16216_GIA_Doonella Street_11.01.19
Attached to the e-mail Change to DA (Amend Proposal Plans) - MCU17/0014.02.
Friday, 11 January 2019 Our Ref: 16216/ Office: Sunshine Coast Council Ref: MCU17/0014 NOOSA COUNCIL PO BOX 141 TEWANTIN QLD 4565 ATTENTION: Patrick Murphy Dear Sir/Madam, GENERALLY IN ACCORDANCE REQUEST MATERIAL CHANGE OF USE – MULTIPLE HOUSING TYPE 4 CONVENTIONAL – 10 UNITS & COMMERICAL BUSINESS TYPE 1 OFFICE & TYPE 2 MEDICAL 30 – 32 DOONELLA STREET, TEWANTIN LOT 32 ON RP893427 & LOT 903 ON T1631 We refer to the above mentioned development approval and on half of the applicant, Doonella Street Pty Ltd TTE, submit an amended set of drawings for Council’s endorsement as Generally in Accordance with the original approval. We understand that a fee of $560 applies to this request. Payment of the fee will be made as soon as an outstanding payment email and Council reference number have been received. Background Council records will show that the application was approved on 27 September 2017. A revised set of proposal plans were subsequently submitted to Council and it was confirmed by letter dated 17 April 2018 that these plans complied with condition 3 of the development approval. Since this time the applicant has been working with the consultant team to develop design details for the approved buildings and this process has resulted in a number of changes to the approved development. A full set of amended proposal plans are included with this letter and these are listed in the Table below. Plan No. Rev. Plan/Document Name Date 1646-SD01 13 Site Plan By Archiology 30/11/2018 1646-SD02 15 Ground/Carpark Plan By Archiology 30/11/2018 1646-SD03 13 Level 1 Plan By Archiology 30/11/2018 1646-SD04 13 Level 2 Plan By Archiology 30/11/2018 1646-SD05 12 Roof Plan By Archiology 30/11/2018 1646-SD07 13 Northern and Eastern Elevations By Archiology 30/11/2018 1646-SD08 12 Southern and Western Elevations By Archiology 30/11/2018 1646-SD09 11 Section Plans By Archiology 30/11/2018 1646-SD10 12 Section Plans By Archiology 30/11/2018 1646-SD11 11 3D Impression 01 + 02 30/11/2018 1646-SD12 9 3D Impression 03 + 04 30/11/2018 1646-SD14 6 3D Impression 05 30/11/2018 1646-SD15 7 3D Impression 06 + 07 30/11/2018 1646-SD17 5 3D Impression 08 + 09 30/11/2018 1646-SD19 4 Units Areas Level 1 and Level 2 30/11/2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (16216_GIA_Doonella Street_11.01.19.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
Further details of the key changes are provided below:
Ground level
• The car park layout has been amended to include blind isles rather than a one way circulation
system;
• The width of the driveways has been amended to 4m in accordance with condition 22 of the
Decision Notice;
• A fire separation compartment has been introduced to isolate 40 and 14 comparative car
spaces. This change includes fire walls, monitors and fire doors;
• A single storey fire hydrant pump room has been added at the front of the building;
• Further details of the Stormwater 360 system and rainwater harvesting tank have been added;
• The inclusion of an electrical store on the western of the car park;
• The setback of the fire stairs to the eastern boundary has been reduced marginally by 0.2m
and this continues on the remaining floors of the stairs; and
• The original layout of the lockers, motorbike parks and bicycles has been amended.
Level One
• The layout of the communal space and amenities has been revised;
• The setback of the lift to the western boundary and fire stairs have been reduced marginally to
2m and this reduced setback continues up the balance of these elements of the building; and
• The size of the lawn for unit 1 has been reduced.
Elevations
• The opening on the northern elevations of the residential building have been amended; and
• Small amendments have been made to the design of the window openings and the car
parking level on the eastern side of the commercial building.
Sections
• In order to accommodate the services within the basement and provide sufficient head room,
the floor to ceiling height in the basement has had to be increased slightly by 200mm. This
change has increased the height of the proposed residential and commercial buildings but
they continue to comply with the maximum building height of 8m from natural ground level.
With regard to the proposed pump room at the front of the building, it should be noted that this is
required as there is not enough water pressure in the street, in case of a fire. The pump room also
needs to be in the south eastern corner of the site where the water connection is located. The project
team has looked at a number of ways to minimise the impact of this change on the design whilst
balancing the overriding need to provide for access to the room in the event of a fire event. As a result
the architect has looked at moving the room back into the building, moving it away from the main
building and reducing its size but it has been concluded that the proposed design is the only feasible
outcome given the constraints and amount of infrastructure in this corner of the site. As a result, the
architect had tried to ensure that the room will integrate with the overall design as much as possible
by adopting a roof line and colours that are consistent with the main building.
With regard to the potential impacts of the pump room on visibility from the exit driveway it should be
noted that the conditions of the approval restrict this to a left turn only and as such, the room will not
impact on the key sightline to the right (west). With regard to pedestrian movements, the architects
have prepared the following screen shot images to show that the driveway also complies with the
minimum sightline clearance required by AS2890.1 for pedestrian safety.
Page 3
Overall the proposed changes are considered to be minor in nature and Generally in Accordance with the current approval, and we therefore request that Council endorse them accordingly. Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Page 4
Yours faithfully PROJECT URBAN Mick Sheppard Director Email: [email protected]