Approved Decision Notice - MCU26 0040, OPW26 0066 & RAL26 0013 (As Published)
Erosion and Sediment Control
34. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
35. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties.
The sediment and erosion control design and measures have NOT been approved, it is the
site's Supervising Engineer who is responsible for ensuring that the sediment and erosion
control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods;
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods;
c. Been revised to address predicted rainfall events; and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be
found inefficient.
36. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer’s instructions and the current best practice
standards. A copy of the latest erosion and sediment control plan, prepared and endorsed
by a suitably qualified person (RPEQ/CPESC), must be made available to Council within 5
business of request.
*(Refer to Advisory Note)
37. All erosion and sediment controls must be inspected to ensure the controls are not being
bypassed. Inspections must occur and be electronically recorded:
a. at least daily (when work is occurring on site) or weekly (when work is not occurring on
site); or
b. within 24 hours of expected rain; or
c. within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to
mobilise sediment on site).
38. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
to rainfall occurring.
39. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
Page 16 of 27
Document Set ID: 25048906
Version: 6, Version Date: 13/08/2026