Updated EMP Stage 2_Grasstree Court April 2023
ECOLOGICAL MANAGEMENT PLAN
STAGE 2 – Lot 9
Incorporating the:
• Vegetation and Fauna Management Plan – Stage 2
• Rehabilitation Management Plan – Stage 2
Prepared for Blue Care
Grasstree Court
Sunrise Beach, Qld, 4567
Lot 9 SP322789
Author: JUSTIN WATSON
Date: April 2023
Gondwana Ecology Group Pty Ltd - PO Box 535, Kenmore, QLD 4069 - www.gondwanaecology.com.au
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Updated EMP Stage 2_Grasstree Court April 2023.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 46 pages
Page 2
DISCLAIMER
In accordance with the Copyright Act, no part of this report or attachments may be reproduced without the explicit
permission of Gondwana Ecology Group Pty Ltd. This report does not constitute legal advice.
This report has been produced for Blue Care (Client) specifically for the purpose for which it is supplied.
Several assumptions have been made during the preparation of this report. This includes the accuracy of information and
documents provided to Gondwana Ecology Group by the Client and that accessed on Commonwealth, State and other
databases.
If any other Party makes use of the information contained within this report, Gondwana Ecology Group will not be held
liable to a Third Party for any loss, damage or claim as a result of the use of information contained herein.
QUALITY ASSURANCE
# Author Signature Date
1 J. Watson* Draft November 2018 for review
2 J.Watson (with K.Treers & L.Phelan)1 JW 19 December 2018 for Council approval
8 May 2019 for Council approval
3 J.Watson JW
(incorporating State conditions & Council 2019 conditions)
5 February 2021 for Council Approval
4 J.Watson JW (EMP Stage 1 – updated to address staged development –
Lot 6)
1 July 2021 for Council Approval
5 J.Watson2,3 JW (EMP Stage 2 – updated to address staged development –
Lot 9) – approved by Council OPW 17 December 2021
13 April 2023 for Council Approval
6 J.Watson4 JW
(updated subsequent to Stage 1 rehabilitation works)
7 J.Watson 28 April 2023 (updated with Council comments)
CONTACT DETAILS
Gondwana Ecology Group Pty Ltd (ABN 20 143 747 326)
PO Box 535
Kenmore
QLD, 4069
www.gondwanaecology.com.au
GONDWANA ECOLOGY GROUP operates in accordance with the following approvals, permits and ethical principles:
• Scientific Use Registration (Animal Care & Protection Act 2001) – 508
• Animal Ethics Committee (DAFF Animal Ethics) – CA 2022/09/1651
• Scientific Purposes Permit (Nature Conservation Regulation 2006) – WISP 13794613
• *Certified Environmental Practitioner (Environment Institute of Australia & New Zealand)
• Registered as a Suitably Qualified Person with Queensland Government for protected flora surveys
1 ArborCare Queensland
2 With input from E.Pratt Harmony Landscapes Restoration Ecology
3 With recommendations from L.Pratt (Biodiverse Environmental)
4 With L.Pratt (Biodiverse Environmental - rehabilitation contractor for Stage 1 & 2 works) & Calibre (project engineers)
NOTE:
This 2023 plan has been updated to reflect the staged development and improved rehabilitation process for Stage 2.
Stage 1 EMP for Lot 6 approved by Noosa Shire Council February 2021
Stage 2 EMP for Lot 9 approved by Noosa Council December 2021 – updated to incorporate amendments to rehabilitation works
i
Page 3
TABLE OF CONTENTS – ECOLOGICAL MANAGEMENT PLAN
1. INTRODUCTION ...................................................................................................................................1
1.1 SUBJECT LAND AND APPROVED DEVELOPMENT ............................................................................ 1
1.2 PURPOSE OF THE PLAN ........................................................................................................................ 2
1.3 OBJECTIVES .......................................................................................................................................... 2
1.4 STATEMENT ......................................................................................................................................... 2
2. STRUCTURE AND RESPONSIBILITY OF THE MANAGEMENT PLAN .........................................................3
ATTACHMENTS ...................................................................................................................................................... 6
FIGURE 1- SUBJECT LAND (LOT 9 IDENTIFIED BY WHITE DASHED OUTLINE). SOURCE: AERIAL NEARMAP
NOVEMBER 2022. ........................................................................................................................... 7
FIGURE 2 – APPROVED STAGED DEVELOPMENT .................................................................................................. 8
FIGURE 3 – STAGED CLEARING PLAN .................................................................................................................... 9
APPENDIX A VEGETATION AND FAUNA MANAGEMENT PLAN – STAGE 2
1. INTRODUCTION ................................................................................................................................. 11
2. GLOSSY BLACK-COCKATOO TREES ..................................................................................................... 11
2.1 ACTIVE FEED TREE IDENTIFICATION ................................................................................................... 11
2.2 SEED COLLECTION AND PROPAGATION ............................................................................................. 11
2.2 THREATENED FLORA .......................................................................................................................... 12
3. VEGETATION PROTECTION ................................................................................................................ 13
4. FAUNA MANAGEMENT...................................................................................................................... 14
4.1 PRE-CLEARING .............................................................................................................................. 14
4.2 CLEARING & CONSTRUCTION ....................................................................................................... 14
4.3 HABITAT CREATION ...................................................................................................................... 14
5. VEGETATION CLEARING ..................................................................................................................... 15
5.1 DEVELOPMENT AREA - LOT 9 - CLEARING METHODOLOGY ......................................................... 15
5.2 BUSHFIRE BUFFER AREAS ............................................................................................................. 15
5.3 CLEARING DIRECTION ................................................................................................................... 15
6. LIGHTING ........................................................................................................................................... 16
7. FENCING ............................................................................................................................................ 16
8. COMMUNITY CONSULTATION ........................................................................................................... 17
APPENDIX B - REHABILITATION MANAGEMENT PLAN – STAGE 2
1. INTRODUCTION ................................................................................................................................. 23
2. SITE TREATMENT AND TRANSFER METHODS ..................................................................................... 23
2.1 OVERVIEW.......................................................................................................................................... 23
2.2 STAGE 2 WORKS TO BE COMPLETED ................................................................................................. 25
2.2 SOIL SEED BANK TRANSFER................................................................................................................ 25
2.3 CLEARING METHODOLOGY ................................................................................................................ 25
2.4 TRANSPORTING MATERIAL ................................................................................................................ 25
3. THREATENED FLORA AND SEED COLLECTION..................................................................................... 26
4. RECEIVING SITE REHABILITATION ...................................................................................................... 27
4.1 DESCRIPTION AND TENURE ............................................................................................................... 27
4.2 TREATMENT AREAS ............................................................................................................................ 27
4.3 RECEIVING SITE PREPARATION AND CAPPING................................................................................... 27
4.4 RECEIVING SITE PLANTING AND HABITAT CREATION ........................................................................ 28
4.5 IRRIGATION AND WATERING ............................................................................................................. 29
5. CLEARING OF LOT 9, REHABILITATION ESTABLISHMENT AND MAINTENANCE ................................... 30
6. PERFORMANCE CRITERIA AND MONITORING .................................................................................... 31
ii
Page 4
2023 Ecological Management Plan – Grasstree Court – Lot 9
1. INTRODUCTION
1.1 Subject Land and Approved Development
The subject land is located at land on Grasstree Court, Sunrise Beach and formally described as Lot 6 on
RP901384 (SP322789) and Lot 9 on SP252905 (SP322789) (FIGURE 1 – Aerial of Subject Land).
On 20 December 2011, the Sunshine Coast Council (Council) approved a development application for a Material
Change of Use for Multiple Housing – Type 3 Retirement and Special Needs, Commercial Business – Type 2
Medical and Wellbeing –Type 1 Health; and the Reconfiguring a Lot (1 into 2 lots). The State (DERM) approved
the development in June 2011.
The proposal will result in the residential aged care facility to be situated on Lot 6 (northern lot) and a
retirement facility to be situated on Lot 9 (southern lot) which includes independent living apartments / units,
and a community facility.
Minor Change 2019
A minor change amendment application was made to Noosa Shire Council (Council) in December 2018. The
minor change does not result in change of approved uses but rather minor changes to internal building layouts
to meet current market expectations, industry standards and the existing approval conditions. While the
changes are considered to be ‘minor’, the changes improve the development outcome in terms of design
quality, reduced hardstand area, bushland and waterway protection and bushfire safety. Council granted
approval of this change request on 28 March 2019 with updated set of conditions. Conditions relating to the
ecological component (other than change to Lot numbers) are unchanged from the original approval. The
conditions (under #12) also state that “The establishment of the vegetation offsets must be completed prior to
the commencement of the use of the first stage”.
Minor Change 2020
In November 2020 Council granted a minor change to stage the development (Minor Change Lot 6). The
development is to proceed in a staged approach with Lot 6 (as stage 1) followed by Lot 9 as stages 2, 3 and 4.
Council has approved the Ecological Management Plan (EMP) for Stage 1 Lot 6 (February 2021). FIGURE 2
illustrates the Approved Staged Development and FIGURE 3 the Staged Clearing Plan. There are no other
changes that adversely alter the vegetation clearing, fauna management or rehabilitation actions. The staging
approach has allowed some ecological enhancements, including staging of the clearing of vegetation (and
trees), and an improved rehabilitation strategy for the offset/rehabilitation site.
Relevant amended conditions (10 November 2020) associated with the Minor Change are 12.3.7 and 12.4, as
follows:
All information must be prepared by a person with industry experience in the successful establishment and/or
re-establishment of heathland vegetation. Industry and educational institution involvement is recommended.
The establishment of the vegetation offsets for each stage must be completed prior to the commencement of
the use for each stage. The Vegetation Clearing Offset program, required by these conditions, must be
implemented in a staged manner reflective of the approved staging of the development. To this end separate
Vegetation Clearing Offset programs must be developed to reflect the staged delivery of the development, in
particular the staged development of lot 6, and the subsequent development of lot 9.
No clearing is permitted unless in accordance with the approved staged Vegetation Clearing Offset program 1.
Minor Change 2021
In December 2021 Council granted a minor change for Lot 9 which included amendment to Condition 1 (the
plans and EMP Stage 2 dated 1 July 2021) and additional condition 48, i.e.
48. Vegetation clearing on Lot 9 SP 252905 cannot commence until:
a. Lot 6 has been cleared of vegetation and live soil (topsoil, subsoil and seed bank) has been transferred to the
receiving site, with the receiving site stage 1 weed control, planting and irrigation installation completed (as detailed
within section 2. Site Treatment and Transfer Methods pg. 24 of the approved OPW18/0341.01 Environmental
Management Plan Stage 1 – Lot 6 revision 4 prepared by Gondwana Ecology Group P/L dated February 2021; and
b. Written notice has been provided to Council that Civil works on Lot 9 SP 252905 will commence within three (3)
months following the commencement of clearing unless otherwise agreed in writing by Council.
1 i.e. the Stage 1 2021 EMP.
1
Page 5
2023 Ecological Management Plan – Grasstree Court – Lot 9
In September 2021 Blue Care submitted the project (under the EPBC Act) to the Commonwealth. The
Commonwealth determined (October 2021) that “the proposed action is not a controlled action”.
1.2 Purpose of the Plan
The overall purpose of the plan is to implement the approval conditions 12-20 provided by Council (and the
State) in order to minimise impacts to ecological values, where possible. The plan (as per the approval
conditions) aims to address recognised ecological and restoration principles.
The EMP is updated in 2023 due to the rehabilitation process and strategy being superseded subsequent to the
approval of both the Stage 1 EMP and Stage 2 EMP 2. Stage 1 rehabilitation works has been completed and
achieved on-maintenance in September 2022. The five year monitoring period concludes in September 2027.
The Stage 1 rehabilitation works has also incorporated the planting of trees, sufficiently accommodating the
requirements for both Stage 1 and Stage 2 tree planting 3.
The purpose of the amended (2023) EMP is to update the rehabilitation strategy associated with the
rehabilitation (receiver) site to accommodate works already completed for Stage 1 and 2, incorporate a
capping exercise to the landfill area and address the balance rehabilitation for Stage 2.
1.3 Objectives
In accordance with approval conditions the overall objectives of the plan are to:
• Manage vegetation and fauna during the clearing operations;
• Identify glossy black-cockatoo active feed trees in order to collect seeds (for future propagation);
• Identify an area offsite for rehabilitation;
• Describe the rehabilitation process and associated maintenance obligations; and
• Management of threatened flora, where necessary.
