Updated EMP Stage 2_Grasstree Court April 2023
2023 Ecological Management Plan – Grasstree Court – Lot 9
2. STRUCTURE AND RESPONSIBILITY OF THE MANAGEMENT PLAN
The measures to be implemented to achieve the conditions of approval and appropriate ecological outcomes
are provided in two separate attachments, as follows:
Appendix A - Vegetation and Fauna Management Plan (VFMP) – Stage 2
• Activities on subject land prior to and during clearing, including appropriate management of fauna
Appendix B – Rehabilitation Management Plan (RMP) – Stage 2
• Management of subject land and rehabilitation of the offset site
The relevant Council (i.e. 12-20), and State (i.e. DERM 1-16) approval conditions associated with ecological
matters are identified in the Table 1 and 2 respectively, with corresponding Section/Attachment provided for
reference. Note that many of the DERM conditions simply require confirmation and no specific measure/action
within the VFMP or RMP.
The acceptable implementation of the VFMP and RMP will be the responsibility of contractors engaged by
Lendlease.
Due to the nature of the Council and State approval conditions, and for completeness, some sections are
repeated in both the VFMP and the RMP.
3
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Updated EMP Stage 2_Grasstree Court April 2023.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.