2034 Base + 7.2% 5.5 sec 9.1 sec A A 0.1m 3.0m 2.6m 1.6m
Development (UT Banksia Ave
N)
Weekday - PM Peak Hour
2024 Base + 9.9% 5.3 sec 9.4 sec A A 0.1m 4.4m 1.8m 2.6m
Development (UT Banksia Ave
N)
2034 Base + 10.4% 5.5 sec 9.4 sec A A 0.1m 4.7m 2.0m 2.7m
Development (UT Banksia Ave
N)
Weekend – PM Peak
2024 Base + 10.2% 5.3 sec 9.5 sec A A 0.1m 4.6m 2.3m 3.1m
Development (UT Banksia Ave
N)
2034 Base + 10.7% 5.4 sec 9.6 sec A A 0.1m 4.8m 2.6m 3.2m
Development (UT Banksia Ave
N)
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement
N – North, S – South, E – East, W – West
9.3.2 Analysis Conclusions
The analysis indicates that the roundabout is expected to operate at suitable levels at the 2034 design year,
with development traffic included, with a worst-case DOS 10.7% (less than 85.0%, operational capacity of
roundabout) and overall LOS A. The addition of the development traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and queuing.
Based on this assessment, the proposed development is considered to have no adverse impact on the
operations of this roundabout.
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 34
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.