1.4 Statement
The author (Justin Watson) and co-ordinator for this management plan has been involved in the research,
ecological and consulting field for more than 30 years, including nearly 20 years in the Noosa and SEQ region.
He has a PhD in ecology, is a Certified Environmental Practitioner with the Environment Institute Australia and
New Zealand and a past committee member of the Queensland Environmental Law Association and past
councillor for Birds Australia (now Birdlife) and Birds Southern Queensland committee member. In 2008, he
was awarded an Adjunct Associate Professorship position with the Institute for Land, Water and Society
(Charles Sturt University) in recognition of his “contribution to teaching, research, scholarship and creative
work.” . His PhD, subsequent research has focussed on biodiversity, rehabilitation, understanding ecosystem
functioning and identifying a practical approach to restoring landscapes (including in the Noosa and Sunshine
Coast region). He is regularly engaged by local and State government to provide specialist/technical review of
project EIS’ and threatened species (including the Commonwealth provisions and koala management). He has
given expert evidence in the Planning and Environment Court, Land Court and the Land Tribunal and has
provided advice to the Court since 2003.
Stage 1 rehabilitation works (offset site) was initiated in April 2021 by Biodiverse Environmental following
meeting with Council (14 April 2021). The Stage 1 rehabilitation was completed (and approved by Council) in
September 2022 with the five-year maintenance period to be completed by September 2027. The Stage 1
rehabilitation works has also incorporated some milestones for Stage 2 rehabilitation.
2 Amendments necessary to rehabilitation strategy and areas due to on site conditions, weed management, Council
requirements and in order to achieve an acceptable long-term ecological outcome.
3 All tree planting requirements for Stage 1 & 2 have been completed as part of Stage 1 works. Additional tree planting is
proposed for Stage 2.
2
Page 6
2023 Ecological Management Plan – Grasstree Court – Lot 9
2. STRUCTURE AND RESPONSIBILITY OF THE MANAGEMENT PLAN
The measures to be implemented to achieve the conditions of approval and appropriate ecological outcomes
are provided in two separate attachments, as follows:
Appendix A - Vegetation and Fauna Management Plan (VFMP) – Stage 2
• Activities on subject land prior to and during clearing, including appropriate management of fauna
Appendix B – Rehabilitation Management Plan (RMP) – Stage 2
• Management of subject land and rehabilitation of the offset site
The relevant Council (i.e. 12-20), and State (i.e. DERM 1-16) approval conditions associated with ecological
matters are identified in the Table 1 and 2 respectively, with corresponding Section/Attachment provided for
reference. Note that many of the DERM conditions simply require confirmation and no specific measure/action
within the VFMP or RMP.
The acceptable implementation of the VFMP and RMP will be the responsibility of contractors engaged by
Lendlease.
Due to the nature of the Council and State approval conditions, and for completeness, some sections are
repeated in both the VFMP and the RMP.
3
Page 7
2023 Ecological Management Plan – Grasstree Court – Lot 9
Table 1. Council Ecological Conditions (LANDSCAPE & ECOLOGY) of Approval with EMP Reference
# Condition Reference
In conjunction with an application for operational works on the site, the applicant must submit an operational works
12 application for Vegetation Management for the development site. The Vegetation Management operational works
application must detail:
Identification of all active Glossy Black Cockatoo food trees within the development footprint or
12.1 VFMP Section 2
in areas likely to be impacted upon by the operation or construction of the development.
A Vegetation Clearing Offset program to be undertaken to re-establish the habitat to be cleared
from the site to a nearby location with similar soil properties. A receiving site is to be identified
12.2 RMP Sections 1-7
and maintained for a specified period (minimum 5 years) after the establishment of the receiving
site.
12.3 The Vegetation Clearing Offset program must include the details of the transfer methods to be engaged including:
12.3.1 The transfer of soil/seed bank media off the site to the designated receiving site(s), RMP Section 2
Methods of transfer including, inter alia, mastication of native vegetative matter, tile transfer of
live soil/plant matrix, peat locations and extents, sexual and vegetative methods of revegetation
12.3.2 RMP Section 2-5
of offset receiving site and other deemed pertinent matters by a person with industry experience
in the successful establishment and/or re-establishment of heathland vegetation
VFMP Section 2
12.3.3 Transfer of rare and threatened plant species (sexual and/or vegetative)
RMP Section 3
Details of pre-treatment works prior to transfer of soil/seed bank media off the site and methods
12.3.4 RMP Section 2
of transplanting.
VFMP Section 2
12.3.5 Details of seed collections times and estimated establishment procedures and times.
RMP Section 3
Details of the receiving site, including tenure, contractual details, establishment, monitoring and
12.3.6 RMP Section 4-5
maintenance details and suitability of the site for the purpose.
All information must be prepared by a person with industry experience in the successful
12.3.7 establishment and/or re-establishment of heathland vegetation. Industry and educational EMP Section 1.3
institution involvement is recommended.
12 Refer updated Conditions 12.3.7 and 12.4 in Section 1.1 re Minor Change approval. RMP Section 5
The Vegetation Management operational works application must detail the protection of
13 vegetation off site from the impacts of clearing. That is, the demarcation of the vegetation to be VFMP Section 3
retained by the use of temporary fencing or alike.
The Vegetation Management operational works application must detail the location and extent
of vegetation disturbance on Lot 9 SP 252905 and Lot 6 RP 901384 must be accurately marked
14 VFMP Section 3
on-site, including any setback requirements for bushfire mitigation purposes, for Council officers
to inspect prior to commencement of any vegetation clearing.
Vegetation must only be removed or disturbed in accordance an approved Fauna Management Plan for the
15 development must be prepared by a qualified person and submitted to Council prior to the issue of any Development
Permit for Operational Works.
The fauna management plan is to detail the methods to ensure the fauna values of the site are
managed in a way that the removal of vegetation from the site does not cause immediate harm
15.1
to fauna. The application must ensure spotter/catchers are engaged and reports are supplied to VFMP Section 4
the relevant statutory authorities. The fauna management plan is to prohibit on-site dogs or cats
during the construction process and prohibit cats or dogs during the operational use of the site.
All identified Glossy Black Food trees are to be propagated at a ratio of 8:1 from the parent tree
16 and replanted in landscaping areas on the development site and maintained for a specified VFMP Section 2
period of time (minimum 3 years).
All protected vegetation removal must be undertaken in accordance with the relevant provisions
17 of applicable legislation. Any operational works application must detail the clearing procedures VFMP Section 4-5
and address any relevant Koala clearing guidelines or regulations.
Any lighting to the development is not to impact on the ecological values of the adjacent National
Park and the southern portion of Lot 9 SP 252905, i.e. lighting must not be directed toward, and
18 light spill must be minimised to, the adjacent National Park or remnant vegetation to the south. VFMP Section 6
Details of the design response to this requirement must be submitted with the application for
operational works.
With the exception of fencing to the boundaries with adjoining residential allotments or the Sunrise Beach shops, any
19 new fencing to delineate boundary alignments must be constructed to allow for the movement of fauna. Such fencing
must:
19.1 Allow adequate clearance at ground level for local macropods VFMP Section 7
19.2 Not include any use of barbed wire or similar materials VFMP Section 7
19.3 Provide regular opportunities for passage over and through for local native fauna VFMP Section 7
Any new fencing to common boundaries with adjoining residential allotments or the Sunrise
20 Beach shops shall be of timber construction or incorporate timber koala poles of at least 200mm VFMP Section 7
diameter at maximum centres of 10 metres.
4
Page 8
2023 Ecological Management Plan – Grasstree Court – Lot 9
Table 2. DERMs Ecological Conditions of Approval and EMP Reference
# Condition Reference
Development must be wholly contained within the portion of a lot zoned for community infrastructure.
1 Building envelopes and associated infrastructure must be placed in the location as shown on the Blue Fig 2
Care Development Master Plan
2 The VMP and FMP are to be submitted to the DERM prior to the commencement of operational works
All koala habitat trees with a height of 4m or greater or a diameter of 10cm or greater at 1.3m above
the ground outside of the approved development zone, which is bound by the fire trail to the south
and west boundaries and the existing lot boundaries to the north and east, will be retained with the
Fig 2,
following exceptions;
VFMP
3 a) Koala habitat trees identified within the proposed western (southern most) detention/bio-retention
Section 3
basin site
b) Koala habitat trees identified within the proposed northern detention/bio-retention basin site
c) Koala habitat trees identified within the building areas which extend into the western conservation
buffer zone
Rehabilitation of Koala habitat is to be undertaken in accordance with the current Landscape Plan,
VMP, bushfire assessment report to be submitted to the DERM and Sunshine Coast Regional Council
prior to commencement of operational works
a) plant species assemblage, density and distribution including the understorey should resemble the
surrounding regional ecosystem
b) depending on availability, all koala habitat tree species are to be derived from local seed stock.
Alternative stock (preference given to 'native to area' species) can be used if prior approval is given by
the DERM
4 c) suitable protective measures are required to be installed around the rehabilitation areas(s) at the RMP
time of planting and remain in place until the maintenance period has finished.
d) All vegetation must be completed within one (1) year of the date an operational works approvals is
issued by Sunshine Coast Regional Council.
e) Maintenance of all completed revegetation is to be undertaken by the applicant over a period of two
(2) years, commencing from the date revegetation is completed. Maintenance actions are to address
the following: stabilisation of soil structure, replacement of dead or diseased tree plantings, regular
watering taking into consideration current water restrictions, removal and management of noxious
plant and environmental weed species.
VFMP
5 Clearing and construction on subject site must be limited to the hours between 6am and 6pm
Section 4
During construction, the driving and parking of vehicles as well as stockpiling of soil and other VFMP
6
materials, must be carried out away from the root zone of trees to be retained Section 4
The applicant shall ensure that all employees, contractors, subcontractors, agents or any other person
engaged or employed to carry out building works under this development permit comply at all times
7
with the requirements of this development permit and do not clear any vegetation that is not approved
to be cleared under this development permit or in a manner that is inconsistent with it.
The applicant shall notify the DERM customer service centre on phone or email at least 5 business days
VFMP
8 prior to commencement of any clearing of koala habitat trees on the subject site of the date clearing is
Section 4
to commence and the koala spotter to be used.
VFMP
9 Domestic dogs are not permitted on the site during construction
Section 4
VFMP
10 Traffic entering the exiting the site should be kept to a minimum between the hours of 6pm and 6am
Section 4
Signage depicting a koala and a maximum speed limit of 30km/h should be erected at the entrance to VFMP
11
the site to inform visitors that koalas may be present on the site. Section 4
The fence to be erected along the western boundary of the conservation buffer zone is to be built with VFMP
12
the intentions of the proposed design plan Section 7
The barrier fence to be erected on the eastern boundary (along Ben Lexen Drive) is to be designed as a VFMP
13
'koala exclusion' fence to prevent eastward movement of fauna Section 7
Any future fencing along the Southern and Northern boundary is to be endorsed by the DERM and VFMP
14
Sunshine Coast Regional Council prior to construction Section 7
Any landscaping to be undertaken on the subject site must consist of at least 70% Australian plants, of
15
which 50% are native to the area including koala habitat trees native to the area.
Artificial lighting on the subject site must be operated to ensure it is directed away from adjacent
VFMP
16 native vegetation and minimises impacts to koalas and other wildlife inhabiting or moving through the
Section 6
adjacent vegetation.
5
Page 9
2023 Ecological Management Plan – Grasstree Court – Lot 9
ATTACHMENTS
Figures
• Figure 1- Subject Land
• Figure 2 – Approved Staged Development
• Figure 3 – Staged Clearing Plan
Appendices
• Appendix A - Vegetation and Fauna Management Plan – Stage 2
• Appendix B - Rehabilitation Management Plan – Stage 2
6
Page 10
2023 Ecological Management Plan – Grasstree Court – Lot 9
Lot 6
Lot 9
Figure 1- Subject Land (Lot 9 identified by white dashed outline). Source: Aerial Nearmap November 2022.
