Council archive · source document
SUPERSEDED - Decision Notice - MCU23 0038 [As Published] · MCU23/0038
Officer: Tara Norley
Direct Telephone: 07 5329 6486
Our Reference: MCU23/0038
Your Reference: n/a
15 September 2023
Provectus Algae
14-16 Action St
NOOSAVILLE
QLD 4566
[email protected]
Dear Sir/Madam,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 15 September 2023, Council decided to approve the
application, subject to conditions.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU23/0038
Street address: 14-16 Action Street, Noosaville
Real property description: Lot 290 MCH 811938
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for a Material Change of Use - Aquaculture
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Currency Period
2. This development approval lapses if the use has not happened by 15 September 2029,
unless an application to extend the currency period is approved by Council.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 34
Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 33 pages
Page 2
Approved Plans
Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
PA-LAB-016 0.01 Site Layout3- 202220929 prepared by Provectus 14/02/2023
Algae
Nature and Extent of Approved Use
3. The Aquaculture facility must be limited to the culture of marine and freshwater microalgae
species in closed system bioreactors and operated in association with an on site research
and technology industry.
Building Appearance
4. Waste storage areas, external approved storage areas, and mechanical equipment are
screened from the street.
5. No part of the site may be used for outdoor storage of materials unless specified on the
Approved Plans or the conditions of this Decision Notice. Materials stored outside of the
building must not exceed 4 metres in height or half the height of the building, whichever is
the greater.
6. All mechanical equipment and other service infrastructure located on the site must be:
a. located not less than 2 metres from a property boundary
b. fully enclosed or screened such that they are not visible from the street frontages nor
adjoining properties. Where screened by landscaping, landscaping beds must be at
least 1.5 metres wide.
Staff Amenities
7. On site amenities, including seating, tables and rubbish bins, must be provided for staff
protected from weather and removed from any noisy or odorous activities.
Landscaping Works
8. A minimum of 15% of the development site must be landscaped. The works must be
undertaken in accordance with Noosa Plan 2020 for that specific area and must include in
particular:
a. provision of one (1) 45 litre feature tree (Cupaniopsis anarcardioides or Banksia
integrifolia or Xanthostemon chrysanthus) in the north eastern corner of the
development site (on the northern side of the driveway);
b. provision of a minimum of four (4) 25-45 litre street trees (Cupaniopsis anarcardioides
or Banksia integrifolia or Xanthostemon chrysanthus) along the Action Street frontage,
located between back of kerb and the footpath; and
c. retention of the existing landscaping onsite.
9. All landscape works must be established and maintained for the life of the development, and
in a manner that ensures healthy, sustained and vigorous plant growth. All plant material
must be allowed to grow to full form and be refurbished when its life expectancy is reached.
Car Parking
10. A minimum of 17 car parking spaces must be provided and marked on site and made
available and accessible at all times for staff and visitors to the site while the use is open for
business. Vehicle manoeuvring areas are provided on site in accordance with the Australian
Standards for Off-street car parking so vehicles enter and leave the site in a forward gear.
Page 2 of 34
Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023
Page 3
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 6, The agency provided its
at DILGP Via MyDAS2 Division 1, Table 1 - response on 14 August
at Aquaculture 2023 (Reference No.
https://prod2.devasses 2306-35006 SRA). A
s.qld.gov.au/suite/ (for copy of the response is
assistance, contact attached
DILGP at 5352 9701 or
email:
[email protected]
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Advertising Devices
1. All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
(Administration) 2015 including both temporary and permanent signage. All freestanding,
pylon or pole signs or signage that is illuminated requires approval from Council prior to being
installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
prohibited from being erected in the Shire.
