7             Development Transport Demand
7.1           Existing Traffic Demand
TTM Data conducted traffic counts on Friday, 8th July 2022 and Saturday, 9th July 2022 to establish the
existing traffic volumes during the weekday and weekend peak-hour periods at the following intersections:

•    Noosa Drive / Grant Street;

•    Noosa Drive / Coral Tree Avenue; and

•    Grant Street / Banksia Avenue.

The following peak periods were as follows:

•    Noosa Drive / Grant Street / Sunshine Beach Road:

     -    Friday, 8th July 2022

              AM Peak period:                       8:30am to 9:30am

              PM Peak Period:                       3:15pm to 4:15pm

     -    Saturday, 9th July 2022

              PM Peak Period:                       1:00pm to 2:00pm

•    Noosa Drive / Coral Tree Avenue:

     -    Friday, 8th July 2022

              AM Peak period:                       9:00am to 10:00am

              PM Peak Period:                       3:15pm to 4:15pm

     -    Saturday, 9th July 2022

              PM Peak Period:                       1:00pm to 2:00pm

•    Grant Street / Banksia Avenue:

     -    Friday, 8th July 2022

              AM Peak period:                       8:30am to 9:30am

              PM Peak Period:                       3:00pm to 4:00pm

     -    Saturday, 9th July 2022

              AM Peak period:                       10:15am to 11:15am




Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex                                        22
Reference: 22BRT022 RP01_1
Log in to download the original file

SARA RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.