Original source · versioned page text
Approved Decision Notice - MCU26 0040, OPW26 0066 & RAL26 0013 (As Published)
Page 24 of 27 Document Set ID: 25048906 Version: 6, Version Date: 13/08/2026 [OCR of page images] Referral Trigger Impacted Electrical Infrastructure Drainage Work, Stormwater, Earthworks & Landscaping, Reconfiguring a Lot - Community Title Subdivision (1 Lot into 54 Lots) & Schedule 10, Part 9, Division 2, Table 1, Item 1 (10.9.2.1.1) — Reconfiguring a lot subject to an easement for the benefit of a distribution entity under the Electricity Act for a supply network; or part of the lot is within 100m of a substation site & Schedule 10, Part 9, Division 2, Table 2, Item 1 (10.9.2.2.1) — Material Change of use of premises within 100m of a substation site or subject to an easement for the benefit of a distribution entity under the Electricity Act and the easement is for a supply network & Schedule 10, Part 9, Division 2, Table 3, Item 1 (10.9.2.3.1) - Operational Work on premises subject to an easement for the benefit of a distribution entity under the Electricity Act for a supply network; or part of the lot is within 10m of a substation site Easement AA on SP316697 Energex provides the following response to the application in accordance with Section 56(1) of the Planning Act 2016: Component of Development Advice Agency direction MCU/ ROL! OPW & $56(1)(b)(i) — approval subject to stated development conditions In accordance with Section 56(1) should the Assessment Manager decide to approve the proposed Development Application, as an Advice Agency, Energex requires that the assessment manager impose the below conditions. These conditions have been imposed in response to the matters prescribed under Section 55 (2) of the Planning Act 2016. Table 1 Plans forming part of this Approval Title Plan No. Issue Date SITE / FLOOR PLAN LEVEL 1- | 2025-68 I 29.05.26 OPT 05 Overall Development Layout Plan | C010 B 08.05.26 Landscape Plan 2025-68 | 29.05.26 Sheet 30 Table 2 Condition Timing Purpose/Reason 1 Carry out the approved development At all times To ensure the generally in accordance with the approved development is carried out generally Have you seen our fact sheets? See the ‘considerations when developing around electricity infrastructure’ section of our website Document Set ID: 25048906 Version: 6, Version Date: 13/08/2026 Page 24 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.