08/0464 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.464
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
IPA schedule 8, pat 1 table 5, tem 7 IP Reguiation, schedule 2, table 2. tam 11. IP Regulation, schedule 1, table 2, tem 2 {wild rer area), Water Act 2098
section 966C, Wild Rivers Act 2005, section 43A
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[XJ No-Gowars (_] Yes
IPA, schedule » pat 1, table ¢ nem 1 IPA, schedule 4 pant 7, table 5. deity ane 4, I Regulation, scteduls 2 tabks 2 deass Tat 2. Envdonmental Praterten Act 1884, secon
JAA (ont ves aren) Wild Rivers ALL 200%, sechen 433A, relevant Wakd iver ueclatatcn, Wad Rivers Code:
iWITHIN THE LIMITS OF A PORT
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[XJ No - Gotoans
LI Yes
IP Regulation. schedule 2, table 2, items 15 and 16
‘DECLARED FISH HABITAT AREA }
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[RX] No - Goto 01.6
(11 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, tem 26
{COMMUNITY INFRASTRUCTURE : / / . |
1.6 Is any part of the premises designated for community infrastructure?
[K] No - Goto. 97.7
LI Yes
IP Regulation, schedule 2, table 3, item 7
{WASTE WATER MANAGEMENT : mo vo |
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
No - End of Section? [_] Yes
IP Regulation, schedule 2, table 3, item 5
— Pee
St ul 10: 1 g Section 4 must be completed when the application seeks approval to carry out operational work.
(PLANNING SCHEME |
4.4 {s any of the proposed operational work assessable under a planning scheme?
oO No - Go to Q4.2 DX] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below,
STATE-CONTROLLED ROAD ee |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[X] No
CL Yes
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
IX] No -Gotoaa12
oO Yes - This application must be referred ta the Department of Main Roads (DMR) as Concurrence Agency.
IP Requiation, schedule 2, table 3, item 3, iP Regulation, schedule 2 table 3, item Tb)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0464 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 831 KB (small file)
- File type
No other editions are linked here.