7
Page 11
2023 Ecological Management Plan – Grasstree Court – Lot 9
Figure 2 – Approved Staged Development
8
Page 12
2023 Ecological Management Plan — Grasstree Court — Lot 9 CLEARING STAGE 1B: \Clearing of Lot 6 (approx 0.8Ha) (Cleared material to be relocated to the first stage of the rehabilita- tion site as per EMP. INOTE: |The extents of clearing shown here lare indicative only. All trees nomin- lated for retention to be retained as per EMP and OPW approvals Pt CLEARING STAGE 1A: \Clearing along Grasstree Crt Verges to en: lable installation of trunk services and foot- ipaths. Minor Clearing within Lot 6 and Lot 9 to es- tablish 2 x Transformer sites to enable Energex upgrade works \Cleared Material to be disposed off site or temproaty stabilsittion, reused in he: landscape areas, or removed off site FOR APPROVAL Sewez wnoaeraea] BLUE CARE SUNRISE BEACH (OVERALL WORKS NOT FOR CONSTRUCTION e Cc — Veeveis| RETIREMENT LIVING & PLAN Lpernae owe ogee @ BlueCare’ i 2 anna ae Live life your way, Poccensniemrnmeneony 148-901942 1000-SK100 Figure 3 — Staged Clearing Plan
Page 13
2023 Ecological Management Plan – Grasstree Court – Lot 9
Appendix A
Vegetation and Fauna Management Plan – Stage 2
10
Page 14
2023 Ecological Management Plan – Grasstree Court – Lot 9
VEGETATION AND FAUNA MANAGEMENT PLAN – Stage 2
Prepared for Blue Care
Grasstree Court, Sunrise Beach, Qld, 4567
Lot 9 RP 252905
1. INTRODUCTION
The overall objects of the vegetation management and fauna management plan (VMFP) is to ensure:
• inadvertent vegetation clearing (i.e. protection of vegetation identified for retention) is avoided;
• appropriate instruction/direction regarding vegetation clearing;
• there is no injury to fauna during clearing operations; and
• direction/recommendations for lighting and fencing design that accommodates fauna.
2. GLOSSY BLACK-COCKATOO TREES
2.1 Active Feed Tree Identification
Over several days in October/November 2018 active feed trees (Allocasuarina littoralis) were identified by the
evidence of orts (i.e. chewed she-oak cones).
IMPORTANT NOTE - a conservative approach was taken by identifying a “feed tree” even if only a few (i.e. <5 orts were located).
These trees are highly likely not used for actual feeding and would be considered “test” or “sample” trees. Nevertheless, these
were included for completeness. Feed trees were categorised (level of use based on fresh and number of orts) as low (<20), mid
(20-50) and high (>50). Trees were flagged on site and surveyed by Downes Group.
Subsequent surveys in 2019 and 2020 confirmed that several of the “feed” trees are no longer used.
Comprehensive surveys in January 2021 across Lot 6, Lot 9 and the surrounding land confirmed the use of the trees is significantly
less than in 2018 and no feeding activity was recorded at many of the “original trees”.
A total of 71 trees were identified in 2018 either within or immediately adjacent to the subject land (refer Figure A1 –
GBC Tree Location). These trees are NOT all active feed trees and in 2021 many show little use – refer note above.
Glossy black-cockatoo trees and activity on site and in the locality were discussed with Bob Carey (Noosa Resident),
Gabriel Conroy (University of Sunshine Coast) and Council officers.
The development approval conditions do not require any Glossy black-cockatoo trees to be retained on the subject
land. However, following the detailed tree survey, discussions with Council and community, investigation into the
potential for tree retention was considered. The design for Lot 6 has been amended, to accommodate feed trees. Of
those surveyed, 13 (11 on subject land) feed trees will be retained. Several feed trees (confirmed in 2021) that occur
in areas surrounding the subject land will be retained. The retention of these trees (and associated landscaping) has
been considered as part of the bushfire management strategy.
2.2 Seed Collection and Propagation
In 2018 a total of 71 she-oak trees that had some evidence of feed activity are known to occur on the site and
surrounds. Trees to be removed are to be offset at a ratio of 8:1 by seed collection and subsequent replanting/re-
establishment. The planted trees are to be maintained for a period of three years.
Allocasuarina littoralis cones were collected from the site on 22nd November 2018. Seed predominantly from the feed
trees 36, 63, 68, 62, 57 and 68 were obtained by specialists from Arborcare Queensland and Florabunda Nursery.
11
Page 15
2023 Ecological Management Plan – Grasstree Court – Lot 9
Once collected, the cones were taken to Florabunda Nursery and managed for future propagation. The process
generally includes, placing cones in warm dry location for valves to open and release the seed. Once seed is released,
they are stored below 3oC 4 until germination of seeds are required.
Germination of seed will be staggered over time to ensure trees are available for planting in the various locations as
proposed and approved by Council, including the landscaped/retained areas within and immediately adjacent to the
subject land, the proposed rehabilitation/offset site and within local parks and open space areas.
In late 2020, approximately 800 tubestock have been grown on, with more than 100 larger pots ready for planting in
early 2021 (e.g. for Stage 1 rehabilitation).
In September 2022 some 670 grown-on feed trees had been planted on the rehabilitation site.
2.2 Threatened Flora
As part of the State requirements for “threatened flora”, a report was prepared (for Lot 6 and Lot 9) in accordance
with the Flora Survey Guidelines – Protected Plants (DEHP 2016) 5 under the Nature Conservation Act (NC) 1992.
The original report was submitted to the State on 22 November 2018 for an activity that is:
• Exempt under Section 261ZA – i.e. no EVNT plant species found to occur on site; and
• With regard to the DEHP (2015) Operational Policy - Wildlife Management - When a protected plant in
Queensland is considered to be “in the wild”
The State has approved/acknowledged the report (reference APP0030284) with the following provision:
Clearing of a protected plant under this section must be conducted within two years after the flora survey report was
submitted to the Department of Environment and Science.
Further threatened flora surveys have been completed for Lot 9 (January 2021). As no threatened plants were located
within the clearing area and in accordance with the State Guidelines, a protected plant clearing permit is not required
from DEHP. Submission of the survey report to DEHP is taken to be notification to the Department. The 2nd report
(notification) was submitted to the State in April 2021.
In summary, target threatened flora surveys have been completed in November 2018 by Queensland recognised
botanists and “suitably qualified persons” Dr Stephen Catchpoole and Dr Ann Moran. Additional field surveys
(September, October, November 2018) were completed by “suitably qualified persons” Dr Justin Watson. Further
detailed/targeted surveys were completed over Lot 9 in December and January 2021 by Dr Watson, Liam Pratt and
Lachlan Simpson.
The State has approved/acknowledged the report (reference APP0077353). For clearing related to this flora survey
report to be exempt (i.e. avoid a further survey) the clearing must be completed within 3 years after the relevant flora
survey was conducted, i.e. by January 2024.
No threatened species were located within or immediately adjacent to the subject land. One specimen of the
Macarthuria complanata and several specimens of the Blandfordia grandiflora (Christmas bells) were recorded within
Noosa National Park (Lot 147 NPW889). The subject land and area to be cleared does not support suitable habitat for
these species. Despite no further actions required, protective fencing (to avoid inadvertent clearing of threatened
species and vegetation to be retained) is recommended in the State Flora reporting and to be part of the
recognised/best practice measures to be implemented as part of this document.
4 Storing seeds at this temperature maintains viability up to 12 months.
5 DEHP (2020) Flora Survey Guidelines – Protected Plants. Version 2.01. Wildlife and Threatened Species, Department of
Environment & Science.
12
Page 16
2023 Ecological Management Plan – Grasstree Court – Lot 9
3. VEGETATION PROTECTION
The following vegetation protection works will be implemented for this project prior to any earthworks/clearing
activities.
• Survey accurate identification of areas to be cleared vs areas to be retained;
• Survey accurate the identification of areas for bushfire setback/buffer and property boundaries;
• Installation of high visibility temporary fencing along the boundary of the subject land (property boundary)
with “NO GO” or similar signage;
• Installation of temporary fencing (e.g. star picket/hazard tape) along the bushfire buffer 6;
• Protective fencing to incorporate tree protection measures (TPZ) in accordance with Australian Standards for
Tree Protection;
• Glossy Black-cockatoo trees identified for retention to be clearly marked and individually protected, if
necessary (e.g. close to clearing area); and
• Fauna access/escape passage is to be provided at strategic locations along the fencing (i.e. to allow fauna to
move into retained bushland during the clearing process).
Vegetation protection fencing to be inspected by Council prior to any site clearing works.
Tree protection measures to be in accordance with AS4970: Protection of Trees on Development Sites.
The location of Vegetation Protection Fencing for Lot 9 is provided in FIGURE A2.
6 Vegetation clearing in development area with standard clearing equipment. Selective clearing of vegetation in bushfire buffer
manually or with light machinery.
13
Page 17
2023 Ecological Management Plan – Grasstree Court – Lot 9
4. FAUNA MANAGEMENT
4.1 Pre-clearing
A qualified fauna-spotter (holding an appropriate State-approved rehabilitation permit) is to be appointed before
commencement of clearing. Pre-clearing fauna management measures are to include the following, as a minimum:
• Inspection of habitat on site within areas to be cleared.
• Identification of habitat trees (i.e. trees that have the potential to harbour fauna).
• Protective fencing installed to identify protected and clearing areas.
• Tree protection fencing must provide for the evacuation of fauna to retained habitat. Any gaps between
fencing panels must not exceed 1m.
• Fauna spotter to be cognisant of koalas in the landscape and koala management measures in accordance
with State guidelines.
• Fauna-spotter to attend pre-start meeting.
• Signage warning of fauna presence and speed limits (30km/hr) to be installed.
DERM customer service centre is to be notified (phone or email) at least five business days prior to commencement of
any clearing of koala habitat trees on the subject site of the date clearing is to commence and the koala spotter to be
used.
As an additional measure 7, it is also proposed to undertake pre-clearing surveys/fauna to allow for relocation of small
mammals, such as bushrats, melomys, antechinus, bandicoots, etc. if they occur. The exercise would incorporate a
three-night trapping program incorporating Elliott traps (small and large) and cage traps (or otherwise deemed
appropriate by a suitably qualified ecologist). Any trapped animals will be relocated further south, i.e. in the same
vegetation community, but well to the south of the site. The trapping would be undertaken by an ecologist with
appropriate experience and recognised State permits for this activity. The trapping/relocation exercise would occur
within a week prior to clearing.
4.2 Clearing & Construction
The fauna-spotter is to be on site during clearing of all vegetation. Fauna management measures during clearing are
to include the following, as a minimum:
• Directional clearing is to occur, i.e. clear from development area towards “conservation” areas (i.e. to the
south and west for Lot 9) (refer Section 5).
• Habitat features to be checked for fauna prior to clearing.
• Habitat features such as hollow-bearing branches/logs are to be salvaged and re-located within the buffer
area.
• Ongoing liaison with Civil Contractor and clearing contractors regarding fauna and vegetation clearing
methods.
• Throughout clearing, the fauna-spotter is to capture, and release fauna as required.
• In the event of an injury to fauna, the fauna-spotter is to deal with the animal appropriately and/or have
treated at local veterinary surgery or registered wildlife carer, as necessary (note below details).
• No domestic pets (including dogs, cats) allowed on the site during construction.
The Eumundi Wildlife Centre is the nearest wildlife rehabilitation facility (1411 Eumundi-Noosa Road, Eumundi – tel.
5442 8057) and the nearest vet is the Sunshine Beach Vet (46 Duke Street, Sunshine Beach – tel. 5447 4569).
4.3 Habitat Creation
While not a condition of approval, following discussions with Council, it is proposed to install a permanent water
feature within the landscaping area/s of the Lot 9 development. This may take the form of birdbaths/ponds or similar
structures that are incorporated into the landscaping features creating a permanent source of water.
7 Not a requirement of State/Council approval conditions or approved EMP, but recommended as a best practice exercise.
14
Page 18
2023 Ecological Management Plan – Grasstree Court – Lot 9
5. VEGETATION CLEARING
Following implementation of necessary fencing and other pre-clearing requirements (including Council
acknowledgement) the clearing exercise can commence.
5.1 Development Area - Lot 9 - Clearing Methodology
The clearing methodology for the development (built) area to be generally as follows:
• Implement fauna spotter and habitat protection/identification measures as described above.
• Once the trees within the area have been given the “all clear” from the fauna spotter catcher, the trees will
be pushed over using controlled felling techniques with a hydraulic excavator.
• Fauna spotter catcher will be present for all clearing works.
