Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads - · RAL22/0021
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
Heidi Meyer and Kim Carroll
C/- Covey Associates Pty Ltd
PO Box 16 Maroochydore
QLD 4558
[email protected]
15/05/2023
Dear Chris Camp,
RE: Unitywater Application No.: 2023022875S0 - ACP
Development Estate Name: 41 Picture Point Cres
The Unitywater Decision Notice (Approval) for the referenced application is attached.
General information about the connection process is also available at www.unitywater.com.
If you have any queries about the application, please contact Unitywater by email at
[email protected] or by phone on 1300 0 UNITY (1300 086 489).
Yours sincerely,
Development Certification Team
Unitywater
A&C - Decision Notice Template – Connection Approval Page 1 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 23 (of 34)
Section 2
Head Office:
Ground Floor, 33 King Street
Caboolture QLD 4510
Mailing Address
PO Box 953, Caboolture QLD 4510
1300 0 UNITY (1300 086 489)
www.unitywater.com
ABN: 89 791 717 472
DECISION NOTICE
South-East Queensland Water (Distribution and Retail Restructuring) Act 2009
Application Details
Connection Application No.: 2023022875S0 - ACP
Street Address: 41 Picture Point Cres Noosa Heads QLD 4567
Property Description(s): Lot 2 RP220514
Local Government Area: Noosa Shire Council
Decision Details
Decision: Approval
Decision Date: 15/05/2023
Accredited Entity: Covey Associates Pty Ltd ACR/AE2018-016
Registered Certifier: Shane Rynne - ACR/MAJ 2020-113
Certifier Category: Major Connections Certifier
Approval Phase: Connection Approval
Approval Type: New Connection
Cross-Connection Hazard: Not Applicable, connections are only residential single dwelling lots with
standard metered services (Low hazard).
Fire Service: Not Applicable, connections are only residential single dwelling lots with
standard metered services.
Description: Connection Approval and Maximum Demand Allocation for
Proposed Reconfiguration of a Lot (1 into 2 lots);
Connection of Lots to Water Supply and Sewerage Networks – metered
water services and sewerage property connections
Attachments: As referenced in the Table of Approved Documents and Drawings
and the Table of Documents and Drawings for Information Only.
A&C - Decision Notice Template – Connection Approvals Page 2 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 3
Conditions
a) 1. Connection Approval Conditions Timing
This water approval authorises and is limited to connection of network infrastructure and property
services infrastructure at Lot 2 RP220514 to Unitywater’s network infrastructure, and where relevant,
the establishment of water supply and sewerage network works infrastructure, subject to the following
conditions.
1.01b) When approval lapses
c) This water approval lapses if the connection is not completed within At all times.
4 years after the date of this water approval.
Note: Any works, which directly or indirectly impact existing Unitywater Network Infrastructure
or Assets, that are not identified within this connection approval, may be subject to other
Unitywater approvals and may require, for example, a Planned Network Intervention (PNI)
Application or a Private Works Application for supervision of works. It is the Applicant’s
responsibility to identify all such Network Infrastructure and Assets and obtain Unitywater
approval prior to commencement of any such works.
1.05 Connection(s) to Unitywater water supply or sewerage network(s)
Submit a request to Unitywater for Private Works to perform the After payment of the
necessary water supply or sewerage live works network applicable
connection(s) for the development. infrastructure
Note 1: Connections to the water supply network may only be charges and
carried out by Unitywater Private Works, or its authorised payment of
representatives, at the developer’s expense. Unitywater Private
Works’ quotation for
Note 2: Unitywater will not carry out the network connection works
the live works.
unless it is satisfied that all necessary approvals have been obtained
and relevant payments of infrastructure charges have been made.
Note 3: Works on, or in close proximity to, existing Unitywater
infrastructure require consultation with Unitywater Private Works
prior to commencement of construction. Private Works shall be
contacted (allow a minimum of five working days for processing)
prior to commencing work. The requirement for a Planned Network
Intervention (PNI) application will require additional processing time.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
Advice: Connections to the existing Unitywater sewerage network
may be carried out in accordance with section 5.7.1 of the
Accreditation and Certification Manual.
1.06 Approved maximum demand allocation
Do not exceed the following maximum demand allocation for this To be maintained at
development: all times.
Water Supply: 4.58 EPW (Equivalent Persons,
Water)
Sewerage: 4.58 EPS (Equivalent Persons,
Sewerage)
2 Lots x 2.29EP/Lot (2016 ABS Census SA2 Catchment Name:
Noosa Heads; Detached Dwelling) = 4.58 EP
[Netserv Plan Part A, Appendix B – Schedule of Works, Table
1 - Conversion Factors for Detached and Attached Dwellings]
Where the demand is determined in accordance with:
A&C - Decision Notice Template – Connection Approvals Page 3 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 4
• Netserv Plan Part A Appendix A Connections Policy;
• Netserv Plan Part A Appendix B – Schedule of Works;
• the South East Queensland Water Supply and Sewerage Design
and Construction Code; and
• the Network Demand Assessment as listed in the Table of
Approved Documents and Drawings.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
Advice: If the use is intended to change and result in a higher
demand for the connection, the property owner must submit an
amendment request or make a separate connection application to
Unitywater and obtain approval for any increased demand to
Unitywater’s water supply and sewerage networks.
