Original source · versioned page text
Tree Inspection Form Earth Creation Landscapes 36 Enterprise St. Sunshine Beach (May21)
TREE INSPECTION FORM - (AS 2303: 2018)
Date / Location of inspection May 21, 2026 – Manawee Garden Centre, Buderim
Client/Job: Earth Creation Landscapes – 36 Enterprise St.
Sunshine Beach
Species & Pot sizes inspected (100L) Brachychiton ‘Jerilderie Red’ x 6
Inspected by
B Martin (Tree Solutions Australia P/L)
Dip.Arb/Hort, MQAA, MISA, MAA
YES NO COMMENTS
General health and vigour ✓
Tree is true to type and pot size ✓
Pests and disease free ✓
Free from injury ✓
Self-supporting ✓
Stem structure ✓
Village green Stem taper ✓
Apical dominance for excurrent form ✓
Crown symmetry ✓
Pruning to AS 4373 ✓
Included bark / bifurcation? ✓
Root ball inspection conducted? ✓
If assessed in situ; have Nursery stakes and NA
ties been removed?
If assessed in situ, tree planted as per FIGURE NA
4.8.3 rev A and decision notice conditions?
If assessed in situ; is planting location as per NA
approved plan?
If assessed in situ; is mulch type and thickness NA
as per decision notice conditions?
NATSPEC COMPLIANT ✓
REINSPECTION REQUIRED ✓ Stock must be planted within 30
days or re-insp. is required
NB: Some trees may require
PASSED ✓ minor root pruning at time of
installation.
Check for this prior to planting.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original