Original source · versioned page text
SARA RFI - Traffic Engineering Report
Very large file: it may take a few minutes
The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Figure 9-2: Grant Street / Noosa Drive / Sunshine Beach Road SIDRA Layout
9.2.1 Analysis Results
The results of the SIDRA analysis for the 2022 Existing, 2024 and 2034 Base and Base + Development
scenarios (both weekdays and weekends) are summarised in
Table 9-2. Detailed SIDRA output data is also included in Appendix E.
Table 9-2: Summary of Sidra Outputs (Grant Street / Noosa Drive / Sunshine Beach Road Roundabout)
Scenario DOS Average Delay LOS 95th Percentile Critical Queue (m)
Overall Worst Overall Worst Sunshine Beach Noosa Dr Grant St Noosa Dr
Movement Movement Rd (S) (E) (N) (W)
Weekday - AM Peak Hour
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 31
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.