1.07d) Cost for existing infrastructure alterations or relocations
Carry out any change to Unitywater’s existing infrastructure At all times during
authorised by this approval at no cost to Unitywater. construction and
until works are
accepted ‘Off-
Maintenance’.
1.08 Easements
Provide easements over water supply mains, sewerage gravity Prior to the
mains and rising mains: connection to
a) in accordance with the South East Queensland Water Supply Unitywater network.
and Sewerage Design and Construction Code; and
b) with Unitywater’s most current registered dealing held by the
State Department of Natural Resources, Mines and Energy
without alteration or amendment.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
Metered water service connection points – existing mains
1.22
(Reconfiguring a Lot)
Provide water service connection points as follows: a) Prior to the works
being carried out.
a) For each proposed lot fronting the existing Unitywater water
supply asset, which is required to be serviced from that existing b) Prior to the works
water supply asset, submit an approved plan to Unitywater’s being carried out
Private Works section and obtain a quote for Unitywater to install and prior to the
individual metered water service(s). issue of the
b) Pay Unitywater, as specified in Unitywater’s Private Works Certificate of
quotation, to carry out the installation of individual metered water Completion.
service(s).
c) For all other proposed lots – construct and install individual
metered water service/s.
Note: Where the development is subject to payment of Infrastructure
Contributions prior to property service connection, evidence of
payment of Infrastructure Charges must be provided to Unitywater’s
Private Works section prior to the installation of the metered service
connection works. Unitywater will install the water service(s) within 20
business days after the payment of the Infrastructure Charges.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
A&C - Decision Notice Template – Connection Approvals Page 4 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 5
1.24a) Certification of water service – Reconfiguring a Lot
Provide a registered surveyor’s certification that the service point(s) Prior to the issue of
and meter(s) to an existing building, that will remain after the Certificate of
reconfiguration of the lot, will be located wholly within the frontage of Completion.
the lot containing the existing building after the reconfiguration has
occurred.
Note: Appropriate Council permits shall be obtained for any
alteration to internal premises main pipe-work. The developer is
responsible for all costs associated with the relocation or alteration to
any existing internal service/s. This includes payment to Unitywater
for the installation of new or relocation of existing metered water
services if required.
Sewerage reticulation – Reconfiguring a Lot (residential and non-
1.40
residential)
a) Provide reticulated sewerage to all lots within the development, a) Prior to the issue
including a property connection to each lot and connection(s) to of the Certificate
Unitywater’s existing sewerage network in accordance with of Completion.
Unitywater’s Connections Policy and the South East Queensland b) Prior to the
Water Supply and Sewerage Design and Construction Code. commencement
b) Compile, submit and obtain approval for engineering drawings of the works.
and specifications detailing the works required by condition c) At the time the
1.40a). works are carried
c) The developer must pay all costs associated with the connection, out.
inspection and acceptance of the proposed works.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
1.46 Relocate or re-align sewerage main
Relocate or re-align the existing 150 mm diameter sewerage main Prior to connection
from the eastern boundary of 41 Picture Point Cres through to the to the Unitywater
existing maintenance hole adjacent to the northwestern boundary of network.
37 Picture Point Cres.
This condition is imposed under section 99BRDJ of the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009.
1.48 Connect existing dwelling to sewerage
Connect the existing dwellings on Lot 1 RP2220514 and Lot 3 Prior to the issue of
SP265108 to Unitywater’s sewerage network. the Certificate of
This condition is imposed under section 99BRDJ of the South-East Completion.
Queensland Water (Distribution and Retail Restructuring) Act 2009.
Advice: Changes to property plumbing will require the Applicant to
make a plumbing application to the relevant Council.
A&C - Decision Notice Template – Connection Approvals Page 5 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 6
1.50 Building over and adjacent to Unitywater asset (BOAA)
Obtain a referral response approval (Queensland Development Prior to the
Code, MP 1.4 – Building over or near relevant infrastructure) for any commencement of
building or structure to be built within proximity of Unitywater any works for that
‘relevant infrastructure’ traversing the site. building or structure.
Note: ‘Relevant infrastructure’ is as defined in the Queensland
Development Code, MP 1.4 – Building over or near relevant
infrastructure.
Advisory Notes
3. Advisory Notes
3.01 Infrastructure charges
Payment of Levied Charges is required in accordance with Unitywater’s Infrastructure
Charges for water supply and sewerage.
Unitywater may give the Applicant an Infrastructure Charges Notice within 10 business days
after the giving of a Decision Notice that includes a Connection Approval aspect.
From 1 July 2014, all Infrastructure Charges for water supply and sewerage infrastructure
networks controlled by Unitywater, regardless of when the Infrastructure Charges Notice was
issued, shall be paid directly to Unitywater.
3.02 Works in roads
Where works associated with the Connection Application results in works to be carried out in
a publicly controlled place, e.g. roads, it is the Applicant’s responsibility to gain the
necessary approvals from the relevant authority e.g. council, Department of Transport and
Main Roads. It is the Applicant’s responsibility to ensure that it has all necessary consents
and approvals to carry out any works in a publicly controlled place prior to starting any such
works.
The approval for works in roads must be attached to the Request for Pre-start Meeting form.
