SUPERSEDED - Decision Notice - MCU23 0038 [As Published] · MCU23/0038

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

e PLANS AND DOCUMENTS
PROVECTUS referred to in the REFERRAL
@ ALGAE AGENCY RESPONSE

SARA ref: 2306-35008 SRA

Wee

Geeerens

Provectus Algae Pty Ltd
ACN 625 465 572

5 Bartlett Rd

Noosaville, Queensland 4566

Date: 14 August 2023

 

 

 

Biodiversity Conservation

The closed system production method, and disposal of non-viable organisms, ensures that
there are no concerns regarding the conservation of biodiversity.

External Environmental Monitoring

Taking into account the self-contained nature of our operation and the appropriate disposal
of non-viable organisms, our risk assessment has determined that the impact of our
processes on the surrounding environment is minimal. Consequently, we have reached the
conclusion that an external environmental monitoring program is currently unnecessary and
not applicable.

Emergency Preparedness

Control and Containment Systems to Manage Equipment Failure

A dedicated monitoring system shall be utilised for monitoring critical parameters and
process performance. Alerts are automated to notify relevant personne! immediately in the
event of critical process deviations (out of specifications).

Comprehensive documentation of emergency shutdown procedures is in place, and
personnel undergo thorough training and competency assessments to ensure their
proficiency in executing these procedures.

A preventative maintenance schedule will assist in addressing potential equipment issues
before they lead to failure. Scheduled maintenance activities help ensure equipment
reliability and reduce the likelihood of unexpected failures.

Each bioreactor is constructed as an individual, self-contained unit, completely separate
from the others. Consequently, in the event of a breach in the integrity of one bioreactor, the
remaining bioreactors will remain unaffected, ensuring their continued integrity.

In the event of a major breach to bioreactor integrity (e.g., major equipment failure, natural or
man-made disaster), the entire facility is bunded to hold 100% of the process facility
(approximately 200 000 L). The bunded liquid is processed through a submersible pump into
a water treatment/neutralisation system prior to any trade waste discharge.

Neture, Accelerated
Email: [email protected] Website: www.provectusaigae.com

CONFIDENTIALITY NOTICE: This document is the property of Provectus Algae Pty Lid and may not - in full or in part - be pazzed on, reproduced,
published or otherwise used without the express permission of Provectus Algae. Any disclosure, storage or reproduction of any part of this
document must be authorised in writing by Provectus Algae and then only in strict compliance with that authority.

Document Set ID: 22581812
Version: 4, Version Date: 15/09/2023

PA-MAN-EMS Version 1 July 2023

Page 30 of 34

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Decision Notice - MCU23 0038 [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.