• The vegetation will then be placed in a windrow with a north/south alignment as it is being pulled down. This
will be repeated until all the vegetation required to be removed to facilitate the development has been
knocked over and piled into windrows. Once all the vegetation has been knocked down, another excavator
will be used to downsize the material ready to be mulched, where necessary.
• A grinder will then be used to process the material into stockpiles throughout the site.
• Stockpiles (mulch or soil) where necessary, are to only be placed within development area (i.e. not beyond
property boundary or within bushfire buffer areas).
• Any large trees/logs will be appropriately cut and relocated to the rehabilitation site to create habitat/refuge
resources 8.
Clearing and construction is to be limited to the hours of 6am and 6pm.
5.2 Bushfire Buffer Areas
Following clearing of development area, an inspection of the bushfire buffer area by the ecologist and bushfire
consultant will occur in order to nominate trees/vegetation for retention.
Tree retention in this area is not mandatory (i.e. not a condition of approval), but desirable where practical for
ecological and landscape purposes but must not generate a bushfire risk. Trees for possible retention include Glossy
black-cockatoo feed trees (Allocasuarina), koala feed trees (i.e. eucalypt and allied species), grass trees
(Xanthorrhoea) and other suitable landscape or habitat specimens (e.g. mature banksias). The retention of specific
(agreed) feed trees has been considered as part of the bushfire management strategy.
Understorey/small trees for the buffer areas are to be cleared by hand (or light equipment) as per the bushfire
management plan/requirements (refer Meridian Urban, 2018).
Note: This area is identified for bushfire management which needs to take precedence over landscaping and ecology.
5.3 Clearing Direction
For Lot 9 - clearing to start from Grasstree Court and progress in a south/south-westerly direction.
A Clearing Direction Plan is provided in FIGURE A2.
8 Not a requirement of the approval conditions. Trees to be relocated where possible – noting the project site has limited tree
canopy material.
15
Page 19
2023 Ecological Management Plan – Grasstree Court – Lot 9
6. LIGHTING
The lighting design (refer Rixon Design, 2018) will accommodate the site context defined by the site plan, nature of
the site and surrounds and the approval conditions. This includes that lighting must not be directed toward, and light
spill must be minimised to, the adjacent National Park or remnant vegetation to the south.
As per the Rixon Design approach “the context for this site is the prime form giver to the design approach to lighting.
This is not a central city environment with high ambient lighting levels. Deliberate and well researched lighting
solutions will be used to meet the needs of the site operational requirements while at the same time take into
account the natural context of the site”.
The key standard which will be followed will be current requirements of AS/NZS 4282 – Control of the Effects of
Obtrusive Light.
This Standard sets out guidelines for the control of the obtrusive effects of outdoor lighting. It includes recommended
limits for the relevant lighting parameters to control these effects. This standard will be used to ensure potentially
adverse effects of outdoor lighting on nearby residents, fauna and users of adjacent roads.
Any external lighting will have shields/deflectors to avoid light fall into the surrounding bushland as required. The
nature of the fittings used will be based on a low glare design” and “no spotlighting will be directed towards the
National Park or remnant vegetation in the south.
7. FENCING
As per the conditions of approval (Council and DERM), any new boundary fencing (other than in the east, i.e. adjacent
to the existing shopping centre and between existing residential area) is to be fauna friendly. This fencing design
would allow fauna movement within the bushfire buffer areas.
A detailed fencing design would be provided at a future stage of building works and is to ensure the following
recognised/standard design guidelines or similar:
• A 30-50cm gap between ground level and the first rail or strand.
• Not include any use of barbed wire or similar materials.
• Provide regular opportunities (gaps) for passage over and through for local native fauna.
For any new fencing to common boundaries with adjoining residential allotments or the shopping centre either be:
• Of timber construction; or
• Incorporate timber koala poles (of at least 200mm diameter) at generally 10m intervals.
A Fencing Plan is provided in FIGURE A2.
16
Page 20
2023 Ecological Management Plan – Grasstree Court – Lot 9
8. COMMUNITY CONSULTATION
Separately to the State and Council conditions of approval a community consultation strategy has been developed.
Communications with the community and interested parties is proposed to be an ongoing activity.
Blue Care/Lendlease have been liaising cooperatively with local community groups and will continue to do so as the
project progresses. Blue Care/ Lendlease is committed to engaging with the surrounding community and will continue
to identify and build on relationships with key stakeholder groups. Our interaction with the local community will
continue via letter box drops, information sessions and one on one/small group discussions in the new year, using our
dedicated phone number and project email address to facilitate communication with community groups.
Blue Care/Lendlease will be proactive in our approach and will communicate with residents, schools and local
businesses regarding project developments. In particular, they will undertake the offset works per the DA conditions
and look to expand on this by taking on additional commitments where possible.
A site-based Community Engagement Officer has been employed (December 2022) by Lendlease.
17
Page 21
2023 Ecological Management Plan – Grasstree Court – Lot 9
FIGURES
• A1 - Downes Group: She-oak trees with some evidence of Glossy Black-Cockatoo use
• A2-A – Lot 9 Clearing Works Plan
• A2-B – Lot 9 Site Setup and Fencing Plan
18
Page 22
IMPORTANT WARNING NOTES
* The Glossy Black Cockatoo Trees were located by VRS- RTK GNSS in GDA94 (zone 56) coordinates.
The GPS receiver was on an extended pole to get signals where the tree canopy allowed.
From these points, compass and tape observations were made to the trees.
Using this approach the accuracy of location of the GBC trees should be generally better than 0.5m
The locations of these trees in this plot have been derived by transforming
the GDA 94 coordinates to the local site datum.
* Feeding preference based on level of use relative to the number of orts on the ground at time of
survey (October 2018).
* High use denotes obvious and active use of tree; while Mid and Low use denotes occasional and
infrequent use only (noting in some cases <5 orts recorded beneath tree. z
* This plot is provided for verification of survey data only and should not be used for any other purpose. N
* These notes are an integral part of the subject plan. 7
* This plan is not an identification plan. The subject property boundaries as shown on the plan face are
vide survey identification plan 1S278526.
* In particular, no reliance should be placed on the information provided on this plot for any financial dealings
involving the land.
* Downes Group take no responsibility for historical data from others. 7 17 4 |
a 16 15
8)
Oe
RPG01384 | 8
=
Sj
RP890947
20 RP901384
7 a
“~ EmtC*
a RP890947 nh
§ q a |
RP890947
tB
SP252905
64,2Re 44
N \
65
SP252905 6e 56 71
@., «eA
4 45
67 47
770
* 9 OI.
St \ 68 “BOs, 764
49 » SP252905
147 v \ 769 767
NPWE89 4° MCH805762
95 766
en 69 MCHE05764
\ |
\ 765
LEGE \ MCH805764
|
(Glossy Black Cockatoo Trees feeding preference) Wo —
48 \ 764
g Low Use (< 20 Orts) a LY) cH605764
70 po
Mid Use (20-50 Orts) \ / 763
+) High Use (> 50 Orts) SP239726 MCHB05764
BAL 29 . - .
ON As per planning approval (Plan #13293B—OLD) Low I Seale 1: 1500 I Lengths are in Metres. I I |
BAL !9 20 0 20 40 60 80 100 120 140 160 180 200 220
As per planning approval (Plan #13293B—OLD)
. Contour Interval Local Authority —
Blue Care Sunrise Beach - NOOS A. SHIRE COUNCIL
g ro Uu p Level Datum Li ity -
Project — ocality
roe’ FIGURE Al AHD (derived) SUNSHINE BEACH
OWT) CS Horizontal Datum /Meridian Scale (A3) Surveyor | Drafted
GLOSSY BLACK COCKATOO TREES 1S278526 1:1500 \ cc BJ
Surveyors - Planners - over Lot 6 on RP90/384 & Horizontal Co Ordinate System | Date Surveyed Date Drafted
Development Consultants Lot 9 on SP252905 ARBITRARY 30/10/2018 | 14/11/2018
Sunshine Coast * Toowoomba * Western Downs Ben Lexcen Drive, Sunshine Beach ‘evel Origin “Pproved. S.Passlow
www.downes.com.au A.C.N. 010 841 639 OPM 103925 9 -__—_— SosseneseeTeteeettecereseses
RL 32.727m ""*° 780931.D03(A)
Page 23
.|.
LEGEND
.|.
.|. .|.
.|. .|.
EXISTING FEATURES
39.203
30
20
10
EXISTING KERB AND CHANNEL
EXISTING CONCRETE INVERT
5 EXISTING SEWERMAIN
RP890947 EXISTING SEWER RISING MAIN
EXISTING TELECOMMUNICATION
EXISTING UNDERGROUND ELECTRICAL
PRIMARY SITE ACCESS
C O U R T EXISTING WATERMAIN
EXISTING STORMWATER
.|. .|. .|. .|. 9003
EXISTING TREE TO BE RETAINED, PROVIDE
.|. .|. .|. .|. .|.
E AN OFFSET OF 12x TRUNK DIAMETER FOR
S S T R E PROTECTION BUFFER, REFER ECOLOGIST
G R A 37
REPORT FOR FURTHER DETAILS
.|.
.|. PMT SITE
.|.
.|.
/ 9000
/ PROPOSED WORKS
PROPOSED LIMIT OF WORKS
/
/
PROPOSED NO GO FENCING
/ /
/
/ CONSTRUCTION FENCING (Min 1.8m high ATF)
/
SITE ACCESS AND COMPOUND PROPOSED AREA OF CLEARING AND GRUBBING
/
PROPOSED AREA OF GRUBBING ONLY
/
/
MULCHING/STRIPPING NOTES:
E 1. ALL CLEARING, MULCHING AND SITE STRIPPING TO BE
/
TH COMPLETED IN ACCORDANCE WITH ECOLOGIST MANAGEMENT
M
RO SECONDARY SITE ACCESS. PLAN PREPARED BY GONDWANA ECOLOGY GROUP (SECTION 2)
TF
OU A ENSURE FIRE TRAIL GATE 2. CLEARING, MULCHING AND STRIPPING PROCESS TO BE CARRIED
/
ED N
RI R I N IS NOT IMPEDED AT ANY TIME OUT AS FOLLOWS
AR RNE TIO
/
C C A. CLEARING TO BE CARRIED OUT FROM THE NORTH
BE CO IRE EASTERN CORNER OF THE SITE IN A SOUTH WEST
TO ERN LY D
/
NG T R DIRECTION (AS INDICATED)
RI AS TE B. CLEARED MATERIALS TO BE MULCHED AND PLACED IN
L EA TH-E ES E 2)
C R H-W OT
/
WINDROWS ON SITE
NO UT R N C. TOP 150mm (APPROX) OF TOP SOIL TO BE STRIPPED AND
SO EFE
(R PLACED IN STOCKPILE
/
D. 150mm SUBGRADE TO BE STRIPPED AND EXPORTED TO
770 OFFSET SITE
MIN 2 ha TO BE EXPORTED TO REHAB SITE MCH805764 E. MULCH/TOPSOIL TO BE EXPORTED OFF SITE TO THE
/
/
(SOIL AND MULCH) NOMINATED RECEIVAL SITE AT THE DIRECTION OF THE
ECOLOGIST
/
51
WEED NOTE:
CONTRACTOR TO PROVIDE COUNCIL WITH A WEED MANAGEMENT
/
PROGRAM TO ENSURE THERE ARE NO ONGOING, LONG-TERM WEED ISSUES
49 BALANCE AREA TO BE CLEARED AND POST CLEARING. THE MANAGEMENT PROGRAM SHALL INCLUDE
MULCH SPREAD OVER ALL DISTURBED AREAS ALLOWANCE FOR FREQUENT MONITORING/INSPECTIONS AND A
/
RECTIFICATION ACTION PLAN IN THE EVENT OF A WEED OUTBREAK.