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Page 3 of 34
Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023
Page 4
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully
Tara Norley
Development Planner
Enc: Appeal Rights
Referral Agency Response
Approved Plans/Documents
cc. Unitywater
SARA
Page 4 of 34
Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023
Page 5
Referral Agency Response
PLANNING ACT 2016 & PLANNING REGULATION 2017
Page 5 of 34
Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023
Page 6
2306-35006 SRA Street Address: 14 Action Street, Noosaville Real Property Description: Lot 290 on MCH811938 Applicant Name: Provectus Algae Pty Ltd Applicant Contact Details: 5 Bartlett Road NOOSAVILLE QLD 4566 [email protected] Human Rights Act 2019 A consideration of the 23 fundamental human rights protected under the Considerations: Human Rights Act 2019 has been undertaken as part of this decision. It has been determined that this decision does not limit human rights. Representations An applicant may make representations to a concurrence agency, at any time before the application is decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules). Copies of the relevant provisions are in Attachment 4. A copy of this response has been sent to the applicant for their information. For further information please contact Cavannah Deller, A/ Senior Planning Officer, on 07 3244 9343 or via email [email protected] who will be pleased to assist. Jamaica Hewston Principal Planner co Provectus Algae Pty Ltd, [email protected] enc Attachment 1 - Referral Agency Conditions Attachment 2 — Advice to the Applicant Attachment 3 - Reasons for Referral Agency Response Attachment 4 -— Representations about a Referral Agency Response Provisions Attachment 5 — Documents Referenced in Conditions State Assessment and Referral Agency Page 2 of 7 Document Set ID: 22581812 Page 6 of 34 Version: 4, Version Date: 15/09/2023
Page 7
Document Set ID: 22581812 Attachment 1—Referral Agency Conditions 2306-35008 SRA (Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development approval relating to this application) (Copies of the documents referenced below are found at Attachment 5) No. Conditions Condition Timing 10.6.1.3.1.1—Aquaculture—The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Agriculture and Fisheries to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. The approved fisheries resources the subject of this approval are limited to the following species which are to be sourced from the CSIRO National Algae Collection: Common Name of Species - Porphyridium purpureum - Haematococcus pluvialis Scientific Name of Species Hereafter referred to as the “approved species”. Prior to commencement of use and to be maintained at all times Development is limited to aquaculture of the approved species within the ‘Production Area’ shown on: * Production Layout Draft prepared by Provectus Algae, dated 14/02/2023, drawing number Building layout and revision 0.01 e Draft prepared by Provectus Algae, dated 14/02/2023, part number PA-LAB-016 — Action St- Site Layout3 and revision 0.01 e Draft prepared by Provectus Algae, dated 14/02/2023, drawing number drawing #, part number PA-LAB-016 — Action St- Site Layout3 and revision 0.01 * Production Overview prepared by Provectus Algae, dated 26/07/2023, drawing no. PA-LAB_016 and revision 1 within the Provectus Algae Environmental Management Plan — Action St prepared by Provectus Algae, dated 1 July 2023, reference PA- MAN-EMS and version 1. At all times The aquaculture facility must be operated generally in accordance with the Provectus Algae Environmental Management Plan — Action St prepared by Provectus Algae, dated 1 July 2023, reference PA- MAN-EMS and version 1, in particular the Water Management, Wastewater Management, Pest and Disease Management and Emergency Preparedness sections. Prior to the commencement of use and to be maintained at all times This aquaculture development constitutes a place that is required to be open for inspection by an inspector pursuant to section 145 of the Fisheries Act 1994. At all times Aquaculture fisheries resources must not be sold, traded, or given away for the purposes of using for bait. At all times Aquaculture fisheries resources must not be released into At all times State Assessment and Referral Agency Version: 4, Version Date: 15/09/2023 Page 3 0f7 Page 7 of 34
Page 8
2306-35006 SRA Queensland waters. Note: It is an offence under the Fisheries Act 1994 to unlawfully release aquaculture fisheries resources, or cause aquaculture fisheries resources fo be released, into Queensland waters. The movement of fisheries resources into, or within, Queensland must comply with the current versions of any relevant health, safety, and biosecurity protocols specific for moving algae species. Note: Health profocols and application forms can be found on the Department's and Business Queensiand website. Note: Commonwealth quarantine protocols must be successfully completed for the relevant organisms of any species prior to their introduction to the approved aquaculture development. At all times Maintain control over the release of water from all ponds, tanks, and drainage systems within the approved aquaculture development. Upon commencement of the use and to be maintained at all times Submit written notice to the Department of Agriculture and Fisheries, via [email protected], advising when construction of the aquaculture facility authorised under this referral agency response: (a) will start (b) has been completed. Any notice must state the application's reference number: 2306- 35006 SRA. (a) At least 5 business days but no greater than 20 business days prior to the commencement of the works (b) Within 15 business days of the completion of the fisheries development works State Assessment and Referral Agency Page 4 of 7 Document Set ID: 22581812 Page 8 of 34 Version: 4, Version Date: 15/09/2023
Page 9