3.03 State Assessment and Referral Agency (SARA)
This approval relates to Connection Application requiring approval under the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009 only. It is the Applicant’s
responsibility to ensure any works requiring approval/s under the Planning Act 2016 (Qld)
are obtained from State Assessment and Referral Agency (SARA) prior to the request for a
Pre-start Meeting.
A&C - Decision Notice Template – Connection Approvals Page 6 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 7
Use limitations for private fire hydrant booster pumps directly connected to Unitywater’s
3.04
water supply network
Unless permitted by this water approval, the use of private pressure boosting pumps for fire
flow purposes that are proposed to connect directly to Unitywater’s water supply mains may
not be permitted by Unitywater. Enquire with Unitywater’s Development Services team prior
to lodging a connection approval application to ascertain the appropriate requirements in
relation to a proposal to directly connect pressure boosting pumps to the water supply
network.
Unitywater does not take any responsibility for the performance of the water supply network
required by the Developer in its demonstration of compliance with QFES standards for
building fire protection installations including, but not limited to, a fire brigade booster
assembly or a fire hydrant pumpset connected to an internal and external(onsite) fire
hydrant system.
Instead, this is the responsibility of the Developer and its representatives, such as a
(suitably experienced and qualified) fire and hydraulic consulting engineer.
To assist the Developer and its representatives in its determination of suitability of the
proposed direct fire pumpset connection and fire hydrant system to meet QFES
requirements, Unitywater offers a service that provides outputs of modelled network
performance at the site property boundary. A link to ‘Application for Hydraulic Model
Pressure and Flow Information - F8578 ‘ can be found on Unitywater’s webpage:
https://www.unitywater.com/faults-and-emergencies/water-supply-problems/water-pressure-
issues.
3.06 Level of service
The Water and Sewerage Services Code for Small Customers in South East Queensland
and the Unitywater’s Customer Service Standard specify the level of service for Unitywater’s
water supply and sewerage services.
3.07 Other services
It is the Applicant’s responsibility to acquire the necessary approvals from the relevant
authority or service provider to alter or relocate their service.
3.08 Other approval requirements and compliance with all laws
This approval only authorises the connection to Unitywater’s infrastructure. This approval
does not remove the need for other approvals in order to carry out the necessary work for
the development.
For example, the Applicant should consider the need to comply with relevant standards and
obtain approvals for impacts arising from sediment and erosion control, flora and fauna and
traffic/roads, including traffic management etc.
The Applicant is responsible for obtaining all necessary approvals for its development and
complying with all laws including all environmental laws.
3.10 No works authorised
The applicant is not to carry out property infrastructure works or network works that are not
approved by Unitywater, until after the necessary phase of water approval is granted.
3.11 Design and construction
Prior to network works approval, any water supply and sewerage works must be designed in
accordance with the South East Queensland Water Supply and Sewerage Design and
Construction Code, Unitywater’s Connections Administration Manual, or Unitywater’s
Accreditation and Certification Manual, and any other matter Unitywater considers to be
relevant to the connection or establishment of its water services or sewerage services.
A&C - Decision Notice Template – Connection Approvals Page 7 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 8
3.13 Third party property
If any infrastructure authorised by this approval is to be constructed on property that is not
owned or controlled by the Applicant, it is the Applicant’s or developer’s responsibility to gain
the necessary consents to install that infrastructure.
3.14 Errors and omissions
This approval shall not be taken to mean that the drawings have been checked in detail,
Unitywater accepts no responsibility whatsoever for the survey information, the design, or
for the accuracy of any information or detail contained in the drawings and specifications.
Where errors or omissions occur in the design drawings or specifications, or where works do
not conform to or meet Unitywater standards, the Applicant shall be responsible for
arranging rectification to comply with those standards at no cost to Unitywater.
Where approved drawings contain insufficient detail, or do not contain details of works that
are either necessary or associated with the development then these works shall be
designed, approved and constructed to Unitywater standards, as required by Unitywater.
Unitywater reserves the right to request amendment of the approved drawings or request
further information should this become necessary. Only the approved drawings shall be
used for construction.
3.15 Existing water meter(s)
The Applicant is advised that if the existing water meter currently serving the property will no
longer be required, an application (Standard Connection Application Request) must be
made to Unitywater to disconnect the meter.
A fee is applicable for the disconnection of services.
Refer to Unitywater Fees and Charges schedule at: Pricing, fees and charges.
3.17 Internal Review and Appeal Rights
You have a right to apply for an internal review of the decision including the conditions
attached to this decision. Under the South-East Queensland Water (Distribution and Retail
Restructuring) Act 2009 an appeal against a decision must be, in the first instance, by way of
an application for internal review.
The attached information sheet provides information about the internal review and appeal
processes, including how to apply and the details of the information required to be submitted
with your application.
Please note that any application for an internal review of this decision must be made within
30 business days after the date the application was decided (see Decision Details on Page
1).
It is advised that prior to the submission of a formal application for internal review, the
applicant should contact the responsible Unitywater officer to discuss the issues of concern.
