Original source · versioned page text
Updated EMP Stage 2_Grasstree Court April 2023
2023 Ecological Management Plan — Grasstree Court — Lot 9 CLEARING STAGE 1B: \Clearing of Lot 6 (approx 0.8Ha) (Cleared material to be relocated to the first stage of the rehabilita- tion site as per EMP. INOTE: |The extents of clearing shown here lare indicative only. All trees nomin- lated for retention to be retained as per EMP and OPW approvals Pt CLEARING STAGE 1A: \Clearing along Grasstree Crt Verges to en: lable installation of trunk services and foot- ipaths. Minor Clearing within Lot 6 and Lot 9 to es- tablish 2 x Transformer sites to enable Energex upgrade works \Cleared Material to be disposed off site or temproaty stabilsittion, reused in he: landscape areas, or removed off site FOR APPROVAL Sewez wnoaeraea] BLUE CARE SUNRISE BEACH (OVERALL WORKS NOT FOR CONSTRUCTION e Cc — Veeveis| RETIREMENT LIVING & PLAN Lpernae owe ogee @ BlueCare’ i 2 anna ae Live life your way, Poccensniemrnmeneony 148-901942 1000-SK100 Figure 3 — Staged Clearing Plan
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Updated EMP Stage 2_Grasstree Court April 2023.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.