SARA RFI - Traffic Engineering Report

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (19.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

MOVEMENT SUMMARY
   Site: 101 [9_Grant St_Noosa Dr_Sunshine Rd - Base+dev
2024 PM Peak (Weekday) (Site Folder: Site 2)]
New Site
Site Category: (None)
Roundabout


 Vehicle Movement Performance
 Mov Turn        INPUT          DEMAND               Deg.     Aver. Level of     95% BACK OF         Prop. Effective Aver. Aver.
 ID            VOLUMES           FLOWS               Satn     Delay Service          QUEUE            Que      Stop   No. Speed
            [ Total  HV ]    [ Total HV ]                                        [ Veh.  Dist ]                Rate Cycles
             veh/h     %     veh/h    %                v/c      sec                veh    m                                km/h
 South: Sunshine Beach Road (S)
 1      L2     243         0.8   256       0.8      0.357        7.8   LOS A       2.6     18.5       0.78      0.77     0.78    49.7
 2      T1      40         0.0    42       0.0      0.357        7.7   LOS A       2.6     18.5       0.78      0.77     0.78    54.1
 3      R2     328         3.1   345       3.1      0.385      12.1 LOS B          3.1     22.3       0.79      0.78     0.79    50.7
 3u     U       54         1.9    57       1.9      0.385      14.2 LOS B          3.1     22.3       0.79      0.78     0.79    51.7
 Approach      665         2.0   700       2.0      0.385      10.4 LOS B          3.1     22.3       0.78      0.78     0.78    50.7

 East: Noosa Drive (E)
 4      L2     440         2.3   463       2.3      0.433        7.1   LOS A       3.7     26.1       0.80      0.74     0.80    53.0
 5      T1     315         1.6   332       1.6      0.459        8.2   LOS A       3.7     26.3       0.82      0.79     0.83    49.9
 6      R2      37         0.0    39       0.0      0.459      13.3 LOS B          3.7     26.3       0.82      0.79     0.83    52.8
 6u     U       23         0.0    24       0.0      0.459      15.5 LOS B          3.7     26.3       0.82      0.79     0.83    53.9
 Approach      815         1.9   858       1.9      0.459        8.1   LOS A       3.7     26.3       0.81      0.77     0.81    52.1

 North: Grant Street (N)
 7      L2      33         0.0    35       0.0      0.270      14.0 LOS B          2.0     14.1       0.94      0.92     0.94    47.4
 8      T1      50         0.0    53       0.0      0.270      14.3 LOS B          2.0     14.1       0.94      0.92     0.94    48.5
 9      R2      44         4.5    46       4.5      0.270      19.7 LOS B          2.0     14.1       0.94      0.92     0.94    44.4
 9u     U       1          0.0     1       0.0      0.270      21.5 LOS C          2.0     14.1       0.94      0.92     0.94    49.5
 Approach      128         1.6   135       1.6      0.270      16.1 LOS B          2.0     14.1       0.94      0.92     0.94    47.0

 West: Noosa Drive (W)
 10     L2      66         0.0    69       0.0      0.357        7.4   LOS A       2.6     18.5       0.76      0.74     0.76    49.6
 11     T1     232         2.6   244       2.6      0.357        7.4   LOS A       2.6     18.5       0.76      0.74     0.76    51.4
 12     R2     238         0.0   251       0.0      0.314       11.6 LOS B         2.4     16.8       0.73      0.75     0.73    47.7
 12u    U       90         1.1    95       1.1      0.314      13.8 LOS B          2.4     16.8       0.73      0.75     0.73    42.9
 Approach      626         1.1   659       1.1      0.357        9.9   LOS A       2.6     18.5       0.74      0.75     0.74    48.8

 All          2234         1.7   2352      1.7      0.459        9.7   LOS A       3.7     26.3       0.79      0.77     0.79    50.5
 Vehicles


Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Geometric Delay is included).
Queue Model: SIDRA Standard.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.



SIDRA INTERSECTION 9.0 | Copyright © 2000-2020 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise | Processed: 21 June, 2023 1:44:31 PM
Project: L:\Synergy\Projects\2022\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122-
Serenity Close-Rev C.sip9
Log in to download the original file

SARA RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.