Original source · versioned page text
SARA RFI - Traffic Engineering Report
Very large file: it may take a few minutes
The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
• LGIP mapping identifies the proposed development and the surrounding area within the Priority
Infrastructure Area and Service Catchment.
• LGIP Transport identifies a future bus stop (BSF04) between Coral Tree Ave / Noosa Drive roundabout
and Grant Street / Noosa Drive / Sunshine Beach Road roundabout to be located south of the proposed
development.
• LGIP Pathways identifies future pathway (PW25) to be provided east of the development.
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 14
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.