                              MANAGEMENT PLAN                   DEVCON CAPITAL 9 PTY   NOOSAVILLE
             APPROVAL                                                           & Planning                                                                        LTD
                        Issue Date   Description               By

Page 13

                                           CONCRETE SPOON DRAIN DETAIL




                                                                                                                                             SCALE 1:40 (A3)




                                                         Consulting Civil &                     PROPOSED INDUSTRIAL                         192297             C120
                                                         Structural Engineers   SITE SECTIONS   COMPLEX                11 LEO ALLEY ROAD,                        C
                                                         Project Management                     DEVCON CAPITAL 9 PTY   NOOSAVILLE
APPROVAL                                                 & Planning                             LTD
           Issue Date   Description   By

Page 14

                                                                                                                                                                                                          SECTION            Y
                                                                                                                                                                                                          SCALE 1:40 (A3)   C001
TYPICAL BIORETENTION BASIN AND OVERFLOW PIT DETAIL
                                                 SCALE 1:40 (A3)

                                                                                                               TYPICAL BIORETENTION CLEANOUT DETAIL
                                                                                                                               SCALE 1:40 (A3)




                                  290




                  BIORETENTION BASIN
            This bioretention basin reduces the pollution of
              our waterways by reducing the amount of
              heavy metals, litter, suspended solids, and
                                                                    210




             nutrients discharged to the nearby waterway.




                                                                                                                                                                                                                                    SCALE 1:40 (A3)


            BIORETENTION EDUCATION SIGN                                                                                                          SECTION            X
TO BE FIXED USING S/S SCREWS TO POST OR FENCE AT EACH BIORETENTION BASIN IN                                                                                                                                                         SCALE 1:200 (A3)
                                                                                                                                                 SCALE 1:40 (A3)   C001
              A PUBLIC AREA OR VISIBLE TO PUBLIC FROM FOOTPATH
                               NOT TO SCALE




                                                             SECTION THROUGH DRIVEWAY - WESTERN SIDE (EASTERN SIDE DIFFERS)




                                                                                        Consulting Civil &                                                                PROPOSED INDUSTRIAL                                      192297              C300
                                                                                        Structural Engineers                  STORMWATER DETAILS                          COMPLEX                11 LEO ALLEY ROAD,                                      C
                                                                                        Project Management                                                                DEVCON CAPITAL 9 PTY   NOOSAVILLE
               APPROVAL                                                                 & Planning                                                                        LTD
                                  Issue Date          Description             By

Page 15

                                                                                                                                                 LEGEND
                             AMENITIES


                                           5             6             7    8           9         10




                 4




                                           17          18       19          20          21
                                                        CATCHMENT A




                 3



                                                                                                                                                   CATCHMENT AREAS (m²)
                                           16          15              14   13          12        11




                                                                                 CATCHMENT D




                                                                                                                                               1% AEP PEAK FLOW CALCULATION
                 2




                   CATCHMENT B




                 1
                                                                                                                                  BIORETENTION BASIN WEIR FLOW CALCULATION




                           CATCHMENT C




                                                                                                               SCALE 1:400 (A3)



                                                Consulting Civil &                                            PROPOSED INDUSTRIAL                                 192297      C380
                                                Structural Engineers                   STORMWATER CATCHMENT   COMPLEX                11 LEO ALLEY ROAD,                         D
                                                Project Management                     PLAN                   DEVCON CAPITAL 9 PTY   NOOSAVILLE
APPROVAL                                        & Planning                                                    LTD
           Issue Date   Description   By

Page 16

   APPENDIX B
  MUSIC MODEL
(ELECTRONIC COPY)


[OCR of page images]
APPENDIX B
MUSIC MODEL
(ELECTRONIC COPY)

Page 17

      APPENDIX C
STORMWATER CALCULATIONS


[OCR of page images]
APPENDIX C
STORMWATER CALCULATIONS

Page 18

Peak Stormwater Discharge Calculations

Stormwater calculations were completed in accordance with the rational method explained in
Queensland Urban Drainage Manual (2017) and with reference to the site plans shown in
Appendix A.

