Brook

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

      
 

Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

 
 

 

\Nature of the works

 

1. Nature of work that requires assessment against a planning scheme:

 

(7 Building work - Complete Table A {X] Operational work - Complete Table B

 

Table B
(i) What is the nature of the operational work?
e} (J) Roadworks 1 Stormwater (J Water infrastructure (-] Sewerage infrastructure
(J Landscaping (] Earthworks ([] Drainage Works LJ Signage
(JJ Clearing vegetation under the planning scheme Other - Specify below

 

Construction new timber jetty & pneumatic boat storage device

 

 

 

(ii) What type of approval is being sought? (VOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit (D Preliminary approval L] Both (Specify below)

(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivisionf?
IX] No [J Yes - Specify the number of lots being created

{iv) Are there any current approvals associated with this application? (e.g. Development Pemnit or Preliminary Approval for MCU or recenfiguring
alot)

[IX] No = [[] Yes - Complete Table B(a)

 

 

 

 

e} 2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 25000

 

 

 

 

 

 

(Mandatory Information . _ _—— . ern ai ]
3. Confirm that the following mandatory information accompanies this application
Confirmation of ;
I - fodgement Method of lodgement

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fil)

 

 

 

XK) Confirmed over the counter

 

 

 

OFFICE USE ONLY

 

 

Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
je Part A must also be completed for all IDAS development applications.
je The applicant is responsible for answering all questions fully and correctly, unless foflowing a response there is a statement to go directly lo another question.

 

 

Q1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur

 

 

 

Used in these records

About this file

File size
831 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0464 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 831 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.