2306-35006 SRA Attachment 2—Advice to the Applicant General Advice 1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation or the State Development Assessment Provisions (SDAP) version 3.0. If a word remains undefined it has its ordinary meaning. 2. Immediately report any unusual clinical signs or mortalities of any fisheries resources brought into Queensland, to Biosecurity Queensiand. It is further advised that every person has a general biosecurity obligation pursuant to the Biosecurity Act 2014 to take all reasonable and practical measures to prevent or minimise biosecurity risks. 3. This approval does not permit the harvest of broodstock and culture stock. Broodstock and/or culture stock may be purchased from the holder of an authority or licence that authorises the sale of the approved species. Depending on the species sought and its location, additional permits may be required under other legislation, for example the Environmental Protection and Biodiversity Conservation Act 1999, the Great Barrier Reef Marine Park Act 1975, the Nature Conservation Act 1992. 4. This approval does not provide any entitlement to access or harvest an aquaculture fisheries resource that becomes an unauthorised escape or release, including but not limited to: (a) animal(s) stocked within the approved aquaculture development that move outside the area; or (b) spawn or progeny of an aquaculture fisheries resource should such eggs, larvae, juveniles or adult progeny become distributed outside of the approved aquaculture development. The responsibility for any impact of unauthorised escapes or releases of aquaculture fisheries resources is with the operator. Additional permits may be required under the Fisheries Act 1994 to authorise processes required to be readily available to effectively manage this risk. 5. It is a requirement of the Fisheries Act 1994 that an annual aquaculture production retum is provided to the Department of Agriculture and Fisheries in the approved form. This includes submitting a nil retum when no aquaculture activity has occurred. 6. itis a requirement under the Fisheries Act 1994 that the Department of Agriculture and Fishenes is notified of any changes to the contact details for the responsible person(s) of this development approval within 21 calendar days in the approved form. State Assessment and Referral Agency Page 5 of 7 Document Set ID: 22581812 Page 9 of 34 Version: 4, Version Date: 15/09/2023
Page 10
2306-35006 SRA Attachment 3—Reasons for Referral Agency Response (Given under section 56(7) of the Planning Act 2076) The reasons for the SARA’s decision are: The development complies with State code 17: Aquaculture of SDAP. Specifically, the development: *® maintains the health and productivity of fisheries resources, fish habitat and the natural environment * maintains commercial, recreational, and indigenous fishing access * manages the health and productivity of aquaculture fisheries resources. Material used in the assessment of the application: * the development application material and submitted plans * Planning Act 2016 * Planning Regulation 2017 * the SDAP (version 3.0), as published by SARA * the Development Assessment Rules * SARA DA Mapping system * section 58 of the Human Rights Act 2019 Attachment 4—Representations about a Referral Agency Response Provisions (page left intentionally blank) State Assessment and Referral Agency Page 6 of 7 Document Set ID: 22581812 Page 10 of 34 Version: 4, Version Date: 15/09/2023
Page 11
Document Set ID: 22581812 Page 11 of 34 Version: 4, Version Date: 15/09/2023
Page 12
2308-35008 SRA Attachment 5—Documents Referenced in Conditions (page left intentionally blank) State Assessment and Referral Agency Page 7 of 7 Document Set ID: 22581812 Page 12 of 34 Version: 4, Version Date: 15/09/2023
Page 13
Development Assessment Rules—Representations about a referral agency response The following provisions are those set out in sections 28 and 30 of the Development Assessment Rules' regarding representations about a referral agency response Part 6: Changes to the application and referral agency responses 28 Concurrence agency changes its response or gives a late response 28.1. Despite part 2, a concurrence agency may, after its referral agency assessment period and any further period agreed ends, change its referral agency response or give a late referral agency response before the application is decided, subject to section 28.2 and 28.3. 28.2. A concurrence agency may change its referral agency response at any time before the application is decided if— (a) the change is in response to a change which the assessment manager is satisfied is a change under section 26.1; or (b) the Minister has given the concurrence agency a direction under section 99 of the Act: or (c) the applicant has given written agreement to the change to the referral agency response? 28.3. A concurrence agency may give a late referral agency response before the application is decided, if the applicant has given written agreement to the late referral agency response. 28.4. Ifa concurrence agency proposes to change its referral agency response under section 28.2(a), the concurrence agency must— (a) give notice of its intention to change its referral agency response to the assessment manager and a copy to the applicant within 5 days of receiving notice of the change under section 25.1; and (b) the concurrence agency has 10 days from the day of giving notice under paragraph (a), or a further period agreed between the applicant and the concurrence agency, to give an amended referral agency response to the assessment manager and a copy to the applicant. ‘ Pursuant to Section 68 of the Planning Act 2016 In the instance an applicant has made representations to the concurrence agency under section 30, and the concurrence agency agrees fo make the change included in the representations, section 28.2(c) is taken to have been satisfied. ” Page 1 of 2 Document Set ID: 22581812 Page 13 of 34 Version: 4, Version Date: 15/09/2023
Page 14
Part 7: Miscellaneous 30 Representations about a referral agency response 30.1. An applicant may make representations to a concurrence agency at any time before the application is decided, about changing a matter in the referral agency response.? 2 An applicant may elect, under section 32, to stop the assessment manager's decision period in which to take this action. If a concurrence agency wishes to amend their response in relation to representations made under this section, they must do so in accordance with section 28. Page 2 of 2 Document Set ID: 22581812 Page 14 of 34 Version: 4, Version Date: 15/09/2023
Page 15
r 2 a a : ‘ 7 ®
PART NOMGER Preduston Layout
Bulding Layout REVISIONS
DSP
AREA
(UY UU) TU I) 7]
pep aeh ty 4 ~{
, t
—l- <1 —1— I
oy] | Pre
Aa
‘ | | CI PRODUCTION AREA i .
PLANS AND DOCUMENTS PRODUCTIONLAYOUT ——ulcegiaya—Suiseyon 4) PROVECTUS.
