RFI - Attachment 4 - Updated Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSTORMWATER MANAGEMENT PLAN Client: Devcon Capital 9 Location: 11 Leo Alley Road, Noosaville 3.2.3 Proposed Stormwater Treatment Train The stormwater runoff from each catchment will be treated by bioretention basins. Two (2) bioretention basins are proposed for the development (Bioretention Basin A and B). The filter media of each bioretention basin was modelled using a total nitrogen content of 400 mg/kg and an orthophosphate content of 30 mg/kg. This is in accordance with the MUSIC Modelling guidelines (consultation draft) by Water by Design (2018). Refer to Table 4 for the bioretention basin characteristics. Table 4 – Bioretention Basin Characteristics Bioretention Basin A Bioretention Basin B Extended Detention (m) 0.30 0.30 Filter Depth (m) 0.50 0.50 Surface Area (m2) 35.00 10.00 Filter Area (m2) 35.00 10.00 3.2.4 MUSIC Model Results MUSIC modelling of the proposed catchments was performed to ensure the nominated treatment strategy achieves the required pollutant reduction objectives. The target reductions in stormwater pollutants are based on a comparison of an unmitigated scenario, having no treatment on site, and the mitigated scenario, which has stormwater treatment measures incorporated onto the site. Tables 5 and 6 provide the results of the modelling for catchment and Table 7 provides the modelling results for the development in its entirety. The MUSIC modelling demonstrates that compliance has been met or exceeded for the objectives required by NSC and the SPP (2017) for Total Suspended Solids (TSS), Total Phosphorus (TP), Total Nitrogen (TN) and Gross Pollutants (GP). Table 5 - MUSIC Model Results for Catchment A Unmitigated Mitigated Reduction Target Pollutant Compliance (kg/yr) (kg/yr) Achieved (%) Reduction (%) TSS 949 178 81 80 Y TP 1.91 0.498 73.9 60 Y TN 11.8 5.82 50.7 45 Y GP 114 0 100 90 Y Table 6 - MUSIC Model Results for Catchment B Unmitigated Mitigated Reduction Target Pollutant Compliance (kg/yr) (kg/yr) Achieved (%) Reduction (%) TSS 378 63 83.4 80 Y TP 0.651 0.15 77 60 Y TN 3.1 1.5 52.7 45 Y GP 29.2 0 100 90 Y Table 7 - MUSIC Model Results for Overall Development Area Unmitigated Mitigated Reduction Target Pollutant Compliance (kg/yr) (kg/yr) Achieved (%) Reduction (%) TSS 1360 272 80 80 Y TP 2.64 0.728 72.4 60 Y TN 15.4 7.82 49.3 45 Y GP 143 0 100 90 Y Covey Associates Pty Ltd 4 Project No: 192297 Consulting Engineers 26719Rpt, Issue E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.