RFI - Attachment 4 - Updated Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSTORMWATER MANAGEMENT PLAN Client: Devcon Capital 9 Location: 11 Leo Alley Road, Noosaville 5.0 CONCLUSION It can be seen in the results presented in Tables 5 & 6 that the stormwater treatment measures designed for the proposed industrial complex achieve the performance criteria for water quality set by the NSC and by the SPP (2017). Annual load reductions of TSS, TP, TN and GP between the mitigated and unmitigated MUSIC model scenarios have been met or exceeded. The stormwater treatment measures for the proposed development were designed to achieve the maximum cost/benefit ratio for the optimal hydraulic loading of the treatment measures. Water Sensitive Urban Design (WSUD) measures have been proposed for the site and water quality modelling has demonstrated that the effective treatment of key pollutants is possible. Sufficient consideration of stormwater controls has been demonstrated by: • Compliance with the requirements of Noosa Shire Council’s Load Based Reduction Objectives; • Compliance with Queensland State Planning Policy (2017); • Compliance with Urban Stormwater Quality Planning Guidelines (2010); • Compliance with QUDM (2013); and, • Compliance with the EPP (Water) 1997 Further, as the fraction impervious of the existing site is similar to that of the proposed development there is a very minor increase in stormwater peak flows which is considered to be insignificant and negligible. Further, the proposed bioretention basins will assist in mitigating stormwater peak flows due to their extended stormwater detention depth. The proposed development will there have a non- worsening effect on adjacent and surrounding properties. This site, based on this SMP has demonstrated that efficient management of stormwater quality and quantity is possible by the management strategies nominated for the proposed development. 6.0 REFERENCES Healthy Waterways (2006), Water Sensitive Urban Design Technical Design Guidelines for South East Queensland, Brisbane Department of State Development, Infrastructure and Planning (2017) State Planning Policy. Brisbane, Queensland. Department of Environment and Resource Management (2010) Urban Stormwater Quality Planning Guidelines. Queensland, Australia. Water by Design (2010) MUSIC Modelling Guidelines. SEQ Healthy Waterways Partnership. Brisbane, Queensland. IBSN 978-0-9806278-4-8. CSIRO, 1999, Urban Stormwater: Best Practice Management Guidelines Water by Design (2012), Bioretention Technical Design Guidelines (Version 1), Healthy Waterways Ltd, Brisbane. Institute of Public Works Engineering Australia, Queensland Division Ltd (2013) Queensland Urban Drainage Manual, Third Edition. Water by Design (2012), Maintaining Vegetated Stormwater Assets (Version 1), Healthy Waterways Ltd, Brisbane. Covey Associates Pty Ltd 7 Project No: 192297 Consulting Engineers 26719Rpt, Issue E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.