Approved Decision Notice - MCU26 0040, OPW26 0066 & RAL26 0013 (As Published)

of 27

Page text read automatically using OCR, there may be inaccuracies

                                       Page 24 of 27
Document Set ID: 25048906
Version: 6, Version Date: 13/08/2026


[OCR of page images]
Referral Trigger

Impacted Electrical
Infrastructure

Drainage Work, Stormwater, Earthworks &

Landscaping, Reconfiguring a Lot - Community Title
Subdivision (1 Lot into 54 Lots)

& Schedule 10, Part 9, Division 2, Table 1, Item 1
(10.9.2.1.1) — Reconfiguring a lot subject to an easement
for the benefit of a distribution entity under the Electricity
Act for a supply network; or part of the lot is within 100m
of a substation site

& Schedule 10, Part 9, Division 2, Table 2, Item 1
(10.9.2.2.1) — Material Change of use of premises within
100m of a substation site or subject to an easement for
the benefit of a distribution entity under the Electricity Act
and the easement is for a supply network

& Schedule 10, Part 9, Division 2, Table 3, Item 1
(10.9.2.3.1) - Operational Work on premises subject to
an easement for the benefit of a distribution entity under
the Electricity Act for a supply network; or part of the lot
is within 10m of a substation site

Easement AA on SP316697

Energex provides the following response to the application in accordance with Section
56(1) of the Planning Act 2016:

 

Component of
Development

Advice Agency direction

 

MCU/ ROL! OPW

 

 

& $56(1)(b)(i) — approval subject to stated development
conditions

 

 

In accordance with Section 56(1) should the Assessment Manager decide to approve
the proposed Development Application, as an Advice Agency, Energex requires that
the assessment manager impose the below conditions. These conditions have been
imposed in response to the matters prescribed under Section 55 (2) of the Planning Act

 

 

 

 

 

 

 

 

 

 

 

 

 

2016.
Table 1
Plans forming part of this Approval
Title Plan No. Issue Date
SITE / FLOOR PLAN LEVEL 1- | 2025-68 I 29.05.26
OPT 05
Overall Development Layout Plan | C010 B 08.05.26
Landscape Plan 2025-68 | 29.05.26
Sheet 30

Table 2
Condition Timing Purpose/Reason
1 Carry out the approved development At all times To ensure the

generally in accordance with the approved development is
carried out generally

 

 

 

 

 

 

Have you seen our fact sheets?

See the ‘considerations when developing around electricity infrastructure’ section of our website

Document Set ID: 25048906
Version: 6, Version Date: 13/08/2026

Page 24 of 27

Log in to download the original (Approved Decision Notice - MCU26 0040, OPW26 0066 & RAL26 0013 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.