                   Table C.1 – Total Site Peak Stormwater Discharge Calculations

      Catchment        tc (min)   fi(%)    AEP (%)        C      I (mm/h)   A (m2)   Q (l/s)
                                                10      0.86       175                209
   Existing Case         10        80                                        4999
                                              100       1.03       250                358
                                                10      0.87       175                210
  Developed Case         10        83                                        4999
                                              100       1.04       250                361


Tc            = adopted time of concentration
Fi            = fraction impervious
AEP           = annual recurrence interval
C             = coefficient of discharge
I             = intensity
A             = catchment area
Q             = peak flow rate

Page 19

         APPENDIX D
PRE-LODGEMENT MEETING MINUTES


[OCR of page images]
APPENDIX D
PRE-LODGEMENT MEETING MINUTES

Page 20

Noosa Council documents




                                                                            PRE-LODGEMENT NOTES
                                                                            Development Assessment



                 1.      PRE-LODGEMENT MEETING DETAILS

                   Application No:                       PLM19/0013

                   Date:                                 4 April 2019

                   Applicant Attendees:                  Toby Zaremba: Formia Project Management
                                                         Mark Cumming: Covey Associates
                                                         Josh Edwards: Stilhaus
                                                         Ella King: Innovative Planning Solutions

                   Council Attendees:                    Patrick Murphy, Coordinator Planning
                                                         Mark Lewis, Coordinator Development Engineering

                 2.      PROPOSAL

                   Street address:                       11 Leo Alley Rd NOOSAVILLE QLD 4566

                   Real property description: Lot 252 SP 104257

                   Planning Scheme:                      Noosa Plan (June 2018)

                   Proposal Details:                     Industrial Development Type 1 – Warehouse (26 units)

                 3.      SUPPORTING INFORMATION (PROVIDED BY THE APPLICANT)

                   Documents / Plans

                   Site Plan prepared by brd group dated March 2019



                 4.      PLANNING SCHEME INFORMATION

                   Development Type:                     OPW                       ROL                     MCU           x        BA

                   Level of Assessment:              Code

                   Planning Locality:                Noosaville

                   Overlays:                         Natural Hazard Overlay: Acid Sulfate Soils

                   Zone:                             Industry




                  This document is a record of pre-lodgement discussions and will not be made available for public viewing. Pre-lodgement
                  discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
                  applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to
                  an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
                  development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
                  assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
Document Set ID: 20847782
Version: 5, Version Date: 11/04/2019                                                                                             Print Date: 11 April 2019, 11:17 AM

Page 21

Noosa Council documents




                 5.      ADVICE & INFORMATION

                 Patrick Murphy, Coordinator Planning - Comments
                 1.      The proposal involves the development of 26 industrial units proposed to be used for
                         the purpose of Industrial Business Type 1 – Warehouse. A total of 2610m2 of floor area
                         is proposed, 2191m2 at ground floor and 419m2 of mezzanine. The proposed
                         development requires a development approval.
                 2.      Industrial Business Type 1 – Warehouse is a consistent use within the Industry zone in
                         the Noosaville locality requiring code assessment.
                 3.      The applicable codes are:
                             Noosaville Locality Code
                             Business Uses Code
                             Landscaping Code
                             Engineering Works Code
                 4.      It is acknowledged that limited information has been provided (no elevation plans)
                         however based on the site pans it is noted that:
                             The 2610m2 of floor area and 1 caretakers unit results in a requirement for 53.2 car
                              spaces. Car spaces within the industrial units are not supported and therefore the
                              23 external car spaces and 5 motorcycle spaces results in a significant shortfall in
                              car parking. Any application will need to demonstrate compliance with the minimum
                              car parking requirements of the Driveways and car parking Code.
                             The proposal complies with the required 6 metre frontage setback and the 3 metre
                              setback requirement to the Shire Business Centre zone.
                             Approximately 18.9% of the site is allocated for landscaping which complies with the
                              minimum requirement of the planning scheme. In this regard it is preferable that bio-
                              basins and transformer location do not intrude into the front setback and that this
                              area is preserved for landscaping.
                 5.      The maximum building height is 8.0 metres from both finished and natural ground level.
                 6.      Whilst no elevation plans have been provided it is noted that the Noosa Plan includes
                         built form requirements for industrial buildings including the Specific Outcomes and
                         Probable Solutions for the Industry Zone including:
                                 Buildings are designed and sited to provide visual interest and amenity by—
                                 a) providing well articulated buildings with strong horizontal and vertical design No
                                 solution provided 11-80 The Noosa Plan Including amendments to 8 June 2018
                                 column 1 Specific Outcomes column 2 Probable solutions elements and features;
                                 b) using a variety of external building materials within external walls where such
                                 walls are visible from the street; and
                                 c) providing for interesting and varied site layouts and roof designs;


