Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

SARA RFI - Traffic Engineering Report

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

•     LGIP mapping identifies the proposed development and the surrounding area within the Priority
     Infrastructure Area and Service Catchment.

•    LGIP Transport identifies a future bus stop (BSF04) between Coral Tree Ave / Noosa Drive roundabout
     and Grant Street / Noosa Drive / Sunshine Beach Road roundabout to be located south of the proposed
     development.

•    LGIP Pathways identifies future pathway (PW25) to be provided east of the development.




Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex                                       14
Reference: 22BRT022 RP01_1
Log in to download the original file

SARA RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.