Original source · versioned page text
Attach K- Code Compliance Tables
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
town planning
code compliance tables
pedestrian and bicycle linkages is established, Noosa Trail Network, as indicated in Schedule 5 –
enhanced and protected incorporating road Map 3;
reserves, State forests, Council owned land and AND
private lands consistent with the lifestyle and S21.2 Development does not have an adverse
outdoor recreation needs of Noosa’s residents and impact on the access functions of the Noosa Trail
visitors; Network, as indicated in Schedule 5 – Map 3,
including severing of existing or future linkages;
AND OR
O22 The Noosa Trail Network in the locality is S21.3 Alternative linkages to those indicated in
supported by overnight camping facilities, home- Schedule 5 – Map 3 are provided;
hosted accommodation and signage, allowing AND
local residents and visitors to experience the S21.4 Linkages to the Noosa Trail Network are
natural values of the area and to access key designed and constructed in accordance with—
destinations including— a) Australian Standard 2156.1 Walking Tracks Part
a) the town of Cooroy; 1: Classification and Signage to a minimum of a
b) Lake Macdonald; Class 4 Standard; and
c) the Botanic Gardens; and b) Australian Standard 2156.2 Walking Tracks Part
d) State forests, conservation parks and other 2: Infrastructure Design;
recreation facilities in the locality.
S22.1 No solution provided
Pedestrian and bicycle pathways S23.1 Pedestrian and bicycle pathways are Complies- The site is not identified within the
O23 Safe and convenient pedestrian and bicycle provided and retained where indicated in the Priority Infrastructure Plan for pathways and
pathways are provided and retained between and Priority Infrastructure Plan in Part 15; therefore is not part of the trunk pedestrian
around key destinations, including— AND network. Currently the site is not part of a
a) between Cooroy and Tewantin; S23.2 Contributions toward pedestrian and pedestrian connection from Garnet St to Emerald
b) between Cooroy and the Noosa Botanical bicycle pathways are provided in accordance with St. It is not identified as part of a mid – block link
Gardens; and the Priority Infrastructure Plan in Part 15. within any Planning scheme documentation.
c) within and around the town of Cooroy. Garnet St (between Maple St and Wattle Street St)
is 190m in length. The provision of a convenient
pedestrian network within Cooroy is not
compromised without pedestrian connection
saunders havill group page 18 Job 7588
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.