Council archive · source document
SUPERSEDED - Decision Notice - MCU23 0038 [As Published] · MCU23/0038
e PROVECTUS oveots @ ALGAE owetton eae #08 $72 5 Bartlett Rd Noosaville, Queensland 4566 Waste Management Minimal solid waste will be generated through the production process. Media packaging materials will be appropriately recycled. In the event of unforeseen circumstances requiring the disposal of algae, proper treatment will be conducted prior to discharge to ensure the absence of viable cells. Wastewater management is addressed separately. Energy Efficiency Energy-efficient LED lighting has been utilised for the lighting system for algae production. Additional, LED lighting will be utilised throughout the entire facility, with all internal lighting being switched off outside of operational hours. A HVAC system shall be utilised to maintain the required process temperature range for algae growth without excessive energy consumption. The production and lab areas utilise cold room panelling to form an insulator. This assists with the reduction of eneray consumption required to maintain environmental conditions through the HVAC system. Selection of an electricity plan utilising green renewable energy from wind presents various advantages: reduced operating costs along with lowered carbon emissions; predictable and cost-effective finances for electricity-generation; reduced costs of maintenance and fuel. The energy efficiency performance of all equipment shall be assessed prior to selection with preference given to items with low energy consumption. Equipment will be reviewed periodically to assess potential technological advancements with improved energy efficiency. Where required, process piping is insulated and lagged to reduce energy losses. PA actively supports the option of remote working, where practicable, to further minimise environmental impacts. Noise Assessment The planned procedures will utilise closed system bioreactors that operate exclusively within enclosed workrooms located in a fully sealed building. It is expected that the noise levels originating from the building will not surpass background noise level, making a Noise Management Plan unnecessary at this point. If any alterations are made to the operations, noise levels will be monitored accordingly. ©, Accelerated Email: [email protected] Website: www.provectusalgae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Ltd and may not - in full or in part - be passed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. PA-MAN.EMS Version 1 July 2023 Document Set ID: 22581812 Page 28 of 34 Version: 4, Version Date: 15/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - MCU23 0038 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.