                                                                                                    2205-28752 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Development permit for operational work
 Schedule 10, Part 17, Division 3, Table 2 Item 1 – Tidal works or works within a coastal management
 district — The chief executive administering the Planning Act 2016 nominates the Director-General of
 the Department of Transport and Main Roads to be the enforcement authority for the development to
 which this development approval relates for the administration and enforcement of any matter relating
 to the following condition(s):
 1.      The development must be carried out generally in accordance with               At all times.
         the following plan:
                 Site Plan, layout plan & water allocation prepared by The
                  Jetty Specialist, dated 21 January 2021, drawing number
                  JSP-SJ-35850, revision A.
 2.      The structure must be lit/marked in accordance with the following              At all times.
         specifications, such that it does not cause a risk to the safe
         navigation of other ships:
                 Section 3 of AS4282-1997 Control of the obtrusive effects of
                  outdoor lighting.
 3.      The construction, operation or maintenance of the structure, and               At all times.
         any ship berthed, moored or attached to the structure, must not:
            (a) encroach into, pass over or under a navigation corridor or
            (b) be located in a high risk maritime zone.
 4.      Any debris or similar obstruction generated whilst undertaking the             While works are
         work must be removed from the waterway and suitably disposed of                occurring.
         at the applicant’s expense.
 5.      All piles and/or structure to be demolished both above and below               Prior to the completion
         the waterline must be completely extracted/removed.                            of the works.




 State Assessment and Referral Agency                                                                   Page 3 of 7


[OCR of page images]
Attachment 1—Referral agency conditions

2205-28752 SRA

 

(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at

 

 

 

 

 

 

 

 

 

 

Attachment 5)
No. | Conditions Condition timing
Development permit for operational work
Schedule 10, Part 17, Division 3, Table 2 Item 1 — Tidal works or works within a coastal management
district — The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following condition(s):
1. The development must be carried out generally in accordance with At all times.
the following plan:
e Site Plan, layout plan & water allocation prepared by The
Jetty Specialist, dated 21 January 2021, drawing number
JSP-SJ-35850, revision A.
2. The structure must be lit/marked in accordance with the following At all times.
specifications, such that it does not cause a risk to the safe
navigation of other ships:
e¢ Section 3 of AS4282-1997 Control of the obtrusive effects of
outdoor lighting.
3. The construction, operation or maintenance of the structure, and At all times.
any ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the While works are
work must be removed from the waterway and suitably disposed of occurring.
at the applicant's expense.
5. All piles and/or structure to be demolished both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works.

 

 

 

 

 

State Assessment and Referral Agency

Page 3 of 7

Log in to download the original (2205-28752 SRA - Response with conditions (MCU220065)(OPW220103).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.