: Drarr See eater ee
referred to in the REFERRAL
AGENCY RESPONSE 0.01 1:500 A314
Pha SARA ref; 2308-25006 SRA a NES ceusin Oca :
FINAL DIMENSIONS TBC seat es a
Seti, b oe ERG SS Sane eo
pares a
UGE nan ctyont
PLANS AND DOCUMENTS
referred to in the REFERRAL
AGENCY RESPONSE
SARA ref; 2308-35006 SRA
Date: 14 August 2023
Page 15 of 34
Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023
Page 16
r 2 a a : é 7 ®
PART NOMGER PALAB-O16- Aion S: Ste Lyeut3
PALABO16- Acton St Ste Layout REVISIONS
errwesr Tan
SEAWATER
DETAILT
PLANS AND DOCUMENTS
referred to in the REFERRAL
AGENCY RESPONSE
>. ORaiNoe PRLABOTE. PROVECTUS
DRA FT oe A AGE
: = Sa Eager
J SARA ret Osan = se see eee
Date: 14 August 2023 Bitte i EE peace IF IN DOUBT ASK
Document Set ID: 22581812 Page 16 of 34
Version: 4, Version Date: 15/09/2023
Page 17
e PROVECTUS oventas @ ALGAE rewetten eae a0 572 5 Bartlett Rd Noosaville, Queensland 4566 Provectus Algae Environmental Management Plan - Action St PLANS AND DOCUMENTS referred to in the REFERRAL AGENCY RESPONSE SARA ref. 2306-35006 SRA Date: 14 August 2023 Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Lid and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA.MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 17 of 34 Version: 4, Version Date: 15/09/2023
Page 18
e PROVECTUS ovectus @ ALGAE owen eae #08 $72 5 Bartlett Rd Noosaville, Queensland 4566 Table of Contents Environmental Management Policy. Water Management. Efficient Water Usage... Seawater Collection... Nutrient Management. Optimising Nutrient Utilisation... Nutrient Disposal. Wastewater Management... Controlled Administration of Chemicals. Chemical Inventory. Chemical Handling and Storage... Chemical Drift. Airborne Emissions... Waste Management. Traffic and Access Assessment. Pest and Disease Management. Biodiversity Conservation... External Environmental Monitoring Emergency Preparedness Control and Containment Systems to Manage Equipment Failure... Emergency Events due to Unauthorised Access... ture, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 18 of 34 Version: 4, Version Date: 15/09/2023
Page 19
e PROVECTUS Provectus @ ALGAE en exe a6 S72 5 Bartlett Rd Noosaville, Queensland 4566 Introduction This plan outlines our commitment to effective environmental stewardship in the operation of our algae production facility at 14-16 Action St, Noosaville Australia. As a responsible organisation, we recognise the importance of minimising potential environmental impacts and promoting sustainable practices in our operations. Once fully operational, this facility will be equipped with 45 separate bioreactors, capable of containing 180 000 litres. These bioreactors will be housed in a securely enclosed building with restricted entry. To minimise water consumption and waste water generation, a recirculating system will be employed. Importantly, photosynthetic algae utilise CO., providing a powerful mechanism for adopting more sustainable biomanufacturing processes and reducing carbon footprint. Our algae production system represents an innovative approach to cultivating algae for various applications while minimising the reliance on external resources. By implementing this system, we aim to achieve efficient use of water, nutrients, and energy, as well as mitigate the potential release of pollutants into the environment. Neture, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 19 of 34 Version: 4, Version Date: 15/09/2023
Page 20
PROVECTUS ovectus @ ALGAE rwetten eae 208 572 5 Bartlett Rd Noosaville, Queensland 4566 Environmental Management Policy Provectus Algae Pty Ltd recognises its moral and legal responsibility to minimise damage to the environment caused by its work activities. This commitment extends to ensuring that operations do not unnecessarily endanger flora, fauna, sensitive areas, sites of heritage importance or present concerns to members of the public and community. We will endeavour to minimise the impact of the following: * atmospheric emissions; site contamination and spills; noise emission; damage to flora and fauna; damage to, or interference with sites, areas or structures of indigenous or non-indigenous cultural heritage; * — stormwater management; * unnecessary energy consumption. To fulfil this commitment, the Organisation will observe all environmental laws and promote environmental awareness among all workers. Provectus Algae Pty Ltd will actively: assess our eco-footprint to identify environmental impacts and move towards more sustainable practices; + identify waste streams and examine options for effective waste management; * assess our purchasing requirements (buy recycled materials, reduce waste, use less harmful/volatile chemicals); + improve storage (reduce quantity, waste and spills, reduce odours by keeping containers closed); * conserve energy (eco-friendly lights, turn lights off, efficient emergency equipment, greener fuel sources — such as Liquid Petroleum Gas (LPG) and methane); conserve water (install water-saving accessories, repair leaks); preserve waterways (clearly mark and protect stormwater drains); emergency planning and spill response; seek appropriate licenses/permits from State Environmental Protection Agencies (EPA) and other relevant authorities; * where indigenous or non-indigenous cultural heritage issues may be relevant, check with planning authorities to ensure that appropriate assessment has occurred, and licenses or permits obtained; + improve education/awareness; * notify relevant authority in the event of a major environmental impact. Neture, Accelerated Email: [email protected] Website: www.provectusaigae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 20 of 34 Version: 4, Version Date: 15/09/2023
