2205-28752 SRA - Response with conditions (MCU220065)(OPW220103).pdf
RA6-N
SARA reference: 2205-28752 SRA
Council reference: MCU22/0065 OPW22/0103
Applicant reference: 04642
17 May 2022
Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin Qld 4565
[email protected]
Attention: Diogo Carrico
Dear Mr Carrico
SARA response—32 Cooran Court, Noosa Heads
(Referral agency response given under section 56 of the Planning Act 2016)
The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 13 May 2022.
Response
Outcome: Referral agency response – with conditions.
Date of response: 17 May 2022
Conditions: The conditions in Attachment 1 must be attached to any
development approval.
Advice: Advice to the applicant is in Attachment 2.
Reasons: The reasons for the referral agency response are in Attachment 3.
Development details
Description: Development permit Operational work for prescribed tidal works
(pontoon)
SARA role: Referral Agency.
SARA trigger: Schedule 10, Part 17, Division 3, Table 2 (Planning Regulation 2017)
– Tidal works or work within a coastal management district
SARA reference: 2205-28752 SRA
South East Queensland (North) regional
office
Mike Ahern Building, Level 3, 12 First
Avenue, Maroochydore
Page 1 of 7 PO Box 1129, Maroochydore QLD 4558
[OCR of page images]
RA6-N
Queensland
Government
SARA reference: 2205-28752 SRA
Council reference: MCU22/0065 OPW22/0103
Applicant reference: 04642
17 May 2022
Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin Qid 4565
[email protected]
Attention: Diogo Carrico
Dear Mr Carrico
SARA response—32 Cooran Court, Noosa Heads
(Referral agency response given under section 56 of the Planning Act 2016)
The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 13 May 2022.
Response
Outcome:
Date of response:
Referral agency response — with conditions.
17 May 2022
Conditions: The conditions in Attachment 1 must be attached to any
development approval.
Advice: Advice to the applicant is in Attachment 2.
Reasons: The reasons for the referral agency response are in Attachment 3.
Development details
Description: Development permit Operational work for prescribed tidal works
(pontoon)
SARA role: Referral Agency.
SARA trigger: Schedule 10, Part 17, Division 3, Table 2 (Planning Regulation 2017)
— Tidal works or work within a coastal management district
SARA reference: 2205-28752 SRA
Page 1 of 7
South East Queensland (North) regional
office
Mike Ahern Building, Level 3, 12 First
Avenue, Maroochydore
PO Box 1129, Maroochydore QLD 4558
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
2205-28752 SRA
Assessment Manager: Noosa Shire Council
Street address: 32 Cooran Court, Noosa Heads
Real property description: Lot 222 on N21857
Applicant name: Gayle Carter
C/- The Jetty Specialist
Applicant contact details: 18 Ron Parkinson Cres
Corbould Park QLD 4551
[email protected]
Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules)
Copies of the relevant provisions are in Attachment 4.
A copy of this response has been sent to the applicant for their information.
For further information please contact Richard Wilson, Planning Officer, on 5352 9774 or via email
[email protected] who will be pleased to assist.
Yours sincerely
Paul Gleeson
Principal Planning Officer
cc Gayle Carter, [email protected]
enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations provisions
Attachment 5 - Approved plans and specifications
State Assessment and Referral Agency Page 2 of 7
[OCR of page images]
2205-28752 SRA
Assessment Manager: Noosa Shire Council
Street address: 32 Cooran Court, Noosa Heads
Real property description: Lot 222 on N21857
Applicant name: Gayle Carter
C/- The Jetty Specialist
Applicant contact details: 18 Ron Parkinson Cres
Corbould Park QLD 4551
[email protected]
Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules)
Copies of the relevant provisions are in Attachment 4.
A copy of this response has been sent to the applicant for their information.
For further information please contact Richard Wilson, Planning Officer, on 5352 9774 or via email
[email protected] who will be pleased to assist.
Yours sincerely
Paul Gleeson
Principal Planning Officer
cc Gayle Carter, [email protected]
enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations provisions
Attachment 5 - Approved plans and specifications
State Assessment and Referral Agency Page 2 of 7
Page 3
2205-28752 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Development permit for operational work
Schedule 10, Part 17, Division 3, Table 2 Item 1 – Tidal works or works within a coastal management
district — The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following condition(s):
1. The development must be carried out generally in accordance with At all times.
the following plan:
Site Plan, layout plan & water allocation prepared by The
Jetty Specialist, dated 21 January 2021, drawing number
JSP-SJ-35850, revision A.
