Updated EMP Stage 2_Grasstree Court April 2023

of 47

Page text read automatically using OCR, there may be inaccuracies

2023 Ecological Management Plan – Grasstree Court – Lot 9


1. INTRODUCTION

1.1 Subject Land and Approved Development
The subject land is located at land on Grasstree Court, Sunrise Beach and formally described as Lot 6 on
RP901384 (SP322789) and Lot 9 on SP252905 (SP322789) (FIGURE 1 – Aerial of Subject Land).

On 20 December 2011, the Sunshine Coast Council (Council) approved a development application for a Material
Change of Use for Multiple Housing – Type 3 Retirement and Special Needs, Commercial Business – Type 2
Medical and Wellbeing –Type 1 Health; and the Reconfiguring a Lot (1 into 2 lots). The State (DERM) approved
the development in June 2011.

The proposal will result in the residential aged care facility to be situated on Lot 6 (northern lot) and a
retirement facility to be situated on Lot 9 (southern lot) which includes independent living apartments / units,
and a community facility.

Minor Change 2019
A minor change amendment application was made to Noosa Shire Council (Council) in December 2018. The
minor change does not result in change of approved uses but rather minor changes to internal building layouts
to meet current market expectations, industry standards and the existing approval conditions. While the
changes are considered to be ‘minor’, the changes improve the development outcome in terms of design
quality, reduced hardstand area, bushland and waterway protection and bushfire safety. Council granted
approval of this change request on 28 March 2019 with updated set of conditions. Conditions relating to the
ecological component (other than change to Lot numbers) are unchanged from the original approval. The
conditions (under #12) also state that “The establishment of the vegetation offsets must be completed prior to
the commencement of the use of the first stage”.

Minor Change 2020
In November 2020 Council granted a minor change to stage the development (Minor Change Lot 6). The
development is to proceed in a staged approach with Lot 6 (as stage 1) followed by Lot 9 as stages 2, 3 and 4.
Council has approved the Ecological Management Plan (EMP) for Stage 1 Lot 6 (February 2021). FIGURE 2
illustrates the Approved Staged Development and FIGURE 3 the Staged Clearing Plan. There are no other
changes that adversely alter the vegetation clearing, fauna management or rehabilitation actions. The staging
approach has allowed some ecological enhancements, including staging of the clearing of vegetation (and
trees), and an improved rehabilitation strategy for the offset/rehabilitation site.

Relevant amended conditions (10 November 2020) associated with the Minor Change are 12.3.7 and 12.4, as
follows:

All information must be prepared by a person with industry experience in the successful establishment and/or
re-establishment of heathland vegetation. Industry and educational institution involvement is recommended.

The establishment of the vegetation offsets for each stage must be completed prior to the commencement of
the use for each stage. The Vegetation Clearing Offset program, required by these conditions, must be
implemented in a staged manner reflective of the approved staging of the development. To this end separate
Vegetation Clearing Offset programs must be developed to reflect the staged delivery of the development, in
particular the staged development of lot 6, and the subsequent development of lot 9.

No clearing is permitted unless in accordance with the approved staged Vegetation Clearing Offset program 1.

Minor Change 2021
In December 2021 Council granted a minor change for Lot 9 which included amendment to Condition 1 (the
plans and EMP Stage 2 dated 1 July 2021) and additional condition 48, i.e.
48. Vegetation clearing on Lot 9 SP 252905 cannot commence until:
     a. Lot 6 has been cleared of vegetation and live soil (topsoil, subsoil and seed bank) has been transferred to the
     receiving site, with the receiving site stage 1 weed control, planting and irrigation installation completed (as detailed
     within section 2. Site Treatment and Transfer Methods pg. 24 of the approved OPW18/0341.01 Environmental
     Management Plan Stage 1 – Lot 6 revision 4 prepared by Gondwana Ecology Group P/L dated February 2021; and
     b. Written notice has been provided to Council that Civil works on Lot 9 SP 252905 will commence within three (3)
     months following the commencement of clearing unless otherwise agreed in writing by Council.

     1 i.e. the Stage 1 2021 EMP.

                                                                                                                            1

Log in to download the original (Updated EMP Stage 2_Grasstree Court April 2023.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.