/
/
SEDIMENT BASIN INDICATIVE ONLY
REFER ESCP FOR DETAILS
/
/
/
/
4m WIDE "EARLY" CLEARING STRIP AROUND
BOUNDARY TO ALLOW FOR FENCE
INSTALLATION
/
FIGURE A2A
/
48
/
/
/
/ / / / / / / / / / / / / / / / / / / /
9010
9012
FILE: 4001-SK102.dwg DATE: 10-10-2022 USER: WESLEY.PIKE
XREFS: X-18-001942-SURVEY, X-18-001942-4001-TREES, X-18-001942-4001-BASE, X-18-001942-3001-BASE, SU-ILA-AR-DWG B-101 REV-C
FIRST DESIGN DRAWN CHECK APPROVED DATE STATUS SCALE CLIENT PROJECT DRAWING TITLE
AMENDMENT DETAILS Calibre Professional Services Pty Ltd
ISSUE WP WP SP SP 10.10.22
PRELIMINARY LENDLEASE Level 4, Unit 401, 8 Market Lane,
Maroochydore, QLD 4558
LOT 9
A
M
E 0 5 10 15 20 25 30 35 40
Telephone 07 5314 2520
Facsimile 07 5314 2522
RETIREMENT LIVING AND CLEARING WORKS PLAN
N
D
M
APPROVED SCALE 1:500 (A1) SCALE 1:1000 (A3) AGED CARE
E BY: PROJECT No. DRAWING No. REVISION
N DISCLAIMER
T
S
SIGN: DATE: C calibregroup.com ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR PRIOR TO
CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE. 18-001942 4001-SK102 -
Page 24
.|.
LEGEND
.|.
.|. .|.
.|. .|.
EXISTING FEATURES
EXISTING KERB AND CHANNEL
EXISTING CONCRETE INVERT
5 PUMP STATION ACCESS TO
EXISTING SEWERMAIN
RP890947 BE MAINTAINED AND KEPT EXISTING SEWER RISING MAIN
UNIMPEDED AT ALL TIMES EXISTING TELECOMMUNICATION
EXISTING UNDERGROUND ELECTRICAL
PRIMARY SITE ACCESS
C O U R T EXISTING WATERMAIN
EXISTING STORMWATER
.|. .|. .|. .|. 9003
EXISTING TREE TO BE RETAINED, PROVIDE
C 48
.|. .|. .|. .|. .|.
E AN OFFSET OF 12x TRUNK DIAMETER FOR
S S T R E B PROTECTION BUFFER, REFER ECOLOGIST
G R A 37
REPORT FOR FURTHER DETAILS
A REFER TO CONSTRUCTUION METHODOLOGY
.|. DOCUMENTS
.|.
.|.
.|.
INDICATIVE LOCATION OF INTERIM SITE COMPOUND.
/ 9000
TO BE RELOCATED ONCE ULTIMATE COMPOUND
/ A "EARLY" CLEARING FOR IS ESTABLISHED
PROPOSED WORKS
ULTIMATE SITE PROPOSED LIMIT OF WORKS
/
COMPOUND LOCATION
/
PROPOSED NO GO FENCING
/ /
/
/ CONSTRUCTION FENCING (Min 1.8m high ATF)
/ PROPOSED AREA OF CLEARING AND GRUBBING
/
PROPOSED AREA OF GRUBBING ONLY
/
PROPOSED 4m WIDE EARLY CLEARING
L
/
SITE SETUP METHODOLOGY
/
1 REINSTATE ALL BOUNDARY PEGS. INSTALL LINE PEGS AT 20m
SECONDARY SITE ACCESS. INTERVALS TO SOUTHERN AND WESTERN BOUNDARIES BETWEEN
ENSURE FIRE TRAIL GATE POINTS A TO E.
/
K IS NOT IMPEDED AT ANY TIME 2 INSTALL CONSTRUCTION FENCING WITH SHADE CLOTH BETWEEN
/
POINTS A TO E.
/ D 3 INSTALL TEMPORARY FLAGGING ALONG BOUNDARY ALIGNMENT
BETWEEN POINTS A TO E.
J 4 INSTALL TPZ FENCING AROUND TREE 37
EXISTING FIRE TRAIL
5 ESTABLISH INTERIM SITE COMPOUND
/
GATE TO REMAIN
6 INSTALL TEMPORARY FLAGGING TPZ's AT TREES 48, 49 and 51
7 UNDERTAKE INTERIM CLEARING OF 4m WIDE STRIP ALONG
/
SOUTHERN AND WESTERN BOUNDARIES (BETWEEN POINTS
770 A AND E AND AROUND THE TPZ's AT TREES 48,49 and 51
MCH805764 (POINTS F, H,I)
/
/
8 INSTALL "NO GO" FENCING (ATF) BETWEEN POINTS A TO E
9 UNDERTAKE "EARLY" CLEARING AT SEDIMENT BASIN
/
51 LOCATION AND ULTIMATE COMPOUND LOCATION
I
/
49 "EARLY" CLEARING TO
ENABLE SEDIMENT
/
H BASIN CONSTRUCTION
/
SEDIMENT BASIN INDICATIVE ONLY EXISTING FIRE TRAIL
REFER ESCP FOR DETAILS
/
/
/
/
/
4m WIDE "EARLY" CLEARING STRIP AROUND
BOUNDARY TO ALLOW FOR FENCE
INSTALLATION
/
48
FIGURE A2B
/
/
/
/
/ / / / / / / / / / / / / / / / / / / /
9010
G E
F 9012
FILE: 4001-SK101.dwg DATE: 10-10-2022 USER: WESLEY.PIKE
XREFS: X-18-001942-SURVEY, X-18-001942-4001-TREES, X-18-001942-4001-BASE, X-18-001942-3001-BASE, SU-ILA-AR-DWG B-101 REV-C
FIRST DESIGN DRAWN CHECK APPROVED DATE STATUS SCALE CLIENT PROJECT DRAWING TITLE
AMENDMENT DETAILS Calibre Professional Services Pty Ltd
ISSUE WP WP SP SP 10.10.22
PRELIMINARY LENDLEASE Level 4, Unit 402, 8 Market Lane,
Maroochydore, QLD 4558
LOT 9 SITE SETUP
A
M
E 0 5 10 15 20 25 30 35 40
Telephone 07 5314 2520
Facsimile 07 5314 2522
RETIREMENT LIVING AND AND FENCING PLAN
N
D
M
APPROVED SCALE 1:500 (A1) SCALE 1:1000 (A3) AGED CARE
E BY: PROJECT No. DRAWING No. REVISION
N DISCLAIMER
T
S
SIGN: DATE: C calibregroup.com ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR PRIOR TO
CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE. 18-001942 4001-SK101 -
Page 25
2023 Ecological Management Plan – Grasstree Court – Lot 9
Appendix B - Rehabilitation Management Plan – Stage 2
22
Page 26
2023 Ecological Management Plan – Grasstree Court – Lot 9
REHABILITATION MANAGEMENT PLAN – Stage 2
Prepared for Blue Care
Grasstree Court, Sunrise Beach, Qld, 4567
Lot 9 SP 252905 {& Lot 6 RP 901384}
1. INTRODUCTION
The primary objective of the rehabilitation management plan (RMP) is to establish a “rehabilitation program”
(vegetation offset proposal) that provides for a good ecological outcome by re-establishing habitat elsewhere in the
nearby locality.
For the purposes of the RMP, the subject land is the site to be cleared (approved development land) while the
rehabilitation site is the receiver site (land to be rehabilitated).
The receiver (rehabilitation) has been identified within the Girraween Sports Complex and Nature Refuge located at
100 Eenie Creek Road; Noosa Heads (off Wallum Lane), formally known as Lot 1 on SP239726 (FIGURE B1 – Receiving
Site Landscape) FIGURE B1A illustrates the land at approximately 2018, while FIGURE B1B shows the site in March
2023.
Two treatment areas (T1 and T2) were identified in consultation with Council (FIGURE B2 – Receiving Site Treatment
Areas).
Stage 1 of the development encompasses some 0.8ha of clearing and available soil/seed material (associated with
Lot 6). Stage 2 includes the balance of the rehabilitation area and is associated with Lot 9. Stage 1 works was initiated
in April 2021 and completed in September 2022. While Stage 1 rehabilitation activities have been completed, the
actions are retained in this plan for completeness. Some of the original Stage 2 commitments have already been
incorporated into the Stage 1 works. This plan incorporates additional measures, beyond the original approved EMP.
2. SITE TREATMENT AND TRANSFER METHODS
2.1 Overview
Stage 1 (Lot 6 clearing and initiation of the rehabilitation exercise) is completed. As part of the Stage 2 rehabilitation
exercise, it is proposed that topsoil and subsoil containing the seed bank of the vegetation within Lot 9 will be scraped
off post clearing and mulching of all above ground vegetation. The live 9 soil will be transferred via trucks to the
receiver site. Vegetation clearing for the subject land is described in the VFMP. The receiver site has been prepared as
part of Stage 1. All vegetation on Lot 9 will be cleared and mulched prior to lifting out live topsoil and subsoil. All
works will comply with the conditions of the operational works approval and the VFMP.
2.1.1 Completion of Stage 1 Works
The completed Stage 1 Rehabilitation encompasses some 11381m2, incorporating 3326m2 of T1 dune area and
8147m2 for T2 area. Additional weed control across the balance rehabilitation area (totalling approximately 3ha) was
completed by the rehabilitation contractor (up to mid-year 2022).
9 Live soil = soil with seed material from project site.
23
Page 27
2023 Ecological Management Plan – Grasstree Court – Lot 9
Step Action
1 Clear entire offset site. Mulch, strip and stockpile all top layers and weed material.
2 Install main infrastructure e.g. haul/access roads, irrigation water line from treatment plant, water tanks.
3 Install exclusion fencing around weed area.
Provide weed treatment to entire receiver site after clearing, i.e. spray all weeds as they germinate for four
4
weeks prior to seed soil being moved to site.
5 Site soil from Lot 6 transported and installed into the southern part of the rehabilitation site (0.8ha).
6 Treatment to T1 (e.g. coir logs) and soil (0.3ha).
Plant she-oak tubes and other trees. Planting included in T1 and T2 areas and incorporates both Stage 1 and
7
Stage 2 planting targets.
8 Planting of grass trees into T2 area by Council.
9 Install monitoring points.
10 Ongoing weed management.
Practical completion for On-Maintenance Stage 1 has been achieved as follows:
Criteria Target Achieved
Fencing installed where
Installed around stage 2 area - rehabilitation area
Fencing needed – part safety
demarcated but unfenced to allow fauna movement
part fauna management
Landform stable & Landform stabilised with coir logs (T1), mulch (T2), earthen
Weeds & Erosion
generally weed free bund and erosion fencing in east
Soil translocation 0.8ha 0.5ha in T2 south, 0.3ha in north (original T2 area)*
She-oak planting 200x 670
Eucalypt (& allied)
50x 50
species planting
Glossy black-cockatoo
2x (where possible) 2 x nest boxes installed August 2021
nest boxes
Irrigation system is connected to a fixed water supply
(recycled water supplied from the nearby treatment plant)
Irrigation system To be installed
with 2 x water tanks and pump system. Necessary approvals
in place and signage “non-potable” installed.
* areas approximate.
In addition to the above, the T1 area has been rehabilitated. This rehabilitation has been brought forward (i.e.
exchanged for part T2) with some 3000m2 treated for weeds and approximately 1500m2 (open dune) stabilised with
the use of coir logs, natural vegetation material and the planting of 350 plants (as tube stock) from nine species. It is
relevant to note:
• The she-oak planting has exceeded (by >200) the requirement for the project (i.e. stage 1 and stage 2 offset
ratio target).
• The 350 native species incorporated into the T1 area is above any requirements for Stage 1 or Stage 2
planting.
2.1.2 Additional Works and Fencing
The project has successfully achieved the required planting target for both Stage 1 and Stage 2. Additional planting of
600 trees is proposed (refer Section 4.4).
Parts of the rehabilitation area for Stage 2 will be capped in accordance with the design and specification provided by
Noosa Shire Council (refer APPENDIX B1) – refer Section 4.3.
The Madeira vine area was fenced (exclusion fencing) for future treatment 10 and will remain fenced until the area is
deemed secure by the contractors (e.g. buried beneath the GCL liner) which is to be vegetated as per this EMP.
Responsibility for existing fencing on the rehab site will transfer to Blue Care/Lendlease from 1 June 2023 and will be
removed as soon as planting is complete, and all works machinery have demobilised offsite.
10 It is noted that Council have mulched the weed stockpiles in this area in September 2022. Left untreated this area remains a
weed source and risk for the successful rehabilitation of the balance land.