Page 21
PROVECTUS ovectus @ ALGAE rowetnen eae #08 572 5 Bartlett Rd Noosaville, Queensland 4566 Responsibilities Provectus Algae Pty Ltd is committed to: integrating environmental consideration into all aspects of operations; * compliance with all relevant legislative requirements and cooperation with regulatory bodies; * measurable targets to ensure continued improvement reflected in accountability/key performance indicators at all levels; * consultation with workers and other parties to improve decision-making on environmental matters; + identification of environmental issues, assessment of risks and implementation of best practice controls to limit negative impacts to the environment; + development, implementation and review of written work procedures; * distribution and communication of information and work procedures; * training and supervision to workers to ensure written procedures to minimise environmental impacts are followed. Workers expected to: * take reasonable care, and consideration, of environmental impacts, while at work; * co-operate with work instructions to enable compliance with legal obligations; * participate in consultative arrangements concerning environmental matters; assist management in meeting environmental targets/key performance indicators. Maso Spaunioa, CEO & Founder Neture, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 21 of 34 Version: 4, Version Date: 15/09/2023
Page 22
“© pRovectus Provectus Algae Pty Ltd oO ALGAE ACN 625 465 572 5 Bartlett Rd Noosaville, Queensland 4566 Water Management Efficient Water Usage The recirculating production system is designed to ensure the efficient utilisation of water resources throughout the entire production process. Water is carefully managed, filtered and recycled within the closed system, minimising the need for additional water inputs and reducing overall water consumption. Furthermore, the design of cleaning and washdown procedures takes into account the objective of minimising water consumption. Seawater Collection Certain species intended for production grow in saline environments. Salt water utilised in production will exclusively originate from operators who possess a valid water collection permit. External auditing and certification mitigates the risk of unacceptable ecological impacts. Permit currency shall be audited in accordance with the Annual Audit Schedule. Nutrient Management Optimising Nutrient Utilisation The media formulation utilised is a widely adopted recipe for algae cultivation, including algae intended for human consumption. All nutritional components are agricultural-grade fertilisers which are used extensively as fertilisers for food crops, including foliar applications, with no withholding periods specified. The media formulation, including contaminant levels, adheres to the standards outlined in the Code of Practice for the Naming and Describing of Fertilisers and for the Levels of Contaminants in Fertilisers (Biosecurity Regulation 2016). Extensive species-specific research has been conducted to ascertain the optimal media addition rate, ensuring the prevention of nutrient accumulation while avoiding any limitations on algal growth. Cell analytics are employed to accurately calculate the appropriate dosage of media, effectively mitigating the risk of nutrient buildup. In addition, the water nitrate level will be continuously monitored with an ideal range of 1-5 ppm and an upper limit of 10 ppm. Nutrient Disposal Media concentrate shall be used solely for its intended purpose. If, for any reason, it cannot be used as intended, the services of a professional waste di engaged. PLANS AND DOCUMENTS referred to in the REFERRAL AGENCY RESPONSE SARA ref: 2306-35006 SRA Date: 14 August 2023 Neture, Accelerated ee Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or othenwize used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 22 of 34 Version: 4, Version Date: 15/09/2023
Page 23
6 PROVECTUS. Provectus @ ALGAE non e22 ae 573 5 Bartlett Rd Noosaville, Queensland 4566 Wastewater Management The recirculated algae system minimises the generation of wastewater. The operation at full Capacity is anticipated to generate approximately 7 000 L per day of wastewater from operation of the bioreactors, processing of algal cell mass and cleaning activities. All water used in the production system will undergo ultrafiltration and ultraviolet treatment; wastewater will be transferred into a holding tank and undergo dose chlorination prior to discharge to the sewer to ensure that no viable organisms are discharged to waste. Media addition is based on algal cell analytics to reduce nutrient accumulation in the system. Water levels shall typically range from 1-5 ppm nitrate and not exceed 10 ppm. No environmental impacts have been identified in association with the planned method of processing and wastewater discharge. Waste Water Composition was calculated considering water filtration, volumes per day, water type and composition. The Risk Assessment has been completed and approved by Unity Water and the Trade Waste Discharge Permit was approved and issued under the number #19318 and as per below images: PLANS AND DOCUMENTS Ye referred tointhe REFERRAL = gp AGENCY RESPONSE — SARA ref. 2306-35006 SRA Date: 14 August 2023 Nature, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA.MAN.EMS Version 1 July 2023 Document Set ID: 22581812 Page 23 of 34 Version: 4, Version Date: 15/09/2023
