Delegated Report - Code - Planning OPW26 0100 (As Published)

of 11

Page text shows just the words. Original shows the document exactly as it was published.

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 24 July 2028, unless an application to extend the currency period is
                      approved by Council.
               SITE SPECIFIC CONDITIONS
               3.     All site surfaces must be effectively stabilised using methods which have achieved effective
                      short-term stabilisation and will continue achieve effective stabilisation in the medium- to
                      long-term. Stabilisation must be established, inspected and accepted by a Council delegate
                      no later than 31 May 2029 unless otherwise agreed to in writing by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               4.     All necessary approvals from external service providers and external parties on which the
                      development works are proposed have been obtained and a copy supplied to Council.
               5.     A condition report including photographs of the frontage of the site and the mapped waterway
                      to the west of the works site must be completed and submitted to Council prior to the prestart
                      meeting.
               6.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Erosion and sediment control works; and
                      c.      Other relevant parties.
               7.     Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               8.     Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               9.     The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               10.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               11.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.


                                                                                                      Page 6 of 11

Document Set ID: 25007092
Version: 4, Version Date: 24/07/2026
Log in to download the original file

Delegated Report - Code - Planning OPW26 0100 (As Published).pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.