This can be done by emailing [email protected] and it needs to be made
clear in the email content that this initial enquiry is not a formal application for internal review,
but instead is a preliminary enquiry to discuss issues that have been conditioned in the
Unitywater Decision Notice and/or Infrastructure Charges Notice. The Unitywater officer and
Development Services may consider changes to the Decision Notice and/or Infrastructure
Charges Notice without the need of an Internal Review. This preliminary enquiry and
consultation does not have an effect on the 30 business days of the ‘decision period’ and if
the issue cannot be resolved within this time, the only recourse of Internal Review is as
explained in the process above.
A&C - Decision Notice Template – Connection Approvals Page 8 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 9
Approved Documents and Drawings
The approved documents and drawings for this decision notice are listed in the following table.
Table of Approved Documents and Drawings
Document / Drawing No.
Document / Drawing Title Prepared by Date
- (Revision)
Network Demand Assessment
Covey
- Network Demand Assessment 21/03/2023
Associates
Development Plans
2200853-01 (C) Proposed Reconfiguration Plan AXIS Surveys 08/12/2022
Civil Design Drawings
Covey
213029 C400 (C) Sewer and Water Connection Plan 30/03/2023
Associates
Statement of Alternative Solutions
A&C - Statement of Alternative Covey
- 17/04/2023
Solutions Associates
Yours sincerely,
Development Certification
Unitywater
A&C - Decision Notice Template – Connection Approvals Page 9 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 10
INFORMATION SHEET – REVIEWS AND APPEAL PROCESS
Division 1 Preliminary
99BRAW Meaning of interested person and original decision
(1) An interested person for this part is an applicant under this chapter who—
(a) has been given a decision notice; or
(b) if the period during which the application was required to be decided under the relevant connections policy has
expired—has not been given a decision notice; or
(c) has had 1 or more of the following charges levied for a connection, other than for a standard connection—
(i) a connection charge;
(ii) a property service works charge;
(iii) a charge under an infrastructure charges notice; or
(d) has been given a notice under section 99BRDG about a conversion application, or there is a deemed refusal for
the application.
(2) Each of the following is an original decision—
(a) the decision or action for which a decision notice was given (an approval decision);
(b) if the period during which an application was required to be decided under the connections policy has expired—
the failure to give a decision notice for the application (a failure to decide);
(c) the decision to levy a charge for a connection mentioned in subsection (1)(c)(i) or (ii) (a charge decision);
(d) the decision to give an infrastructure charges notice;
(e) the refusal or deemed refusal of a conversion application (a conversion decision).
(3) However, for an original decision under subsection (2)(a), an interested person cannot appeal a water approval
condition that became a condition under section 99BRAM.
99BRAX Other definitions for pt 4 In this part—
charge decision see section 99BRAW(2)(c).
conversion decision see section 99BRAW(2)(e).
deemed refusal, for a conversion application, means a refusal of the application that is taken to have happened if a
decision is not made within the required period for the application.
required period, for a conversion application, see section 99BRDF(6).
standard appeal period, for an appeal under division 3 or 4, means—
(a) if the notice for the review decision is given to the interested person—within 20 business days after the notice was
given; and
(b) otherwise—within 20 business days after the review decision is taken to have been made under section
99BRBC(4).
Division 2 Internal reviews
99BRAY Appeal process starts with internal review
An appeal of an original decision, other than an appeal against a compliance notice, must be, in the first instance, by
way of an application for internal review.
99BRAZ Who may apply for review
(1) An interested person for an original decision may apply for an internal review of the decision (an internal review
application).
(2) An internal review application may be made only to the chief executive officer of the relevant distributor-retailer
(the reviewer).
99BRBA Requirements for making internal review application
An internal review application must be—
(a) accompanied by a statement of the grounds on which the applicant seeks the review of the decision; and
(b) supported by enough information to enable the reviewer to decide the application; and
(c) made within 30 business days after the day—
(i) for a failure to decide or a deemed refusal of a conversion application—the relevant decision was required to be
made; or
(ii) otherwise—the original decision is made.
99BRBB Review decision
(1) The reviewer must, within the review decision period—
(a) review the original decision the subject of the application; and
(b) make a decision (the review decision) to—
(i) confirm the original decision; or
(ii) amend the original decision; or
(iii) substitute another decision for the original decision.
(2) The application must not be dealt with by—
A&C - Decision Notice Template – Connection Approvals Page 10 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 11
(a) the person who made the original decision; or
(b) a person in a less senior office than the person who made the original decision.
(3) Subsection (2)—
(a) applies despite the Acts Interpretation Act 1954, section 27A; and
(b) does not apply to an original decision made by the chief executive officer.
(4) If the review decision confirms the original decision, for the purpose of an appeal, the original decision is taken to
be the review decision.
(5) If the review decision amends the original decision, for the purpose of an appeal, the original decision as amended
is taken to be the review decision.
(6) In this section— review decision period means—
(a) 15 business days after receiving an internal review application; or
(b) another period agreed to between the distributor-retailer and the applicant.
99BRBC Notice of review decision
(1) The reviewer must, within 5 business days after the review decision period ends, give the applicant notice of the
review decision (a review notice).
(2) The review notice must state the reasons for the review decision.
(3) If the review decision is not the decision sought by the applicant, the notice must also state the applicant may,
within 20 business days after the review notice is given—
(a) appeal against the decision to a building and development committee; or
(b) appeal against the decision to the Planning and Environment Court.