24
Page 28
2023 Ecological Management Plan – Grasstree Court – Lot 9
2.2 Stage 2 Works To Be Completed
Step Action
1 Balance land available for rehabilitation as identified by Council (see Figure B4).
2 Northern area to receive soil and mulch material from project site.
3 Spread bunded soil (i.e. original soil from northern part of rehabilitation site) over southern portion of site.
Southern area (associated with weed vine material) to be capped and covered with soil and mulch from project
4
site.
5 Southern area to have contour banks and batter drain.
6 Sediment fencing to be relocated to appropriate locations as necessary.
Ensure monitoring points cover all of rehabilitation site (i.e. extend into balance rehabilitation area) where
7
appropriate.
8 Weed management.
9 Supplementary planting with 300 she-oak and 300 eucalypts evenly distributed across balance land.
2.3 Soil Seed Bank Transfer
Once the site (Lot 9) is cleared and all above ground material is mulched and stockpiled, earthworks machinery will be
used to scrape the top 200-300mm of soil off the ground at the translocation site. This will be placed immediately into
a truck and driven to the receiver site.
Once transported to the receiver site, the soil is unloaded directly into balance area, and trucks return to subject site.
Earthworks machinery will spread the unloaded soil as soon as is practicable over the pre-prepared area. Soil is to be
stockpiled for the shortest amount of time possible to retain seed viability. It is acknowledged that some stockpiling is
unavoidable. Stockpiling of live soil will be dependent on how quickly it can be spread out as well as the rate of
removal from Lot 9. Subsoil and topsoil to be treated separately with topsoil placed above the subsoil.
Mulch that is stockpiled throughout Lot 9 will also be transported to the receiver site in trucks and spread over the live
soil mix or stockpiled as agreed between Council and the project. This transfer will occur simultaneously with the soil
transfer and mulch will be spread out over the receiver site as soon as is practicable to retain any viable seed within
the mulch piles.
The southern portion of the rehabilitation site is to be capped (as per the capping plan) prior to soil transfer for that
area. The GCL capped area (5000m2) is to have a confining layer with a minimum depth of 300mm in addition contour
bank material and 1.5m depth of Lot 9 ‘live soil’ above. The remaining non-GCL capped area (13000m2) is to have Lot 9
‘live soil’ depth of 300mm.
2.4 Clearing Methodology
The clearing methodology (project site) to be generally as follows:
• Implement pre-clearing surveys and fauna spotter and habitat protection/identification measures as
described in the VFMP.
• Once the trees within the area have been given the “all clear” from the fauna spotter catcher, the trees will
be pushed over using controlled felling techniques with a hydraulic excavator.
• Fauna spotter catcher will be present for all clearing works.
• The vegetation will then be placed in a windrow with a north/south alignment as it is being pulled down. This
will be repeated until all the vegetation required to be removed to facilitate the development has been
knocked over and piled into windrows. Once all the vegetation has been knocked down, another excavator
will be used to downsize the material ready to be mulched.
• A grinder will then be used to process the material into stockpiles throughout the site.
• Note specific (selective and manual) clearing within the bushfire buffer areas.
2.5 Transporting Material
Material will be transported to the receiver site via the existing roadway network. The shortest route is approximately
seven minutes on public roads, pending traffic conditions (refer FIGURE B3 – Transport Route). Transportation of
material will occur in accordance with any specific traffic management plans, however, would aim to occur outside of
peak traffic periods.
25
Page 29
2023 Ecological Management Plan – Grasstree Court – Lot 9
3. THREATENED FLORA AND SEED COLLECTION
Consideration of threatened flora and the collection of seed is described in the VFMP and summarised below.
A total of 71 glossy black-cockatoo trees that demonstrated some feed activity (note – not all active feed trees) were
known to occur on the site and surrounds (i.e. Lot 6 and Lot 9). Trees to be removed are to be offset (i.e. approval
condition) at a ratio of 8:1 by seed collection and subsequent replanting/re-establishment. The planted trees are to be
maintained for a period of three years.
Allocasuarina littoralis cones were collected from the site in November 2018 and taken to Florabunda Nursery for
storage and future propagation. This process has already been initiated. Planting of propagated material is proposed
in the various locations, including the landscaped/retained areas within and immediately adjacent to the subject land,
the proposed rehabilitation/offset site and within local parks and open space areas.
For Stage 1 a total of 670 she-oak from feed tree seed stock have been planted. The generous “replacement” proposal
of 500 trees for the project (i.e. Stage 1 and Stage 2) has been achieved 11.
As part of the State requirements for “threatened flora”, a report was prepared in accordance with the State Flora
Survey Guidelines – Protected Plants under the Nature Conservation Act 1992. No threatened plants were recorded
on the subject land.
Specimens of Macarthuria complanata and Blandfordia grandiflora (Christmas bells) were recorded adjacent to Lot 9,
within Noosa National Park (Lot 147 NPW889). The habitat for these threatened flora is different to that which occurs
on the subject land. No other rare or threatened species were located. Protective fencing (to avoid inadvertent
clearing of threatened species and vegetation to be retained) is to be implemented.
11 The approval conditions require an 8:1 replacement. 56 trees with some evidence of feed activity removed (but acknowledge not
all of these are “feed” trees and the actual feed trees removed is recognised as being well less than this figure). Target total for
compliance is conservatively no more than 448 (assuming all 56 trees are actually feed trees).
26
Page 30
2023 Ecological Management Plan – Grasstree Court – Lot 9
4. RECEIVING SITE REHABILITATION
4.1 Description and Tenure
The receiver site is located within the Girraween Sports Complex and Nature Refuge located at 100 Eenie Creek Road;
Noosa Heads (off Wallum Lane) and formally known as Lot 1 SP239726. This area is owned by Council ensuring that
the rehabilitation efforts will be preserved indefinitely and located within close proximity to the translocation site. A
formal survey in 2018 located the boundaries for the receiver site and treatment areas (FIGURE B2).
4.2 Treatment Areas
The area designated within this lot to receive the translocation treatments is approximately 3ha of degraded land
mapped as Category X (i.e. non-remnant) vegetation under Queensland state mapping.
The site consisted of a bare hillside in the southern portion (T1). The balance area comprises a weed infested area
with scattered/few emergent trees (T2).
The total area of the receiver site is approximately 3ha.
• T1 area is approximately 3000m2.
o Consists of dune hillside, bare of vegetation with sandy, low nutrient soil.
• T2 area is approximately 27000m2.
o Consists of slight slope, dominated with weedy understory and few emergent trees.
The surrounding vegetation consists of a similar regional ecosystem composition to the subject land. It is made up of a
50/50 ratio of RE12.2.5 and RE12.2.9.
Proximity to the development site, similar land zone, similar surrounding ecology, opportunities/desire 12 for
rehabilitation and long-term ecological benefit and protection justifies the suitability of the rehabilitation site.
4.3 Receiving Site Preparation and Capping
The receiver site has been prepared (in April 2021 and prior to any clearing works at the Lot 6). The receiver site is
ready prior to any clearing works on Lot 9 (Stage 2) of the project area. As at mid-2022, weed control over the balance
area has been under Council control.
The overall works involved weed removal from the surrounding buffer areas, weed removal from the T2 area, scraping
away the top layer of organic material at T2 area to expose clean soil substrate, installation of a mulch bund along the
bottom of the hillside to T2 area and placement of coir logs over T1 area to aid soil retention. Once translocated soil is
placed over entire T1 and T2 area, an irrigation watering system is to be installed.
Access has been granted from Council. Areas have been designated for equipment storage, staff parking, emergency
meeting point and emergency access are set up and signed. The TPZ of trees outside the boundary will have fenced
temporary with “NO GO” or similar signage. A secure storage/work compound has been established in the east.
The T1 area (open dune) has been stabilised with the use of coir logs (secured with stakes), natural vegetation
material and the planting of 350 plants (as tube stock) from nine species This has been completed in September 2022.
Irrigation to this area has positively assisted natural regeneration.
The T2 area has undergone extensive weed removal. An excavator was used to remove the bulk of the weedy lantana
which will be mulched on site. Native trees will be retained with minimum diameter at breast height (DBH) of 25cm.
Retained trees were managed in accordance with AS4970: Protection of Trees on Development Sites to ensure their
survival throughout the works. TPZ’s were established once the overhead height weed layer was removed and staff
could access the trees. All weed material will be mulched on site and used to create erosion control barriers around
the site where needed. The mulch will be treated for weeds via herbicide spray once laid in place. This was completed
in September 2022.
12 Note: part areas identified by Council as in need/preferred for rehabilitation.
27
Page 31
2023 Ecological Management Plan – Grasstree Court – Lot 9
The site has undergone scraping via excavator to expose bare sand /soil for the translocation material to be placed
upon and spread. All vegetative debris (waste) and topsoil layer scraped off the receiver site has been stockpiled (in
three piles in the east). This was completed by mid-2022.
Madeira vine was located on the rehabilitation site during the initial clearing for Stage 1. The weed material was
consolidated into a mound in the centre of the area for further treatment. Council undertook mulching (and
spreading) of the material in September 2022. This area is to be treated in accordance with the plans in APPENDIX B1.
With regards to the capping, “hold points” are to be verified by a Council Officer (or Contractor), noting that some
adjustment to stages and inspections may be required and agreed to suit construction sequence:
a) Confirmation that GCL has been placed as per the plans inclusive of batter drain GCL liner
b) Depth of confining layer cover over GCL
c) Depth of material above confining layer prior to planting
d) Batter drain and contour banks built to design
Council on-maintenance will be achieved subject to appropriate staged signoffs being confirmed.
Short term maintenance (5-year period in accordance with the EMP) of the rehabilitation area (including capping area)
remain the responsibility of Blue Care/Lendlease (and their contractors). The maintenance regime for the
rehabilitation works will also include the capping installation, with specific focus on monitoring and rectification of any
erosion.
The long term maintenance of the landfill (including the capping post the 5-year maintenance period) remains the
responsibility of Noosa Shire Council.
Once the initial works are completed, areas that have potentially unstable slopes will be addressed by way of erosion
control measures, including sediment fencing or coir logs (similar to those used for Stage 1 rehabilitation). This will be
determined on site and prior to on maintenance sign off.
4.4 Receiving Site Planting and Habitat Creation
Planting of canopy trees has been undertaken as part of Stage 1 works and includes trees to be planted for Stage 2.
While planting commitments have been met (to be monitored as part of Stage 1 works), additional planting is
proposed for Stage 2.
These works have been undertaken to achieve the following:
• approval conditions regarding cockatoo feed trees
• establish canopy/minimise competition with groundcover species
• recreate woodland ecosystem
• enhance koala habitat (i.e. planting of locally occurring suitable feed trees) in the locality
Planting of trees has occurred as part of Stage 1 rehabilitation and includes:
• 670 she-oak from feed tree stock – tube stock, 140mm and 200mm
• 50 eucalypt and allied species – tube stock
• 350 other native species (local top the immediate surrounds and ecosystem) – tube stock
The balance rehabilitation area currently supports native trees (originally planted by Council) and which have been
retained through the initial selective clearing process. Further planting of canopy trees (300) is to be undertaken to
establish canopy/minimise competition with groundcovers species, recreate the woodland ecosystem, and enhance
koala habitat (i.e. planting of locally occurring suitable feed trees). She-oak trees are also proposed to be planted
(300) to enhance foraging resources for the glossy black-cockatoo. This will include she-oak grown from “feed tree
seed” and a selection of eucalypt appropriate to the rehabilitation area and suitable as koala feed trees, e.g. brushbox,
forest red gum, Moreton Bay ash, pink bloodwood 13.
13 These include species already planted by Council. Where needed, additional trees can be considered at on-maintenance.
28
Page 32
2023 Ecological Management Plan – Grasstree Court – Lot 9
Planting density/arrangement will consider the location of existing/retained trees with an approximate density of 300
trees per hectare (i.e. 600 tree over 1.8ha).
Two Glossy Black-cockatoo nest boxes have been installed in large bloodwood trees as part of Stage 1 rehabilitation.
Where available 14, tree trunks are to be salvaged from the project site and placed on the rehabilitation area to create
habitat.
4.5 Irrigation and Watering
A watering system has been installed on the receiver site for Stage 1. The watering system consists of tanks installed
in the eastern part of the site (secure compound) with six irrigation lines extending through the southern and
southwestern part of the Stage 1 rehabilitation area. Recycled water is pumped into the tanks for use as irrigation.
The Stage 2 irrigation system will be extended where appropriate and as agreed between Council and the project.
