7 Development Transport Demand
7.1 Existing Traffic Demand
TTM Data conducted traffic counts on Friday, 8th July 2022 and Saturday, 9th July 2022 to establish the
existing traffic volumes during the weekday and weekend peak-hour periods at the following intersections:
• Noosa Drive / Grant Street;
• Noosa Drive / Coral Tree Avenue; and
• Grant Street / Banksia Avenue.
The following peak periods were as follows:
• Noosa Drive / Grant Street / Sunshine Beach Road:
- Friday, 8th July 2022
AM Peak period: 8:30am to 9:30am
PM Peak Period: 3:15pm to 4:15pm
- Saturday, 9th July 2022
PM Peak Period: 1:00pm to 2:00pm
• Noosa Drive / Coral Tree Avenue:
- Friday, 8th July 2022
AM Peak period: 9:00am to 10:00am
PM Peak Period: 3:15pm to 4:15pm
- Saturday, 9th July 2022
PM Peak Period: 1:00pm to 2:00pm
• Grant Street / Banksia Avenue:
- Friday, 8th July 2022
AM Peak period: 8:30am to 9:30am
PM Peak Period: 3:00pm to 4:00pm
- Saturday, 9th July 2022
AM Peak period: 10:15am to 11:15am
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 22
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.