(4) If the reviewer does not comply with subsection (1), the reviewer is taken to have made a decision confirming the
original decision.
99BRBD Internal review stops particular actions
(1) If an internal review is started under this division, any work under a water approval must not be started until the
review is decided or withdrawn.
(2) Despite subsection (1), if the reviewer is satisfied the outcome of the review would not be affected if the work is
started before the review is decided, the reviewer may allow the work to start before the review is decided.
Division 3 Appeals to a building and development committee
99BRBE Appeals about applications for connections—general
(1) This section applies to an applicant for a connection if—
(a) for the application for a connection, the land to which the connection relates is subject to a development application
mentioned in the Planning Act, section 519 or 522; and
(b) the applicant applied for internal review of an approval decision or failure to decide; and
(c) the review decision is not the decision sought by the applicant.
(2) The applicant may appeal to a building and development committee against any of the following—
(a) a refusal, or an approval in part, of an application;
(b) a water approval condition;
(c) another matter stated in the approval.
(3) The appeal must be started within the standard appeal period.
99BRBF Appeals about applications for connections—particular charges
(1) This section applies to an applicant for a connection if—
(a) the applicant applied for internal review of a charge decision or a decision to give an infrastructure charges notice;
and
(b) the review decision is not the decision sought by the applicant.
(2) The applicant may appeal to a building and development committee about the review decision.
(3) The appeal may be made only on 1 or more of the following grounds—
(a) the decision involved an error relating to the application of the relevant charge;
(b) if the decision is the giving of an infrastructure charges notice—
(i) the decision involved an error relating to—
(A) the working out, for section 99BRCJ, of additional demand; or
(B) an offset or refund; or
(ii) there was no decision about an offset or refund; or
(iii) if the infrastructure charges notice states a refund will be given—the timing for giving the refund.
(4) To remove any doubt, it is declared that the appeal must not be about—
A&C - Decision Notice Template – Connection Approvals Page 11 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 12
(a) the relevant charge itself; or
(b) for a decision about an offset or refund for an infrastructure charges notice—
(i) the establishment cost of infrastructure identified in the distributor-retailer’s water netserv plan; or
(ii) the cost of infrastructure decided using the method included in the distributor-retailer’s infrastructure charges
schedule.
(5) The appeal must be started within the standard appeal period.
99BRBFA Appeals against refusal of conversion application
(1) This section applies to an applicant for a conversion application if—
(a) the applicant applied for internal review of the conversion decision; and
(b) the review decision is not the decision sought by the applicant.
(2) The applicant may appeal to a building and development committee against the review decision.
(3) The appeal must be started within the standard appeal period.
99BRBG Application of relevant committee appeal provisions
(1) The relevant committee appeal provisions apply, with any necessary changes, to an appeal under this division as
if a reference in the provisions to—
(a) an assessment manager were a reference to the distributor-retailer; and
(b) a development application were a reference to the application for the water approval; and
(c) a development approval were a reference to a water approval; and
(d) an appeal under the Planning Act were an appeal under this Act; and
(e) an infrastructure charges notice under the Planning Act were an infrastructure charges notice under this Act; and
(f) the period required under the Planning Act for lodging a document to start proceedings were a reference to the
period required under this Act for lodging a document to start proceedings.
(2) In this section— relevant committee appeal provisions means—
(a) the Planning Act, sections 536 to 537, 554 to 563, 564 (other than section 564(2)(d) and (e), 567, 569 and 569A;
and
(b) any definitions under that Act relevant to the sections mentioned in paragraph (a).
99BRBH Notice of appeal
(1) This section applies to an appeal under this division.
(2) The registrar of building and development committees must, within 10 business days after the day the appeal is
started, give written notice of an appeal under this division to the distributor-retailer.
(3) The notice must state the grounds of the appeal.
99BRBI Respondent for appeals
(1) This section applies to an appeal under this division.
(2) The distributor-retailer is the respondent for the appeal and may be heard in the appeal as a party to the appeal.
99BRBJ Who must prove case for appeals
In an appeal by the applicant under this division, it is for the applicant to establish that the appeal should be upheld.
99BRBK Registrar must ask distributor-retailer for material in particular proceedings
(1) This section applies to an appeal under—
(a) section 99BRBE if the applicant applied for internal review of a failure to decide; or
(b) section 99BRBFA if the applicant applied for internal review of a deemed refusal of a conversion application.
(2) The registrar of building and development committees must ask the distributor-retailer to give the registrar—
(a) all material, including plans and specifications, relevant to the application; and
(b) a statement of the reasons the distributor-retailer had not decided the application during the period for deciding
the application; and
(c) any other information the registrar requires.
(3) The distributor-retailer must give the material mentioned in subsection (2) within 10 business days after the day
the registrar asks for the material.
99BRBL Lodging appeal stops particular actions
(1) If an appeal is started under this division, any work under a water approval must not be started until the appeal is
decided or withdrawn.
(2) Despite subsection (1), if the building and development committee is satisfied the outcome of the appeal would
not be affected if the work is started before the appeal is decided, the committee may allow the work to start before
the appeal is decided.
A&C - Decision Notice Template – Connection Approvals Page 12 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 13
99BRBM Appeals may be combined with appeals under the Planning Act
(1) This section applies if—
(a) an appeal is started under this division; and
(b) an appeal is started under the Planning Act for a development application mentioned in section 99BRBE.
