SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 8 OCTOBER 2019
Current Status of the Tender
At the conclusion of the Probity Advisory Services, the Tender had proceeded to the stage of a
recommendation of a contract award to Council being prepared, detailing the evaluation team’s
recommended outcomes. We understand this recommendation is due to be presented to the General
Committee planned for 16 September 2019.
Overall Probity Assessment
Our overall assessment of the Tender processes identified the following:
e The Tender was undertaken in a manner that complies with Council’s procurement policy and the
established Probity Plan.
e Alltenderers were given equal opportunity and were treated fairly and consistently.
e The Tender evaluation process was undertaken in a manner free of bias and the ranking is a true
representation of the tenderers’ offers.
Scope of the Engagement
We provided Probity Advisory Services over the Tender and checked Council’s approach to market is in
accordance with the Local Government Framework. A summary of the activities / procedures performed are
included in Appendix 1.
Summary of Observations
Two (2) observations, summarised below, were identified during the performance of the Probity Advisory
Services:
e Observation 1 — Late identification of potential conflict: The Probity Adviser was advised after
tender responses closed on 14 August that the consulting engineer had been included in a tender
response. The Probity Adviser provided recommendations to Council on how to manage perceived
conflicts of interest during the Tender consideration process in relation to the consulting engineer. The
outcome was to send out a confirming probity form to the engineer.
e Observation 2 - Consideration of confirming tenders: At the commencement of the Tender
evaluation meeting, confirmation was obtained that the panel were not conflicted in being able to assess
the conforming tenders as submitted.
A detailed listing of all procedures performed is included in Appendix 1 to this letter. These procedures were
undertaken, and no further observations were identified.
Basis and Use of this Letter
This letter has been prepared in accordance with the objectives, scope and approach set out in the Proposal
Letter dated, 17 April 2019 and subject to the limitations set out in Appendix 2 (Basis and Use of the Report).
Yours sincerely
Crowe
John Zabala (FCA)
Senior Partner
Page | 2
Page 50 of 69See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.