Page 24
PLANS AND DOCUMENTS e PROVECTUS referred to in the REFERRAL eae Provectus Algae Pty Ltd AGENCY RESPONSE @ ALGAE ACN 625 465 572 SARA ref. 2306-35008 SRA 5 Bartlett Rd Date: 14 August 2023 Noosaville, Queensland 4566 Pe PROVECTUS J Action St. Water Treatment 10.0000 “outtient is the fertliser for the algae. _— gat recired in the water 10 some degree. Nutiient dosing ) Second we want to add mecta to this system tank tor dosing into the production tanks. ot OT — — — — i | Tark 1. 50.000 intake Tank 2. 80.0001 Holding Tark 3. 80.0001 Holding Tank 4. 90.9001 Ettuent SW tank (22pp0) tank (32ppe wi nutrient) tank (2ppt wy nutrient) ‘Water tsk (10001) ge ee ~ ~ aa \ n Sye Recire + Filter 10% per day UN sysiem ~BOmyeme Chile ~21C “we are currently thinking of wing the ‘walor input HVAC Iauid cnvier unit to regulate the imake water into the Reactors #0. 000LDay J yy WE: 180.0000 Facility wi 50% harvest volume per day Ys FS SSBB et DoWatering: LigoFLux -Algae harvesting Unit men High Level Water Treatment Fluid Flow - Action St Accelerated Email: [email protected] Website: www.provectusaigae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used wit Algae. Any disclosure, storage or reproduction of any part of this document must be authorized in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN.EMS Version 1 July 2023 ut the express permizzion of Provecti Document Set ID: 22581812 Page 24 of 34 Version: 4, Version Date: 15/09/2023
Page 25
PROVECTUS ALGAE PLANS AND DOCUMENTS referred to in the REFERRAL AGENCY RESPONSE SARA ref: 2306-35006 SRA Date: 14 August 2023, EFFLUENT WATER SYSTEM mn Fron You ‘aah crc Yo See coon? seer Effluent Water Process Noture, Accelerated Email: [email protected] Website: www.provectusalgae.com Provectus Algae Pty Ltd ACN 625 465 572 5 Bartlett Rd Noosaville, Queensland 4566 CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Lid and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PROVECTUS ALGAE PLANS AND DOCUMENTS. referred to in the REFERRAL AGENCY RESPONSE SARA ref: 2306-35006 SRA (ae Date: 14 August 2023, 2 DsP 4 eng? ota Tare oon Tare TK Prue ant Downstream Processing Diagram Noture, Accelerated Email: [email protected] Website: www.provectusalgae.com PA-MAN-EMS Version 1 July 2023 Provectus Algae Pty Ltd ACN 625 465 572 5 Bartlett Rd Noosaville, Queensland 4566 CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Lid and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority, Document Set ID: 22581812 Version: 4, Version Date: 15/09/2023 PA-MAN-EMS Version 1 July 2023 Page 25 of 34
Page 26
PROVECTUS PLANS AND DOCUMENTS referred to in the REFERRAL Provectus Algae Pty Ltd AGENCY RESPONSE ALGAE ACN 625 465 572 SARA ref: 2306-35006 SRA 5 Bartlett Rd Date: 14 August 2023 Noosaville, Queensland 4566 Wastewater Treatment Flow Noture, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority PA-MAN-EMS Version 1 July 2023 PLANS AND DOCUMENTS referred to in the REFERRAL AGENCY RESPONSE PROVECTUS ALGAE Provectus Algae Pty Ltd ACN 625 465 572 kg SARA ref, 2306-38006 SRA 5 Bartlett Rd Date: 14 August 2023, Noosaville, Queensland 4566 aos 6s tn 1300 Sump, Pure gn at i xs é aa Bunding and submersible pump systems. Noture, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Ply Lid and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN-EMS Version 1 July 2023, Document Set ID: 22581812 Page 26 of 34 Version: 4, Version Date: 15/09/2023
Page 27
e PROVECTUS ovatus @ ALGAE rowetton eae #08 572 5 Bartlett Rd Noosaville, Queensland 4566 Controlled Administration of Chemicals Chemical Inventory An up-to-date inventory of all chemicals used in the biocycle algae production is maintained. This inventory includes chemical names, quantities, hazard classifications, safety data sheets (SDS), and storage locations. This inventory is periodically reviewed and updated. Chemical Handling and Storage All personnel involved in the handling and application of chemicals shall be trained on the proper procedures, including safety precautions, personal protective equipment (PPE) requirements, and emergency response protocols. Chemicals are stored in designated areas that are secure, well-ventilated, and appropriately labelled. Spill containment systems are used for hazardous materials to prevent leaks or spills from reaching the environment. Incompatible chemicals are segregated. Chemical storage is audited in accordance with the Annual Audit Schedule. Chemical Use Only designated, trained staff are authorised to use chemicals. Relevant Standard Operating Procedures cover the use of all chemicals utilised during production. Scientific grade measuring cylinders and calibrated scales shall be used for ensuring accurate chemical measurement and application. Detailed records of chemical applications, including dates, quantities used, and bioreactors treated shall be kept. Chemical Drift Due to the closed nature of the bioreactors and the facility, there will be no occurrence of chemical drift. Airborne Emissions The cultivation of algae in closed system bioreactors will not generate emissions of dusts, vapours, gases or other airborne contaminants. Any airborne emissions within the production facility, generated independently of the closed bioreactors, will be filtered through the HVAC system (hepa filtered) to remove microbial and particulate matter. N ©, Accelerated Email: [email protected] Website: www.provectusaigae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 27 of 34 Version: 4, Version Date: 15/09/2023
Page 28