(2) The appeal under this division may be combined and heard with the appeal under the Planning Act.
Division 4 Appeals to the Planning and Environment Court
99BRBN Appeals about applications for connections—general
(1) This section applies to an applicant for a connection if—
(a) the applicant applied for internal review of an approval decision or failure to decide; and
(b) the review decision is not the decision sought by the applicant.
(2) The applicant may appeal against the review decision to the Planning and Environment Court.
(3) The appeal must be started within the standard appeal period.
99BRBO Appeals about applications for connections—particular charges
(1) This section applies to an applicant for a connection if—
(a) the applicant applied for internal review of a charge decision or a decision to give an infrastructure charges notice;
and
(b) the review decision is not the decision sought by the applicant.
(2) The applicant may appeal against the review decision to the Planning and Environment Court.
(3) An appeal under this section may be made only on 1 or more of the following grounds—
(a) the charge imposed by the distributor-retailer is so unreasonable that no reasonable distributor-retailer could have
imposed it;
(b) the decision involved an error relating to the application of the relevant charge;
(c) if the decision is the giving of an infrastructure charges notice—
(i) the decision involved an error relating to—
(A) the working out, for section 99BRCJ, of additional demand; or
(B) an offset or refund; or
(ii) there was no decision about an offset or refund; or
(iii) if the infrastructure charges notice states a refund will be given—the timing for giving the refund.
(4) To remove any doubt, it is declared that the appeal must not be about—
(a) the relevant charge itself; or
(b) for a decision about an offset or refund for an infrastructure charges notice—
(i) the establishment cost of infrastructure identified in the distributor-retailer’s water netserv plan; or
(ii) the cost of infrastructure decided using the method included in the distributor-retailer’s infrastructure charges
schedule.
(5) The appeal must be started within the standard appeal period.
99BRBOA Appeals against refusal of conversion application
(1) This section applies to an applicant for a conversion application if—
(a) the applicant applied for internal review of the conversion decision; and
(b) the review decision is not the decision sought by the applicant.
(2) The applicant may appeal to the Planning and Environment Court against the review decision.
(3) The appeal must be started within the standard appeal period.
99BRBP Appeals about water connection compliance notices
(1) This section applies if a person is given a compliance notice.
(2) The person may appeal against the decision to the Planning and Environment Court.
(3) The appeal must be started within 20 business days after the water connection compliance notice is given to the
person.
99BRBQ Application of relevant court provisions
(1) The relevant court appeal provisions apply, with any necessary changes, to an appeal under this division as if a
reference in the provisions to—
(a) an appellant were a reference to the applicant; and
(b) a respondent were a reference to the distributor-retailer; and
(c) a development application were a reference to the application for the water approval; and
(d) a development approval were a reference to the water approval; and
(e) an appeal under the Planning Act were an appeal under this Act; and
(f) an enforcement notice were a water connection compliance notice.
A&C - Decision Notice Template – Connection Approvals Page 13 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 14
(2) In this section— relevant court appeal provisions means—
(a) the Planning Act, chapter 7, part 1, divisions 11 to 13 other than sections 482 to 490, 493 and 495 (3) to (5); and
(b) any definitions under that Act relevant to the provisions mentioned in paragraph (a).
99BRBR Notice of appeal to other parties
(1) The applicant must give notice of the appeal to the distributor-retailer.
(2) The notice must be given within 10 business days after the appeal is started.
(3) The notice must state the grounds of the appeal.
99BRBS Stay of operation of water connection compliance notice
(1) If the applicant gives a notice of appeal about a water connection compliance notice, the operation of the
compliance notice is stayed until the earliest of the following to happen—
(a) the Planning and Environment Court, on the application of the distributor-retailer, decides otherwise;
(b) the appeal is withdrawn;
(c) the appeal is dismissed.
(2) However, subsection (1) does not apply if the compliance notice is about—
(a) a work, if the water connection compliance notice states the entity believes the work is a danger to persons or a
risk to public health; or
(b) stopping the demolition of a work; or
(c) clearing vegetation on freehold land; or
(d) the removal of quarry material allocated under the Water Act 2000; or
(e) extracting clay, gravel, rock, sand or soil, not mentioned in paragraph (d), from Queensland waters; or
(f) works the assessing authority reasonably believes is causing erosion or sedimentation; or
(g) works the assessing authority reasonably believes is causing an environmental nuisance; or
(h) action required to stop damage or further damage to the distributor-retailer’s water infrastructure.
99BRBT Respondent for appeals
The distributor-retailer is the respondent for the appeal and may be heard in the appeal as a party to the appeal.
99BRBU Who must prove case for appeals
In an appeal by the applicant under this division, it is for the applicant to establish that the appeal should be upheld.
99BRBV Lodging appeal stops particular actions
(1) If an appeal, other than an appeal under section 99BRBP, is started under this division, any work under a water
approval must not be started until the appeal is decided or withdrawn.
(2) Despite subsection (1), if the Planning and Environment Court is satisfied the outcome of the appeal would not be
affected if the work is started before the appeal is decided, the court may allow the work to start before the appeal is
decided.