Final alignment of any new infrastructure will be decided on ground based on local conditions once works have been
completed. This system will allow watering to be done on an as needed basis over the 5-year maintenance period.
The Receiving/Rehabilitation Site set-out is provided 15 in FIGURE B4.
14 Noted that the project site does not support a large tree/canopy community.
15 The Set-out figure has been updated subsequent to the approved EMPs and following discussions with Council in order to
address rehabilitation site context and conditions.
29
Page 33
2023 Ecological Management Plan – Grasstree Court – Lot 9
5. CLEARING OF LOT 9, REHABILITATION ESTABLISHMENT AND MAINTENANCE
In accordance with minor change condition 48 - vegetation clearing on Lot 9 SP 252905 cannot commence until:
a. Lot 6 has been cleared of vegetation and live soil (topsoil, subsoil and seed bank) has been transferred to the
receiving site, with the receiving site stage 1 weed control, planting and irrigation installation completed (as
detailed within section 2. Site Treatment and Transfer Methods pg. 24 of the approved OPW18/0341.01
Environmental Management Plan Stage 1 – Lot 6 revision 4 prepared by Gondwana Ecology Group P/L dated
February 2021; and
b. Written notice has been provided to Council that Civil works on Lot 9 SP 252905 will commence within three
(3) months following the commencement of clearing unless otherwise agreed in writing by Council.
Works have been completed in accordance with condition 48a.
Approval conditions require rehabilitation works to undergo a five-year maintenance period.
Stage 1 maintenance period will be completed in September 2027 (this includes original Stage 2 rehabilitation
targets).
Noting part of Stage 2 rehabilitation works has already commenced and achieved “On-Maintenance”, the balance
Stage 2 area will be considered On-Maintenance when:
• the balance area has received the bunded soil where needed;
• translocated soil and mulch (from project site) have been spread across the rehabilitation site 16; and
• the trees (600) have been planted.
The project ecologist will sign off on the works with reporting to Council (and site inspection as needed). Once the
maintenance period has started, photo monitoring points will be established for reporting purposes and operational
works approval conditions.
As time progresses, and where appropriate, Stage 1 and Stage 2 rehabilitation works will be monitored and reported
simultaneously.
Maintenance visits will occur every month for the first year. Each visit will involve recording presence or absence of
active regrowth/recruitment, photos from monitoring points, weed control requirements (including to the
surrounding buffer area), watering requirements, mulching requirements, sediment and erosion control, reporting
progress and any other items as needed.
For the balance of the maintenance period, quarterly maintenance visitation will occur (i.e. years 2-5) with recording
as per year 1.
At the end of the maintenance period it is proposed to have the area established with 90 - 95% native vegetation
cover and showing signs of returning to a self-sustaining ecosystem such as self-mulching, indications that all levels of
strata (ground, mid and canopy) are or likely to be present and fauna recruitment to the area (refer Section 6). While
this will be determined by the germination and establishment success of the soil/seed transferred, it will be
supplemented by the additional planting of she-oak and eucalypts.
16 Note – capping of the southern area of Stage 2 is to commence as soon as practical to allow soil transfer.
30
Page 34
2023 Ecological Management Plan – Grasstree Court – Lot 9
6. PERFORMANCE CRITERIA AND MONITORING
Monitoring of performance criteria is to occur annually for years 1-5. Performance criteria are based on practical
target outcomes for the rehabilitation following discussions with Council (and in accordance with the approval
condition requirements). Rehabilitation targets identified below that relate to tree species, survival, height and
density are addressed under the Stage 1 rehabilitation works and are already being monitored. The balance Stage 2
monitoring targets relate primarily to weed control (determined by the extent of soil placement over the balance
area). Overall Performance Targets to be achieved are as follows:
• Weeds (low) – dependent on treatment of weed infested areas adjacent to and surrounding the subject land
and soil treatment.
• Mulch layer generally intact/mulch stockpiles are relatively weed free.
• Establishment (natural recruitment) of native species (dependent on condition and placement of soil from
Lot 9).
• Survival of planted trees (high) – i.e. those already planted in Stage 1 works.
• Monitor erosion and stabilisation measures.
An initial report detailing the finished works and photo monitoring points will be completed once the On Maintenance
period has started (i.e. year 0).
Yearly reporting (years 1-5) will include the following:
• species list of all flora present within the treatment areas
• weed composition
• planted offset tree survival
• photos taken from the photo monitoring points
• other works (e.g. enhancement works, watering, weed control, etc.)
Specific Performance Criteria as follows:
Year One – 12 months after On Maintenance:
i. Planted trees 17 (i.e. koala feed trees) have achieved an average height of 1m.
ii. Planted shrubs/small trees (i.e. cockatoo feed trees) have achieved an average height of 0.5m.
Year Two/Three/Four – 24-72 months after On Maintenance:
i. Planted trees (i.e. koala feed trees) have achieved an average height of 2m.
i. Planted shrubs/small trees (i.e. cockatoo feed trees) have achieved an average height of 1m.
Year Five – 60 months - Final Off Maintenance:
i. Planted trees (i.e. koala feed trees) have achieved an average height of 3m.
ii. Planted shrubs/small trees (i.e. cockatoo feed trees) have achieved an average height of 2m.
iii. Plant density shading out and/or self-mulching (i.e. for plantings completed within Stage 1 works).
The duration of the on-maintenance period:
i. Adherence to maintenance regime for rehabilitation areas.
ii. No evidence of woody weeds reshooting from stumps, poisoned trees or the regrowth of cut stumps.
iii. No evidence of over-weeding or impact on non-target species.
iv. Signs of indigenous recruitment in rehabilitation areas.
v. Weed infestations less than 5% of the rehabilitation areas.
vi. Any failed plants within the previous 12 month period have been replaced.
vii. Healthy and vigorous growth allowed to grow to full form.
viii. Mulch layer sufficient to suppress weeds.
Ongoing liaison between contractors, project ecologist and Council is encouraged.
Reporting to Council for compliance with rehabilitation objectives is to be the responsibility of project ecologist. An
example monitoring sheet is provided as APPENDIX B2 (Monitoring Sheet - Rehabilitation).
17 The additional 600 trees.
31
Page 35
2023 Ecological Management Plan – Grasstree Court – Lot 9
ATTACHMENTS
• Figure B1 – Receiving Site Landscape (A – 2018 aerial and B – 2023 aerial)
• Figure B2 – Receiving Site Treatment Areas (original survey 2018)
• Figure B3 – Transport Route
• Figure B4 – Receiving Site Set-out
• Appendix B1 – Capping Specifications
• Appendix B2 - Monitoring Sheet – Rehabilitation
32
Page 36
2023 Ecological Management Plan – Grasstree Court – Lot 9
Rehabilitation
Area
FIGURE B1A – Receiving/Rehabilitation Site Locality 2018
Rehabilitation Area (red dashed line approximate only) - Source: QLD Globe 2018
33
Page 37
2023 Ecological Management Plan – Grasstree Court – Lot 9
FIGURE B1B – Receiving/Rehabilitation Site 2023
Rehabilitation Area (red dashed line approximate only) - Source: Nearmap Aerial March 2023
34
Page 38
gths are in Metres. 0 20 30 40 50 60 70 80 90 100 0 120 6130 140 Client — Contour Interval Local Authority — group Lend Lease - NOOSA SHIRE COUNCIL _ Level Datum Locality — roast FIGURE B2 NOOSA HEADS OWTN)CGS || sunrise Beach RL & AC Project [Harzorta!Datum/Werdion —|Scae(a3) | Surveyor] brafea 5 PI MGA 1:1000_| HG BJ urveyors - anners - . cep pe Horizontal Co Ordinate System | Date Surveyed Date Drafted Development Consultants Staking for rehabilitation areas T/ & 72 21/11/2018 | 26/11/2018 in part of Lot | on SP239726 Level Origin Sunshine Coast * Toowoomba * Western Downs www.downes.com.au A.C.N. 010 841 639 OPM 138558 RL 15.009m
Page 39
2023 Ecological Management Plan – Grasstree Court – Lot 9
Lot 9
Rehabilitation
Area
FIGURE B3 – Public Road - Transport Route (shaded blue)
Subject Land (Lot 9 Development Site) to Rehabilitation (Receiver) Site (red hatching)
36
Page 40
ACCESS
LEGEND
STAGE 1 REHABILITATION AREA
1.12 ha (COMPLETED 2022)
STAGE 2 REHABILITATION AREA
1.81 ha
CONSTRUCTION FENCE
GCL AREA (5000m²)
LOCATE FENCE ON WESTERN PROPOSED CONTOUR BANKS
SIDE OF ACCESS TRACK
LOCATE FENCE AGAINST PROPOSED BATTER DRAINAGE
EXISTING TREELINE AREA
(NO DAMAGE TO
EXISTING VEGETATION)
EXISTING COMPOUND NOTES
1
i. COVER COVER
GCL AREAGCL AREAWITH
(5000m²) (5000m²) WITHOF
1500mm 1500mm OF LOT
LOT 9 SOIL 9
WITH
MULCH ON TOP.SOIL WITH MULCH ON TOP.
ii. 2BALANCE REMAINING
(13000m²) OF13,000m² OF STAGE
THE 1.8ha THE 1.8ha STAGEAREA
2 REHAB 2 IS TO
STAGE 2 HAVE 300mmREHABOF LOT 9 SOIL
AREA WITH
IS TO MULCH
HAVE ONOF
300mm TOP.
LOT 9 SEED,
REHABILITATION iii. PLANTINGSOIL
OF 300
ANDSHEOAKS
MULCH ON & 300
TOP.EUCALYPTS (AVG. DENSITY
AREA APPROX.
3 300 TREES/HA
PLANTING OF- ACCOMMODATE
300 SHEOAKS AND PLANTING EXISTING
300 EUCALYPTS.
TREES).
4 GROUND HABITAT FROM LOT 9 (EG LOGS ) TO BE
1.8ha APPROX iv. GROUNDDISTRIBUTED
HABITAT FROM LOT 9 (EG. LOGS
THROUGHOUT THE )1.8ha
TO BE
AREA.
LOCATE FENCE ON WESTERN DISTRIBUTED THROUGHOUT STAGE 2 REHAB AREA.
SIDE OF ACCESS TRACK v. FOLLOWING SOIL AND MULCH PLACEMENT, STABILISE STEEP
AREAS WITHIN STAGE 2 REHAB AREA WHERE NECESSARY (EG.
USE OF COIR LOGS).
#REFER DETAILED NOTES IN EMP
LOCATE FENCE 1m INTO STAGE 1
AREA. NO DAMAGE TO EXISTING
VEGETATION
STAGE 1
REHABILITATION
AREA
(completed)
FIGURE B4
Receiving Site Set-out
FILE: 4001-SK100.dwg DATE: 18-03-2019 USER: WESLEY.PIKE
XREFS: Rehabilitation Plan
FIRST DESIGN DRAWN CHECK APPROVED DATE STATUS SCALE CLIENT PROJECT DRAWING TITLE
AMENDMENT DETAILS Calibre Professional Services Pty Ltd
ISSUE
A
WP
WP
WP
WP
SP
SP
SP
SP
10.10.22
06.12.22 SITE BOUNDARY ADDED PRELIMINARY LENDLEASE Level 4, Unit 402, 8 Market Lane,
Maroochydore, QLD 4558
LENDLEASE SUNRISE BEACH OFFSET SITE
A
M B WP WP BK BK 09.01.23 NOTES AMENDED Telephone 07 5314 2520
RETIREMENT LIVING AND REHABILITATION AREA
E
C WP WP SP SP 18.01.23 NOTES AMENDED NOT TO SCALE Facsimile 07 5314 2522
N
D
M D WP WP SP SP 27.04.23 GCL AREA ADDED.CONTOUR BANKS AND NOTES ADDED
APPROVED AGED CARE SCOPE OF WORKS
E BY: PROJECT No. DRAWING No. REVISION
N DISCLAIMER
T
S
SIGN: DATE: C calibregroup.com ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR PRIOR TO
CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE. 18-001942 4001-SK100 D
Page 41
2023 Ecological Management Plan – Grasstree Court – Lot 9
APPENDIX B1 – CAPPING SPECIFICATIONS
38
Page 42
16
19
27
20
17
14
EA 15
SE
ME
NT
22
(TY
P)
16
14
24 14
17
16
BELLAS & REITANO
17
29
14
15
23
AR
14 CONSULTING ENGINEERS & PROJECT MANAGERS
EA
16 Lizanne Street Boondall
PO Box 338 Taigum QLD 4018
BO Phone (07) 3265 2866
28 U
N Email [email protected]
30
D
3321 29
AR
26
34
Y
21
33
30
34
16
NOTE:
CONTOURS ARE HISTORICAL & DO
NOT REFLECT THE CURRENT SURFACE
35
LEVELS.
