Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

SARA RFI - Traffic Engineering Report

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

TRAFFIC NETWORK DIAGRAM 2
Base 2024 Serenity
ALL VEHICLES g
Legend: s
Weekday AM Peak* 2
Weekday PM Peak* 3
Weekend PM Peak*
[Growth Rate 1.2% DEVELOPMENT SITE
Traffic Survey 2022 0 oO 54
Current Year 2024 oO 1a 44
|Growth Factor 1.024 0 2 59
o Job
t PF ple
1 oO Oy
Q 1 Oo |r
0 1 0
K<>)
a
8
0 8 14 26 at o 18
144616 «69 -t/0 72 ww 283 —]o 23 26
523 412 415 — oO 22 16 190 4 oO 42 26
102 1 Ff J 5990 afd J 4
tC 69 105 83 Noosa Drive TOT PP ye i223
—_ i915 11 182 9 309 49 Jt 7 10
— 368 569 466 243 «19 «328 S4]<— 213 315
240 18 333 54 4*— 220 440

peoy yoeag aulysuns

 

 
Log in to download the original file

SARA RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.