Original source · versioned page text
Updated EMP Stage 2_Grasstree Court April 2023
16
19
27
20
17
14
EA 15
SE
ME
NT
22
(TY
P)
16
14
24 14
17
16
BELLAS & REITANO
17
29
14
15
23
AR
14 CONSULTING ENGINEERS & PROJECT MANAGERS
EA
16 Lizanne Street Boondall
PO Box 338 Taigum QLD 4018
BO Phone (07) 3265 2866
28 U
N Email [email protected]
30
D
3321 29
AR
26
34
Y
21
33
30
34
16
NOTE:
CONTOURS ARE HISTORICAL & DO
NOT REFLECT THE CURRENT SURFACE
35
LEVELS.
19
1
25
17
34
31
27
18
20
13
SP239726
35
15
__________________ RPEQ 3102
36
Vince Reitano Date: 20/03/23
32 15 CONSULTING ENGINEER'S SIGNATURE
33
22
28
14
29
23
24
GIRRAWEEN E
D
13
15
OLD LANDFILL
15
33
15 C GENERAL AMENDMENTS 20.03.23
30 B FOR APPROVAL 13.03.23
A FOR REVIEW ONLY 23.02.23
28
16
35 34
No REVISION DATE
23
31
29 31 33
19
17
27 30 3 2 20 181 CLIENT: NOOSA SHIRE COUNCIL
15
25 9
26
24
34
26 21
21 25 ADDRESS:
20 27
14
34
18 LAKEVIEW RISE
16
15
29
13
NOOSA HEADS
31
1615
Y
22
AR
17
D PROJECT:
13
U N
15
RECAPPING OF DISUSED
BO
22
EA
14
35
11 GIRRAWEEN OLD LANDFILL SITE
AR
28
1
12
14
32
3
15
24 23
14
14
15
DRAWING TITLE:
13
EXISTING SITE PLAN
28
34
29
15
33
15
15
19
(HISTORICAL)
17
19 14
14
23
SCALE 1:2000 EAS DRAWN: AB
18
DATUM: -
Original drawing size: A3
SITE PLAN 1:2000
DRG No 23004-GIR-01 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Updated EMP Stage 2_Grasstree Court April 2023.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.