e PROVECTUS oveots @ ALGAE owetton eae #08 $72 5 Bartlett Rd Noosaville, Queensland 4566 Waste Management Minimal solid waste will be generated through the production process. Media packaging materials will be appropriately recycled. In the event of unforeseen circumstances requiring the disposal of algae, proper treatment will be conducted prior to discharge to ensure the absence of viable cells. Wastewater management is addressed separately. Energy Efficiency Energy-efficient LED lighting has been utilised for the lighting system for algae production. Additional, LED lighting will be utilised throughout the entire facility, with all internal lighting being switched off outside of operational hours. A HVAC system shall be utilised to maintain the required process temperature range for algae growth without excessive energy consumption. The production and lab areas utilise cold room panelling to form an insulator. This assists with the reduction of eneray consumption required to maintain environmental conditions through the HVAC system. Selection of an electricity plan utilising green renewable energy from wind presents various advantages: reduced operating costs along with lowered carbon emissions; predictable and cost-effective finances for electricity-generation; reduced costs of maintenance and fuel. The energy efficiency performance of all equipment shall be assessed prior to selection with preference given to items with low energy consumption. Equipment will be reviewed periodically to assess potential technological advancements with improved energy efficiency. Where required, process piping is insulated and lagged to reduce energy losses. PA actively supports the option of remote working, where practicable, to further minimise environmental impacts. Noise Assessment The planned procedures will utilise closed system bioreactors that operate exclusively within enclosed workrooms located in a fully sealed building. It is expected that the noise levels originating from the building will not surpass background noise level, making a Noise Management Plan unnecessary at this point. If any alterations are made to the operations, noise levels will be monitored accordingly. ©, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN.EMS Version 1 July 2023 Document Set ID: 22581812 Page 28 of 34 Version: 4, Version Date: 15/09/2023
Page 29
“© PROVECTUS @ ALGAE referred to in the REFERRAL AGENCY RESPONSE SARA ref: 2306-35006 SRA Date: 14 August 2023 PLANS AND DOCUMENTS yh Provectus Algae Pty Ltd ACN 625 465 572 5 Bartlett Rd Noosaville, Queensland 4566 Traffic and Access Assessment As required, PA will engage external contractors to manage traffic during non-standard processes. There are no foreseen concerns regarding additional traffic or access issues to the site during standard processes. The building site is located within an industrial zone. Pest and Disease Management Tanks are exclusively inoculated from cultures that have undergone rigorous identity and purity speciation. Inoculation cultures are placed in quarantine until positive speciation results are obtained in accordance with SOP-QUA-035 Incoming Materials Quarantine. This robust testing includes morphological taxonomy and DNA barcoding. Any cultures showing signs of impurity will be deemed unsuitable for production and will be disposed of following approved decontamination and disposal protocols. The closed system employed in the process significantly minimises the risk of pest and disease contamination. Daily microscopic analysis is performed on the production culture to ensure its integrity. The species used in production are not classified as pests or diseases, nor are they known carriers of pests or disease-causing organisms. Consequently, there is no anticipated unacceptable environmental or health risk associated with any potential unintended release resulting from natural or man-made disasters. The production area has a negative pressure differential of at least 5 pascals to restrict air dispersion to the environment. In addition, a HVAC system shall be operational with hepa filters to filter airborne microorganisms and particulate matter. A tank cleaning procedure is established (SOP-PRO-010 Bioreactor Clean in Place Procedure) to reduce the risk of tank bioburden. An environmental monitoring procedure will be established within the production area to allow for early detection of any microbial contamination issues and the implementation of timely corrective actions. Proceduralised entry requirements have been established to assist with mitigation of pest/disease management. Furthermore, entry to the production area is regulated through a controlled entry system and a dedicated airlock. All wastewater will undergo dose chlorination prior to discharge to ensure that no viable organisms are discharged to waste. Neture, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. Document Set ID: 22581812 Version: 4, Version Date: 15/09/2023 PA-MAN-EMS Version 1 July 2023 Page 29 of 34
Page 30