                 Mark Lewis, Coordinator Development Engineering - Comments
                 Easements.
                 1.      It is noted that the submitted site plan indicates that the easements within the site are
                         ‘Council” easements. This is incorrect. The easements are in favour of Unitywater
                         (sewer) and Council’s mapping system indicates that the stormwater easement adjacent
                         to the eastern boundary is a “private” easement. It is suggested that a title search be


                  This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
                  discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
                  applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to
                  an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
                  development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
                  assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
Document Set ID: 20847782
Version: 5, Version Date: 11/04/2019                                                                                             Print Date: 11 April 2019, 11:17 AM

Page 22

Noosa Council documents




                         undertaken to determine easement rights and terms. The search will also provide some
                         direction regarding building structures and services within the easements.
                 Stormwater
                 2.      The issue of whether the current site’s condition could be considered for “non-
                         worsening” calculations was discussed. Council advised that it did not have much
                         information on the site and the drainage considerations as the development was a
                         “State” development. It was suggested that the capacity of the downstream drainage
                         system especially along the eastern boundary, was a constraining factor. It was
                         discussed that there was opportunity to provide some detention within the treatment
                         areas (adjacent to the eastern carpark and at the entrance to the site) to ensure that
                         runoff did not exceed the capacity of the downstream system and create drainage issues
                         for the adjoining properties.
                 3.      The question of ownership and dimensions of the downstream drainage system was
                         discussed. Council’s assets section have advised that the drainage system adjacent to
                         the site’s eastern boundary is a private drainage system.
                 Traffic
                 4.      The issue of heavy/service vehicles was discussed. It was suggested that given the size
                         of the individual tenancies, that it was unlikely that large vehicles would be required. Any
                         application would need to demonstrate the type of vehicle required for the proposed
                         development.
                 5.      There is no dedicated loading area indicated on the plans. Any application would need
                         to demonstrate that loading/unloading to/from delivery vehicles can be undertaken on
                         site without impacting on through traffic or customer carspaces
                 5.      The vehicle path to the waste collection area must be suitable for Council’s waste
                         collection vehicle as described in The Noosa Plan - Planning Scheme Policies 9 and 11.
                         It would appear from the submitted plan that the waste collection area may not be
                         sufficient to cater for the whole of the development. Any application would need to
                         include areas and a waste management plan in accordance with The Noosa Plan -
                         Planning Scheme Policies 9 and 11
                 6.      The width of the access driveway in the road reserve indicated on the submitted plan
                         appears to be excessive. It is suggested that the driveway be designed to the minimum
                         required to service the development.
                 6.      INFRASTRUCTURE CHARGES

                 A request for written advice for an Infrastructure Charges Contribution Estimate relevant to
                 your proposal may be obtained for a fee.
                 7.      FURTHER ADVICE TO BE SOUGHT

                 You are advised to contact Unitywater and any relevant Queensland Government Agencies
                 for their specific requirements in respect of your proposal.
                 Yours Faithfully




                  This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
                  discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
                  applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to
                  an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
                  development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
                  assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
Document Set ID: 20847782
Version: 5, Version Date: 11/04/2019                                                                                             Print Date: 11 April 2019, 11:17 AM

Page 23

Noosa Council documents




                 Patrick Murphy
                 Coordinator Planning




                  This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
                  discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
                  applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to
                  an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
                  development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
                  assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
Document Set ID: 20847782
Version: 5, Version Date: 11/04/2019                                                                                             Print Date: 11 April 2019, 11:17 AM

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.