Council archive · source document
MCU14-0006 Decision Notice · MCU14/0006
Officer: Glen Conforti Direct Telephone: 07 5329 6241 Fax: 07 5329 6501 Our Reference: GCONFORTI:MCU14/0006 Your Reference: N/A 9 May 2014 Ms AD De Aragao-Lehmann & Mr S Lehmann 78A Seaview Rd WEST BEACH SA 5024 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 7 May 2014, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: MCU14/0006 Street Address: 4 Crank St SUNSHINE BEACH QLD 4567 Real Property Description: Lot 430 RP 48112 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Material Change of Use of Premises - Multiple housing Type 2 (Duplex) 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 4 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Building Height The maximum height of the development must not exceed 12 metres above the finished ground level and the natural ground surface. The finished ground level must not be generally less than the existing natural ground surface to ensure the basement meets the definition of a basement pursuant to The Noosa Plan except for the area between the vehicle access ramp and the stairs to level 1/Ground Floor where it may remain at the level indicated on the approved plan. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Roof Top Terrace The roof top terrace must remain unroofed and unenclosed. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with condition. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level or otherwise fully enclosed or screen such that they are not visible from the street frontages or adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvers, glass panelling or the like, expect where required to satisfy any privacy condition of this Decision Notice. Fencing and Walls Any street fencing must be set back an average of 1 metre from the front property boundary. Any fencing on the front boundary must either: not exceed a maximum height of 1.2m be of open construction The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. Waste Management Refuse storage, removal and collection facilities must be provided in accordance with the following: provision of two 240L wheelie bins for each dwelling unit provision of separate bins for general and recyclable waste for each dwelling unit, with an equal number of each being provided collection by service vehicles from the kerbside provision of a hardstand impervious area within the private open space area of each unit for the permanent storage location of the bins, having minimum dimensions of 0.36 m2 (600mm x 600mm) per bin. Acoustic Amenity Any fixed plant and equipment that causes either tonal (Leq) sound (e.g. from basement car-park exhaust, air conditioning unit or pool filtration unit), or impulse (Lmax) sound, must be enclosed, shielded and/or positioned to ensure that sound pressure does not exceed the following levels for habitable rooms within dwellings: 40 dB(A) Leq for living and work areas OR 45 (if near noisy/major roads) 35 dB(A) Leq for sleeping areas OR 40 (if near noisy/major roads) 45 dB(A) Lmax for all areas OR 55 (if near noisy/major roads) Note: Measurement of sound pressure levels (adjusted for tonality and impulse) must be in accordance with Australian Standard AS1055.1 “Acoustics – Description and measurement of environmental noise – General procedures”. *(Refer to Advisory Note) Certification must be submitted to Council from a qualified person* which certifies that operational noise from any fixed plant and equipment complies with the requirements of this Decision Notice. *(Refer to Advisory Note) LANDSCAPING & ECOLOGY The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and Planning Scheme Policy PSP 3 – Landscaping Plants and Guidelines and must include in particular: A 0.5m wide (minimum width) garden bed along the southern boundary extending from the bin area to the stairwell entry and must include a variety of plantings with trees at a minimum spacing of 4m centres a minimum 1m wide densely landscaped garden bed along the southern boundary extending from the stairwell entry to the rear boundary and for the full length of the rear boundary. The garden must include plantings with a mature height of not less than 8m and a spacing of 4m centres provision of 1 street tree within the road reserve for every 10 metres of road frontage All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. Existing trees in the road reserve must be assessed by a qualified person* and retained and protected where possible. Where mature trees are proposed to be removed, reasonable grounds must be given by the qualified person*. Any proposed tree removal in the road reserve must be indicated on the landscape plan and submitted as part of the operational works application. *(Refer to Advisory Note) Trees to be retained must be protected from clearing or construction activities by: clearly marking vegetation to be retained with flagging tape installing protective fencing around the drip line of the vegetation restricting stockpiling, storage and vehicle parking to those areas which are already cleared using low impact construction techniques around vegetation. ENGINEERING External Works Crank Street must be upgraded for the length of its frontage to the subject site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: construction of a 1.5m wide concrete footpath across the full frontage of the site. The path must be: designed and constructed in accordance with Council’s standard drawings, and located adjacent to the existing kerb and channel. removal of the existing property access and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed Site Access and Driveway A sealed access driveway must be provided from Crank Street to all parking and maneuvering areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a driveway crossover in accordance with IPWEAQ standard drawing SEQ R-050 a driveway width of 4 metres maximum in the road reserve excavation within the road reserve must be kept to a minimum. The surface profile within the road reserve adjacent to the access driveway must be reshaped such that the need for retaining structures is minimized. Car Parking A minimum of 3 car parking spaces must be provided and marked on the site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: 1 visitor parking space within the total, which is clearly marked for that purpose and accessible at all times for visitor use crossfalls and gradients in accordance with Australian Standard AS/NZS2890.1:2004. All car parking areas and access driveways must be maintained exclusively for vehicle parking and maneuvering and kept in a tidy and safe condition at all times. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and include: A drainage system generally in accordance with drawing No.24056-C4 prepared by SCG Consulting Engineers the use of gravity stormwater drainage and not surcharge pits. Electricity and Telecommunication Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Earthworks and Retaining Walls All fill/cut and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Earthworks required on site must be carried out in accordance with Council’s Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Earthworks carried out on site must not affect the structural integrity of any of the existing fences and/or buildings and/or structures and/or lands that border the development site. Fences that are affected must be replaced prior to the Building Certifier issuing the Certificate of Classification. A Geotechnical Engineer or similar qualified expert must assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures and/or lands, and make recommendations on the type of foundation system(s) best suited for the proposed development. The recommendations of this report must be incorporated into the design and construction of the proposed development. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. UNITYWATER Construction activities must not impede the access of Unitywater or Fire Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers). Separate 25mm PE water services must be installed to a common lot boundary with independent meters installed outside the boundary of the lot in accordance with Unitywater and SEQ Standard Drawings. Water meters must be located on alternative boundaries to electrical pillars. The existing 100mm diameter AC watermain within Crank Street must be lowered and replaced with DICL pipes for the full width of the driveway and a distance sufficiently long each side of the driveway to allow the new main to be connected to the existing watermain without the use of vertical bends. The replacement works must be completed prior to excavation commencing on the site or the placement of construction materials/site offices over or adjacent to the water main alignment. Buildings, basements and other structures (including retaining walls) must maintain a minimum clearance of 1.5 metres from Unitywater sewer mains, and 1.0 metre from a sewer manhole chamber or sewer inspection opening. The level of the existing sewer manhole and sewerage inspection opening must be adjusted as necessary to suit the proposed finished surface levels. Work must be undertaken by Unitywater at the applicant’s cost. The basement floor level must be constructed at a height to enable sewer servicing by way of a gravity connection to the existing house connection point in accordance with Plumbing Code requirements. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within these clearances must be low growing when mature, and suitable approved varieties. Construction works undertaken in the vicinity of Unitywater water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. 5. REFERRAL AGENCIES Not Applicable. 6. APPROVED PLANS The following plans are Approved Plans for the development: Approved Plans Plan No. Rev. Plan Name Date 1/14 Roof Plan and Building Layout, prepared by Steffen Lehmann 25 Jan. 2014 2/14 Roof Plan Roof Terrace, prepared by Steffen Lehmann 25 Jan. 2014 3/14 Plan Level 3, prepared by Steffen Lehmann 25 Jan. 2014 4/14 Plan Level 2, prepared by Steffen Lehmann 25 Jan. 2014 5/14 REV Plan Level 1/Ground Floor, prepared by Steffen Lehmann 25 Jan. 2014 6/14 Plan Basement, prepared by Steffen Lehmann 25 Jan. 2014 9/14 Section A-A:Long Section, prepared by Steffen Lehmann 25 Jan. 2014 10/14 Section B-B: Short Section, prepared by Steffen Lehmann 25 Jan. 2014 11/14 Street Elevation (East), prepared by Steffen Lehmann 25 Jan. 2014 12/14 North Elevation, prepared by Steffen Lehmann 25 Jan. 2014 13/14 West Elevation (Garden), prepared by Steffen Lehmann 25 Jan. 2014 14/14 South Elevation, prepared by Steffen Lehmann 25 Jan. 2014 7. REFERENCED DOCUMENTS The following documents are referenced in the assessment manager conditions: Referenced Documents Document No. Rev. Document Name Date 24056 Stormwater Drainage, prepared by SCG Consulting Engineers March 2014 8. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: ENVIRONMENT Qualified Person For the purpose of certifying acoustic treatments for the development, a qualified person is considered to be either: Registered Professional Engineer of Queensland; an environmental consultant with a minimum of 3 years current experience in the field of acoustics. Noise The applicant is advised to ensure that during the detailed building design and construction phase, including the design, selection and installation of fixed plant and equipment, A/C units and refrigeration plant, mechanical exhausts, acoustic enclosures/plant rooms and the like, that the ongoing advice and design input of a qualified acoustic consultant is sought and implemented to ensure that the operation of such plant and equipment complies with statutory and planning noise limits. Mechanical plant and equipment must be provided with appropriate acoustic enclosures/screening and located away from adjacent noise sensitive premises. UNITYWATER Connection to Unitywater live water mains and the Unitywater live sewer system must be undertaken by Unitywater at the applicant’s cost. LANDSCAPE & ECOLOGY For the purpose of preparing an Arborist Report, a qualified person is considered to be a person with either: ISA certification; or a Diploma of Arboriculture in addition to a minimum of 3 years current experience in the field of arboriculture. ENGINEERING Building and Construction Industry (Portable Long Service Leave) Levy (“QLeave”) The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. INFRASTRUCTURE CHARGES This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009. GENERAL Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards 9. PROPERTY NOTES Not Applicable. 10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 11. FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Operational Work (Landscaping, Stormwater, Access and Carparking) Development Permit for Building Work (All Building Works) 12. SELF ASSESSABLE CODES Not Applicable. 13. SUBMISSIONS Not Applicable. 14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 15. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 16. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices Yours faithfully Glen Conforti development planner Enc: Adopted Infrastructure Charge Notice Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 10 of 12 [word/footer2.xml] Page 1 of 12 [word/header1.xml] MCU14/0006 [Attachment: image3.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14-0006 Decision Notice.docxRelated documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
- DOCX
No other editions are linked here.