99BRBW Appeals may be combined with appeals under the Planning Act
(1) This section applies if—
(a) an appeal is started under this division; and
(b) an appeal is started under the Planning Act for a development application which relates to land the subject of the
application of a water approval.
(2) The appeal under this division may be combined and heard with the appeal under the Planning Act.
FOR MORE INFORMATION OR THE LATEST VERSION PLEASE REFER TO:
South-East Queensland Water (Distribution and Retail Restructuring) Act 2009
A&C - Decision Notice Template – Connection Approvals Page 14 of 14
Document No: F10716 Revision No: 7 Last Review Date: 10/01/2022 (Minor amend 23/02/2023) Next Review Date: 10/01/2024
Section 15
ZZZ A&C - Network Demand Assessment (Pilot Version 1) Privacy Statement - Any personal information provided in this document will be collected, used and disclosed in accordance with Unitywater’s Information Privacy Policy available on the Unitywater website. How to name your files and attachments: To assist Unitywater in processing submissions efficiently, it is advised that supporting document file names are titled in accordance with the convention as presented in reference document A&C Recommended Document Filing Name Convention, available for use on Submit a Certification Package webpage, under the Pre-requisite and pre-lodgement advice (Certifiers only) banner. When completed please attach the generated PDF of this Network Demand Assessment to you Accredited Certified Package Submission. Use of this form by Registered Certifiers to generate a Network Demand Assessment record. This Network Demand Assessment form must be produced by a Major or Minor Connections Certifier in accordance with requirements of Unitywater Accreditation and Certification Manual as a record of assessment. The form requires entry by the Certifier of information specific to the development and existing network under subheadings: 1. Network Fire Fighting Demand Assessment 2. Proposed Network Demand 3. Planned Network Demand 4. Network Demand Assessment The Network Demand Assessment should in most cases demonstrate that Proposed Network Demand does not exceed Planned Network Demand. Any exceptions to this outcome must be agreed to in writing by Unitywater Network Planning. To obtain Network Planning advice, use pre-lodgement advice 'A&C Eligibility Request - Exceeding Unitywater Planning Assumptions (online form)'. If unsure what the applicable Minimum Standard of Service for Fire Fighting is for the network where the development is proposed, please request this information using the online application form F8578 - Application for Hydraulic Model Pressure and Flow Information. Existing Approval Details: Document Reference No.
Section 16
Assigned by Registered Certifier Property Details: Property Address. 41 Picture Point Cres Registered Certifier to add details Real Property Description(s). Lot 2 RP220514 e.g. Lot 123 on SP456789 Registered Certifier to add details Project Details. 1 into 2 reconfiguration of a lot. Registered Certifier to add project details Registered Certifier Details: Name. Registration No. Shane Rynne ACR/MAJ 2020-113 [email protected] Land Use Category (select multiple Categories if applicable). Schedule 2 for RAL Schedule 3 for MCU You have indicated Schedule 2 for RAL, please supply details. Current land use = DwellHouse For multiple land uses, identify land use for which the greatest Minimum Standard of Service, Fire Fighting will apply. Proposed Type of Land Use, Minimum Standard of Service, Fire Fighting. Urban Detached/Attached Residential (≤ 3 storeys) - 15 L/s for 2hrs w background Demand Existing Network, Minimum Standard of Service, Fire Fighting. Urban Detached/Attached Residential (≤ 3 storeys) - 15 L/s for 2hrs w background Demand Please supply any additional information .
Section 17
1. Network Fire Fighting Demand Assessment: Is Proposed Type of Land Use Minimum Standard of Service (MSoS), for Fire Fighting ≤ Existing Network MSoS, for Fire Fighting? Yes No Unsure You have selected Yes, please proceed with this assessment. 2. Proposed Network Demand: Use calculator below based on Unitywater Netserv Plan Part A, Appendix B – Schedule of Works, section 2.2 Land Use Assumptions. If this calculator is not suitable for your development (EP Demand Rates are determined under a different mechanism) please attach a document showing details of your calculations. Does the development use a different EP mechanism to calculate the proposed development demand, e.g. a superseded Planning Scheme Policy (PSP) Trunk Infrastructure Contributions under an Infrastructure Agreement? Yes No To complete the section titled Demand below, I have referred to Unitywater Netserv Plan Part A, Appendix B – Schedule of Works, section 2.2 Land Use Assumptions. I acknowledge that the Total Proposed Demand calculated will be supported by a development plan. For RAL, this is a plan of subdivision showing the number of lots and the area of each lot. For MCU Residential, this is a plan showing the number of detached and attached dwellings. For MCU Non-residential (commercial, industrial, other), this is a plan showing Gross Floor Areas for different proposed land uses and Areas Impervious to Stormwater. Turn on the following Layers in Netserv Plan Planning Assumptions mapping tool: To obtain the required details for the next section - 'Planned Demand for each Property' you will need to turn on the following Layers from the Layer List in the legend to the right of the mapping tool. Turn the following Layers on. Addresses (Relevant Council) Water Demand Forecasts (Relevant Council) Sewer Demand Forecasts 2016 ABS Census SA2 Boundaries