2. The structure must be lit/marked in accordance with the following At all times.
specifications, such that it does not cause a risk to the safe
navigation of other ships:
Section 3 of AS4282-1997 Control of the obtrusive effects of
outdoor lighting.
3. The construction, operation or maintenance of the structure, and At all times.
any ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the While works are
work must be removed from the waterway and suitably disposed of occurring.
at the applicant’s expense.
5. All piles and/or structure to be demolished both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works.
State Assessment and Referral Agency Page 3 of 7
[OCR of page images]
Attachment 1—Referral agency conditions
2205-28752 SRA
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. | Conditions Condition timing
Development permit for operational work
Schedule 10, Part 17, Division 3, Table 2 Item 1 — Tidal works or works within a coastal management
district — The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following condition(s):
1. The development must be carried out generally in accordance with At all times.
the following plan:
e Site Plan, layout plan & water allocation prepared by The
Jetty Specialist, dated 21 January 2021, drawing number
JSP-SJ-35850, revision A.
2. The structure must be lit/marked in accordance with the following At all times.
specifications, such that it does not cause a risk to the safe
navigation of other ships:
e¢ Section 3 of AS4282-1997 Control of the obtrusive effects of
outdoor lighting.
3. The construction, operation or maintenance of the structure, and At all times.
any ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the While works are
work must be removed from the waterway and suitably disposed of occurring.
at the applicant's expense.
5. All piles and/or structure to be demolished both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works.
State Assessment and Referral Agency
Page 3 of 7
Page 4
2205-28752 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
the State Development Assessment Provisions (SDAP) v3.0. If a word remains undefined it has
its ordinary meaning.
State Assessment and Referral Agency Page 4 of 7
[OCR of page images]
2205-28752 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2076 its regulation or
the State Development Assessment Provisions (SDAP) v3.0. If a word remains undefined it has
its ordinary meaning.
State Assessment and Referral Agency Page 4 of 7
Page 5
2205-28752 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for SARAs decision are:
The application is for a development permit for operational work to allow for the removal of an
existing pontoon system and installation of a new pontoon system.
The development site is located in a canal.
The proposed development is for the construction of a private single vessel pontoon.
The proposed structure, including any vessel berthed, moored or attached to the structure:
o will not encroach into, pass over or under a navigation corridor; and
o is not located in a high-risk maritime development zone.
The proposed structure meets the FastTrack5 qualifying criteria checklist 4
Material used in the assessment of the application:
The development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
The State Development Assessment Provisions (version 3.0)
The Development Assessment Rules
SARA DA Mapping system
State Assessment and Referral Agency Page 5 of 7
[OCR of page images]
2205-28752 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for SARAs decision are:
e The application is for a development permit for operational work to allow for the removal of an
existing pontoon system and installation of a new pontoon system.
e The development site is located in a canal.
e The proposed development is for the construction of a private single vessel pontoon.
e The proposed structure, including any vessel berthed, moored or attached to the structure:
© will not encroach into, pass over or under a navigation corridor; and
ois not located in a high-risk maritime development zone.
The proposed structure meets the FastTrack5 qualifying criteria checklist 4
Material used in the assessment of the application:
e The development application material and submitted plans
e Planning Act 2016
e Planning Regulation 2017
e The State Development Assessment Provisions (version 3.0)
e The Development Assessment Rules
e SARA DA Mapping system
State Assessment and Referral Agency Page 5 of 7
Page 6
2205-28752 SRA Attachment 4—Change representation provisions (page left intentionally blank) State Assessment and Referral Agency Page 6 of 7 [OCR of page images] 2205-28752 SRA Attachment 4—Change representation provisions (page left intentionally blank) State Assessment and Referral Agency Page 6 of 7
Page 7
2205-28752 SRA Attachment 5—Approved plans and specifications (page left intentionally blank) State Assessment and Referral Agency Page 7 of 7 [OCR of page images] 2205-28752 SRA Attachment 5—Approved plans and specifications (page left intentionally blank) State Assessment and Referral Agency Page 7 of 7