Skip to the record
Beware of cheap imitations.

Original source · versioned page text

RFI - Attachment 4 - Updated Stormwater Management Plan

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                 LEGEND
                             AMENITIES


                                           5             6             7    8           9         10




                 4




                                           17          18       19          20          21
                                                        CATCHMENT A




                 3



                                                                                                                                                   CATCHMENT AREAS (m²)
                                           16          15              14   13          12        11




                                                                                 CATCHMENT D




                                                                                                                                               1% AEP PEAK FLOW CALCULATION
                 2




                   CATCHMENT B




                 1
                                                                                                                                  BIORETENTION BASIN WEIR FLOW CALCULATION




                           CATCHMENT C




                                                                                                               SCALE 1:400 (A3)



                                                Consulting Civil &                                            PROPOSED INDUSTRIAL                                 192297      C380
                                                Structural Engineers                   STORMWATER CATCHMENT   COMPLEX                11 LEO ALLEY ROAD,                         D
                                                Project Management                     PLAN                   DEVCON CAPITAL 9 PTY   NOOSAVILLE
APPROVAL                                        & Planning                                                    LTD
           Issue Date   Description   By
Log in to download the original file

RFI - Attachment 4 - Updated Stormwater Management Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.