19
1
25
17
34
31
27
18
20
13
SP239726
35
15
__________________ RPEQ 3102
36
Vince Reitano Date: 20/03/23
32 15 CONSULTING ENGINEER'S SIGNATURE
33
22
28
14
29
23
24
GIRRAWEEN E
D
13
15
OLD LANDFILL
15
33
15 C GENERAL AMENDMENTS 20.03.23
30 B FOR APPROVAL 13.03.23
A FOR REVIEW ONLY 23.02.23
28
16
35 34
No REVISION DATE
23
31
29 31 33
19
17
27 30 3 2 20 181 CLIENT: NOOSA SHIRE COUNCIL
15
25 9
26
24
34
26 21
21 25 ADDRESS:
20 27
14
34
18 LAKEVIEW RISE
16
15
29
13
NOOSA HEADS
31
1615
Y
22
AR
17
D PROJECT:
13
U N
15
RECAPPING OF DISUSED
BO
22
EA
14
35
11 GIRRAWEEN OLD LANDFILL SITE
AR
28
1
12
14
32
3
15
24 23
14
14
15
DRAWING TITLE:
13
EXISTING SITE PLAN
28
34
29
15
33
15
15
19
(HISTORICAL)
17
19 14
14
23
SCALE 1:2000 EAS DRAWN: AB
18
DATUM: -
Original drawing size: A3
SITE PLAN 1:2000
DRG No 23004-GIR-01 C
Page 43
14
EA 15
SE
ME
22 N T (T
YP
)
16
14
24 14
17
16
17
29 14
15
23
AR AREA OF MINIMAL DISTURBANCE WITH 14
EA SOME EXPOSED TREE ROOTS. ALLOW
TO TOP UP 3000m 2. ALLOW FOR AN BELLAS & REITANO
BO AVERAGE COVER DEPTH OF 200mm. CONSULTING ENGINEERS & PROJECT MANAGERS
28 U
N 16 Lizanne Street Boondall
30
D STOCKPILE
3321 29
PO Box 338 Taigum QLD 4018
34
26 AR APPROX 170m3 Phone (07) 3265 2866
Y
21
33
30
34
16
EXISTING FENCED Email [email protected]
OPERATIONS AREA.
35
NOTE:
19
25
1
17
34 CONTOURS ARE HISTORICAL & DO
31
27
18
20
13
SP239726
35
NOT REFLECT THE CURRENT SURFACE
15 LEVELS.
STOCKPILE
AREA TO BE
APPROX 100m 3
36
GCL CAPPED 1
32
APPROX 5000m 2 15
2 STOCKPILE
RPEQ 3102
APPROX 120m 3 __________________
Vince Reitano Date: 20/03/23
6 CONSULTING ENGINEER'S SIGNATURE
33
22
28
14
29
23
24
5 3
4 GIRRAWEEN
13
15
OLD LANDFILL
15
15
33
30 E
D
28
16
35 34
C GENERAL AMENDMENTS 20.03.23
23
31
29 31 3 3
19
17
20 181 B HATCHING & NOTE ADDED 16.03.23
27 30 32
25
15 9 A FOR APPROVAL 13.03.23
26
24
34
26 21 No REVISION DATE
21 25 CLIENT: NOOSA SHIRE COUNCIL
20 27
14
34
18 16
15
29
13
31
ADDRESS:
1615
Y
22
R
DA
17
LAKEVIEW RISE
13
N
OU
15
NOOSA HEADS
AB
22
14
35
11 E
AR
28
PROJECT:
13
12
14
32 15
RECAPPING OF DISUSED
24 23
14
14
15
GIRRAWEEN OLD LANDFILL SITE
28
34
29
15
33
15
15
19
17
DRAWING TITLE:
19 14
14
23
SITE PLAN (PROPOSED WORKS)
SITE PLAN 1:2000 SETOUT TABLE
POINT # EASTING NORTHING POINT # EASTING NORTHING SCALE 1:2000 EAS DRAWN: AB
1 509040.078 7077994.598 4 509006.828 7077905.185 DATUM: -
2 509056.192 7077972.109 5 508985.695 7077918.660
Original drawing size: A3
3 509041.127 7077918.404 6 508967.820 7077957.207
DRG No 23004-GIR-02 C
Page 44
BELLAS & REITANO
16
CONSULTING ENGINEERS & PROJECT MANAGERS
16 Lizanne Street Boondall
PO Box 338 Taigum QLD 4018
15
Phone (07) 3265 2866
VED
CE
17
FEN
Email [email protected]
EMO
BANK
T
R
15
N
18
E
IME
NOTE:
TO B
K
REFER DRGS 23004-GIR-05 & 06
BAN
SED
R
FOR CONTOUR BANK & BATTER
19
U
DRAIN DETAILS.
NTO
20
OU R
CO
ANK
T
21
CON
__________________ RPEQ 3102
Vince Reitano Date: 20/03/23
22
UR B
CONSULTING ENGINEER'S SIGNATURE
23
CONTO
DRAIN
R
B ATTE
E
D
C
B GENERAL AMENDMENTS 20.03.23
A FOR APPROVAL 13.03.23
N K No REVISION DATE
BA CLIENT: NOOSA SHIRE COUNCIL
OUR 16
NT
CO
ADDRESS:
23
24
O VED LAKEVIEW RISE
25
R EM
BE 16 NOOSA HEADS
TO
ED
CE
FEN PROJECT:
IN
NT
22
ME
TA
EDI RECAPPING OF DISUSED
26
S
20
RE
GIRRAWEEN OLD LANDFILL SITE
21
19
18
27
BE
17
28
DRAWING TITLE:
TO
PROPOSED PART SITE PLAN
29
E
SEDIMENT FENC
16
SCALE 1:500 DRAWN: AB
15
30 DATUM: -
Original drawing size: A3
PROPOSED PART SITE PLAN 1:500 DRG No 23004-GIR-04 B
Page 45
RECONSTRUCT CONTOUR BANKS CONTOUR BANK MATERIAL SAME
WITH FINAL COVER. AS CONFINING LAYER.
FINAL CAPPED
SURFACE.
'ELCOSEAL X800' GCL INSTALLED TO
MANUFACTURER'S REQUIREMENTS,
500
BELLAS & REITANO
CONSULTING ENGINEERS & PROJECT MANAGERS
500
1V in
4H 16 Lizanne Street Boondall
4H PO Box 338 Taigum QLD 4018
1V in
300
Phone (07) 3265 2866
Email [email protected]
1500 FINAL COVER OF BLENDED
NOTE 1.
SAND CONFINING LAYER FINAL COVER DEPTH MAY BE REDUCED
WOOD MULCH & SAND.
OR CONFINING LAYER TO 1.0m IF PLANTING GRASSES AND
FINAL TRIMMED SURFACE CONFORMING TO GCL SHRUBS ONLY, BUT NOT LESS THAN
REFER NOTE 1.
EXISTING COVER TO BE TRACK ROLLED READY MANUFACTURER'S 1.5m IF PLANTING TREES.
EXISTING WASTE TO RECEIVE GCL. SPECIFICATIONS.
CONTOUR BANK (TYPICAL SECTION) NOTE: IF TIME FOR COMPLETION OF FINAL COVER IS
__________________ RPEQ 3102
GREATER THAN 6 MONTHS THEN CONSTRUCT THE Vince Reitano Date: 20/03/23
EXISTING SURFACE SLOPE 1 in 10 CONTOUR BANKS TO DETAIL WITH A LOGITUDINAL
FALL OF 1 in 100.
CONSULTING ENGINEER'S SIGNATURE
1:50
RECONSTRUCT CONTOUR BANKS
WITH FINAL COVER.
FINAL CAPPED E
SURFACE. D NOTE AMENDED 20.03.23
500 'ELCOSEAL X800' GCL C GENERAL AMENDMENTS 20.03.23
B NOTES AMMENDED & ADDED 16.03.23
500
A FOR APPROVAL 13.03.23
1V in
4H No REVISION DATE
4H CLIENT: NOOSA SHIRE COUNCIL
1V in
ADDRESS:
300
LAKEVIEW RISE
SAND CONFINING LAYER NOOSA HEADS
OR CONFINING LAYER
PROJECT:
1500 FINAL COVER OF BLENDED
CONFORMING TO GCL
FINAL TRIMMED SURFACE MANUFACTURER'S RECAPPING OF DISUSED
WOOD MULCH & SAND.
TO BE TRACK ROLLED READY SPECIFICATIONS. GIRRAWEEN OLD LANDFILL SITE
EXISTING COVER TO RECEIVE GCL.
REFER NOTE 1.
EXISTING WASTE
DRAWING TITLE:
CONTOUR BANK
CONTOUR BANK (TYPICAL SECTION) (TYPICAL SECTIONS)
EXISTING SURFACE SLOPE 1 in 6 SCALE 1:50 DRAWN: AB
1:50 DATUM: -
Original drawing size: A3
DRG No 23004-GIR-05 D
Page 46
5000
BELLAS & REITANO
300 CONFINING
CONSULTING ENGINEERS & PROJECT MANAGERS
500 (TYP)
300 (TYP)
16 Lizanne Street Boondall
LAYER
PO Box 338 Taigum QLD 4018
40 THICK x 20Ø DRAINAGE Phone (07) 3265 2866
1000 (TYP) A24 GEOFABRIC
AGGREGATE OVER A24 Email [email protected]
GEOFABRIC.
4H 1 V in 4H 1V in
1V in 4H 1V in 4H
FGL
'ELCOSEAL X800' GCL INSTALLED TO EXISTING CAPPING EXISTING WASTE
MANUFACTURER'S REQUIREMENTS.
__________________ RPEQ 3102
BATTER DRAIN (TYPICAL SECTION) Vince Reitano
CONSULTING ENGINEER'S SIGNATURE
Date: 20/03/23
1:50
E
D
300 CONFINING GCL FALL 1 in 50 C
LAYER B GENERAL ADDITIONS 20.03.23
GCL
A FOR APPROVAL 13.03.23
X). No REVISION DATE
N (MA CLIENT: NOOSA SHIRE COUNCIL
O W
in 5D
P E 1 1.000
SLO
ADDRESS:
WASTE 1500 MIN - VARIES TO
WASTE SUIT SLOPE LAKEVIEW RISE
1000
1500 MIN - VARIES TO EXISTING CAPPING NOOSA HEADS
SUIT SLOPE PROJECT:
RECAPPING OF DISUSED
CONFINING LAYER TAPER SECTIONS GIRRAWEEN OLD LANDFILL SITE
DOWNSLOPE & UPSLOPE DRAWING TITLE:
1:50 BATTER DRAIN & CONFINING
LAYER TAPER SECTIONS
SCALE 1:50 DRAWN: AB
DATUM: -
Original drawing size: A3
DRG No 23004-GIR-06 B
Page 47
2023 Ecological Management Plan – Grasstree Court – Lot 9
APPENDIX B2 - Monitoring Sheet – Rehabilitation
Item Target Criteria Measure/Unit
GENERAL
Fencing Protection fencing intact Visual
Stabilisation/ No evidence of erosion/stable landscape Visual/Photograph/
Erosion Record erosion
Fauna Habitat Logs in place Unit/visual
Mulch Intact Visual
VEGETATION
Species List Attach
Weeds Rehabilitation zones significantly weed free (<5%)/No woody weeds Unit/Area Count
Trees* High (90%) survival of planted stock Unit count
Planted Trees* Height 1-2-3m Unit
Planted Small Trees* Height 0.5-1-2m Unit
Natural Recruitment* Signs Visual/Species/Unit
PHOTO POINTS
# Attach Photo Record
RECOMMENDATIONS/RECTIFICATION/NOTES
*Planted trees/shrubs for Stage 2 have been completed under Stage 1 works (i.e. continue monitoring as per Stage 1 EMP)/natural recruitment for Stage 2 dependent on soil and mulch placement protocols.
*Refer also additional trees planted for Stage 2.
39