Council archive · source document
SUPERSEDED - Decision Notice - MCU23 0038 [As Published] · MCU23/0038
e PLANS AND DOCUMENTS PROVECTUS referred to in the REFERRAL @ ALGAE AGENCY RESPONSE SARA ref: 2306-35008 SRA Wee Geeerens Provectus Algae Pty Ltd ACN 625 465 572 5 Bartlett Rd Noosaville, Queensland 4566 Date: 14 August 2023 Biodiversity Conservation The closed system production method, and disposal of non-viable organisms, ensures that there are no concerns regarding the conservation of biodiversity. External Environmental Monitoring Taking into account the self-contained nature of our operation and the appropriate disposal of non-viable organisms, our risk assessment has determined that the impact of our processes on the surrounding environment is minimal. Consequently, we have reached the conclusion that an external environmental monitoring program is currently unnecessary and not applicable. Emergency Preparedness Control and Containment Systems to Manage Equipment Failure A dedicated monitoring system shall be utilised for monitoring critical parameters and process performance. Alerts are automated to notify relevant personne! immediately in the event of critical process deviations (out of specifications). Comprehensive documentation of emergency shutdown procedures is in place, and personnel undergo thorough training and competency assessments to ensure their proficiency in executing these procedures. A preventative maintenance schedule will assist in addressing potential equipment issues before they lead to failure. Scheduled maintenance activities help ensure equipment reliability and reduce the likelihood of unexpected failures. Each bioreactor is constructed as an individual, self-contained unit, completely separate from the others. Consequently, in the event of a breach in the integrity of one bioreactor, the remaining bioreactors will remain unaffected, ensuring their continued integrity. In the event of a major breach to bioreactor integrity (e.g., major equipment failure, natural or man-made disaster), the entire facility is bunded to hold 100% of the process facility (approximately 200 000 L). The bunded liquid is processed through a submersible pump into a water treatment/neutralisation system prior to any trade waste discharge. Neture, Accelerated Email: [email protected] Website: www.provectusaigae.com CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Lid and may not - in full or in part - be pazzed on, reproduced, published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority. Document Set ID: 22581812 Version: 4, Version Date: 15/09/2023 PA-MAN-EMS Version 1 July 2023 Page 30 of 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - MCU23 0038 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.