Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2205-28752 SRA - Response with conditions (MCU220065)(OPW220103).pdf

of 7

Page text read automatically using OCR, there may be inaccuracies

                                                                                           2205-28752 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for SARAs decision are:
 The application is for a development permit for operational work to allow for the removal of an
   existing pontoon system and installation of a new pontoon system.
 The development site is located in a canal.
 The proposed development is for the construction of a private single vessel pontoon.
 The proposed structure, including any vessel berthed, moored or attached to the structure:
            o will not encroach into, pass over or under a navigation corridor; and
            o is not located in a high-risk maritime development zone.
 The proposed structure meets the FastTrack5 qualifying criteria checklist 4

Material used in the assessment of the application:

      The development application material and submitted plans
      Planning Act 2016
      Planning Regulation 2017
      The State Development Assessment Provisions (version 3.0)
      The Development Assessment Rules
      SARA DA Mapping system




    State Assessment and Referral Agency                                                      Page 5 of 7


[OCR of page images]
2205-28752 SRA

Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

 

The reasons for SARAs decision are:
e The application is for a development permit for operational work to allow for the removal of an
existing pontoon system and installation of a new pontoon system.
e The development site is located in a canal.
e The proposed development is for the construction of a private single vessel pontoon.
e The proposed structure, including any vessel berthed, moored or attached to the structure:
© will not encroach into, pass over or under a navigation corridor; and
ois not located in a high-risk maritime development zone.
The proposed structure meets the FastTrack5 qualifying criteria checklist 4

Material used in the assessment of the application:

e The development application material and submitted plans

e Planning Act 2016

e Planning Regulation 2017

e The State Development Assessment Provisions (version 3.0)
e The Development Assessment Rules

e SARA DA Mapping system

State Assessment and Referral Agency Page 5 of 7

Log in to download the original (2205-28752 SRA - Response with conditions (MCU220065)(OPW220103).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.