Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Updated EMP Stage 2_Grasstree Court April 2023

of 47

Page text read automatically using OCR, there may be inaccuracies

2023 Ecological Management Plan — Grasstree Court — Lot 9

 

 

 

CLEARING STAGE 1B:
\Clearing of Lot 6 (approx 0.8Ha)

(Cleared material to be relocated
to the first stage of the rehabilita-
tion site as per EMP.

INOTE:

|The extents of clearing shown here
lare indicative only. All trees nomin-
lated for retention to be retained as per
EMP and OPW approvals

 

Pt
CLEARING STAGE 1A:

\Clearing along Grasstree Crt Verges to en:
lable installation of trunk services and foot-
ipaths.

Minor Clearing within Lot 6 and Lot 9 to es-
tablish 2 x Transformer sites to enable
Energex upgrade works

\Cleared Material to be disposed off site

or temproaty stabilsittion, reused in
he:

landscape areas, or removed off

site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR APPROVAL Sewez wnoaeraea] BLUE CARE SUNRISE BEACH (OVERALL WORKS
NOT FOR CONSTRUCTION e Cc — Veeveis| RETIREMENT LIVING & PLAN
Lpernae owe ogee @ BlueCare’ i 2 anna ae

 

 

Live life your way,

 

 

 

 

Poccensniemrnmeneony 148-901942  1000-SK100

 

 

 

Figure 3 — Staged Clearing Plan

 

 

 

Log in to download the original (Updated EMP Stage 2_Grasstree Court April 2023.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.