e PLANS AND DOCUMENTS PROVECTUS referred to in the REFERRAL @ ALGAE AGENCY RESPONSE SARA ref: 2306-35008 SRA Wee Geeerens Provectus Algae Pty Ltd ACN 625 465 572 5 Bartlett Rd Noosaville, Queensland 4566 Date: 14 August 2023 Biodiversity Conservation The closed system production method, and disposal of non-viable organisms, ensures that there are no concerns regarding the conservation of biodiversity. External Environmental Monitoring Taking into account the self-contained nature of our operation and the appropriate disposal of non-viable organisms, our risk assessment has determined that the impact of our processes on the surrounding environment is minimal. Consequently, we have reached the conclusion that an external environmental monitoring program is currently unnecessary and not applicable. Emergency Preparedness Control and Containment Systems to Manage Equipment Failure A dedicated monitoring system shall be utilised for monitoring critical parameters and process performance. Alerts are automated to notify relevant personne! immediately in the event of critical process deviations (out of specifications). Comprehensive documentation of emergency shutdown procedures is in place, and personnel undergo thorough training and competency assessments to ensure their proficiency in executing these procedures. A preventative maintenance schedule will assist in addressing potential equipment issues before they lead to failure. Scheduled maintenance activities help ensure equipment reliability and reduce the likelihood of unexpected failures. Each bioreactor is constructed as an individual, self-contained unit, completely separate from the others. Consequently, in the event of a breach in the integrity of one bioreactor, the remaining bioreactors will remain unaffected, ensuring their continued integrity. In the event of a major breach to bioreactor integrity (e.g., major equipment failure, natural or man-made disaster), the entire facility is bunded to hold 100% of the process facility (approximately 200 000 L). The bunded liquid is processed through a submersible pump into a water treatment/neutralisation system prior to any trade waste discharge. Neture, Accelerated Email: [email protected] Website: www.provectusaigae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Lid and may not - in full or in part - be pazzed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. Document Set ID: 22581812 Version: 4, Version Date: 15/09/2023 PA-MAN-EMS Version 1 July 2023 Page 30 of 34
Page 31
e PROVECTUS erovectus £ ALGAE non e2e a8 573 5 Bartlett Rd Noosaville, Queensland 4566 Emergency Events due to Unauthorised Access Access to the building is regulated through the use of restricted locks, and subsequent entry to the production space is further controlled by an additional restricted lock system. A monitored alarm system is installed to ensure prompt detection in the event of a breach to site integrity. Flood The site is situated at an elevation that is not susceptible to Extreme Flood Events, as indicated by the flood maps (Noosa Council Public Mapping System - Flood and Storm Management; see Figure 1 & 2). The integrity of the site's containment will remain intact even in the event of floods. Major Flood Extent: These maps show major flood inundation extents and represent a large and relatively uncommon flood event which may occur (at least) once in an average life time. It is possible although less likely for a flood event of this size to occur more than once in a single lifetime. (Noosa Council, 2023) ae ee Figure 1: Major Flood Extent (Noosa Council, 2023) PLANS AND DOCUMENTS referred to in the REFERRAL AGENCY RESPONSE SARA ref: 2306-35006 SRA Date: 14 August 2023 Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be pazzed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA.MAN.EMS Version 1 July 2023 Document Set ID: 22581812 Page 31 of 34 Version: 4, Version Date: 15/09/2023
Page 32
e PROVECTUS —o @ ALGAE rrweetcN e2e ee $72 5 Bartlett Rd Noosaville, Queensland 4566 Extreme Flood Extent: These maps show extreme inundation extents. These extents represent very large and very unlikely (rare) flood events. These are exceptional events that relatively few people will ever witness. Whilst very unlikely, it is possible for these events to occur. (Noosa Council, 2023) Figure 2: Extreme Flood Extent (Noosa Council, 2023) PLANS AND DOCUMENTS referred to in the REFERRAL AGENCY RESPONSE SARA ref: 2306-35006 SRA Date 14 August 2023 Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA. MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 32 of 34 Version: 4, Version Date: 15/09/2023
Page 33
6 PROVECTUS ovectus Algae @ ALGAE owetteN eos ae 73 5 Bartlett Rd Noosaville, Queensland 4566 Fire This overlay shows bushfire prone areas, grass fire prone areas and low fuel load areas. (Noosa Council, 2023). The site is not located in a fire prone or potential impact buffer area (see Figure 3). If a fire were to occur, it is not anticipated that any significant adverse environmental impacts would result from a breach in site integrity. This low risk is due to the specific species being produced (native and common) and the chemical composition (non-hazardous) of the production water. In addition, the facility is a standalone, independent, building with unrestricted access should emergency services require it. GB Bushfire Hozard Ares (Bushfire Prone Area) GB Very Fign Potential Bushfire intensity GB High Potential Bushfire Intensity MB Mecium Potential Bushfire Intensity Potential Impact Buffer PLANS AND DOCUMENTS weep Figure 3: Bushfire (Noosa Council, 2023) referred tointhe REFERRAL (iP AGENCY RESPONSE Sao SARA ref: 2306-35006 SRA Date: 14 August 2023 N Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Lid and may not - in full or in part - be pazzed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA.MAN-EMS Version 1 July 2023 Document Set ID: 22581812 Page 33 of 34 Version: 4, Version Date: 15/09/2023
Page 34
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 34 of 34
Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023
Used in these records
SUPERSEDED - Decision Notice - MCU23 0038 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.