Section 18
(Relevant Council) Development Approval Number (Relevant Council) Local Planning Area Demand Assumptions (Relevant Council) Zoning & Density Assumptions Cadastre (Relevant Council) Development Constraints (Relevant Council) Land Use Unitywater Operational Area Demand: Netserv Plan Part A, Appendix B – Schedule of Works, section 2.2 Land Use Assumptions: Item 1 Select 2016 ABS Census SA2 Boundaries Number SA2_MAIN11 and Name SA2_NAME11 Noosa Heads - 316051434 Is this Residential ? Yes No Select Residential Dwelling Type. Detached Dwelling EP for this Detached Dwelling is - 2.29 Enter EP from above. Number of Residential Dwellings. Total Proposed Residential EP. 2.29 2.0 4.58 Totals, Proposed Demand: Total Combined Residential EP. 4.58 Total Combined Non-Residential EP. 0.00 Total Combined Residential / Non-Residential EP. 4.58 Total Combined GFA. 0.00 3. Planned Network Demand: To determine total planned demand for the land on which the development is proposed, use Unitywater Netserv Plan Part A, Appendix B – Schedule of Works, section 2.3.Demand Forecast Assumptions; Attachment 1 Development Densities - Sunshine Coast Council area; Attachment 2 Development Densities - Noosa Shire Council area; and Attachment 3 Development Densities - Moreton Bay Regional Council
Section 19
area and the Netserv Plan Planning Assumptions mapping tool, using the relevant Layers (e.g. Council Water Demand Forecasts or Council Sewer Demand Forecasts) and Residential EP and Non-residential EP data for the Planned Demand Year. For further help refer to User Training Guide available in the header of the mapping tool. Planned Demand Year Determination: Please note that Unitywater Infrastructure Planning & Development Demand Forecasting Team uses the term 'Demand Forecast Cohort' interchangeably with 'Planned Demand Year'. Important: For the 2022 calendar year, the Planned Demand Year is 2026. Planned Demand Year = year of anticipated water approval + 4 year approval period = Planning Horizon Year, rounded up to next 5 year increment where in between 5 year steps. Planned Demand Years are 2026, 2031, 2036, 2041, 2046, and 2051. Example 1 Year application submitted: 2022 Year of anticipated water approval: 2022 Add 4 year approval period: 2026 Planning Horizon Year: 2026, no rounding up to next 5 year increment required Planned Demand Year: 2026 Example 2 Year application submitted: 2023 Year of anticipated water approval: 2023 Add 4 year approval period: 2027 Planning Horizon Year: 2027, rounded up to next 5 year increment Planned Demand Year: 2031 Planned Demand for each Property: Property 1 Addresses. 41 Picture Point Cres Cadastre. Lot 2 RP220514 Relevant Council. (if applicable) Noosa Shire Council Council Development Approval Number. NA
Section 20
(Relevant Council) Water Demand Forecasts, ResidentialEP(Year). 16.38 (Relevant Council) Water Demand Forecasts, Non- residentialEP(Year). (Relevant Council) Sewer Demand Forecasts, ResidentialEP(Year). 16.38 (Relevant Council) Sewer Demand Forecasts, Non- residentialEP(Year). (Relevant Council) Zoning & Density Assumptions. NSAHNH1.1 e.g. ResSubNeigh2 Totals, Planned Demand: Water Demand Forecasts ResidentialEP(Year). 16.38 Water Demand Forecasts, Non-residentialEP(Year). 0.00 Sewer Demand Forecasts, ResidentialEP(Year). 16.38 Sewer Demand Forecasts, Non-residentialEP(Year). 0.00 4. Network Demand Assessment: Total Combined Proposed Residential / Non-Residential EP. 4.58 Total Planned waterEP(Year). 16.38 Total Planned SewerEP(Year). 16.38 Water Network Demand Assessments has been calculated at: 27.96% The Total Planned Water Demand has been calculated to be ≤ 110% Total Planned Water Demand,
Section 21
please proceed with this assessment.
Sewer Network Demand Assessments has been calculated
at:
27.96%
The Total Planned Sewer Demand has been calculated to be ≤ 110% Total Planned Sewer
Demand, please proceed with this assessment.
Upload any required document here.
Registered Certifier Signature:
Signature. Date.
21/03/2023
You are about to complete the A&C - Network Demand Assessment. Upon pressing submit, an email of
the A&C - Network Demand Assessment application will be sent to the Registered Certifier. Please save
this email as a copy for your records.
Section 22
Area
Not Surveyed
25
.0 5
40 39.
.5
40
.0
41
24 .5
41
.0
42
.5
42
.0
43
.5
43
20
.0
44
5
.0 44.
45
.5
.5 a ll r a ll
45
31 se
Dentation g
W be W
im ing
2 .0 Veg
e ini
n
g T tain
3 ta in .0
.5 Re ist Re 46
32 r Ex per
pe ee
3 .0 l ee Sl Gutterline
3 rS .5
.5 be 46
33 i m el 43.5
.0 T r Lev Steps
4 in
g Floo .56
3 ist RL 46
Timber Deck
4 .5 Ex
42.5 42.0
3
43.0Concrete
44
Verandah
.0 17
(Above)
5 47.0
.0
3 el s
.5 r Lev Step Roof Peak
Retaining Wall
Existing Block
35 Floo .62 RL 54.99
6
.0 RL 4 r ting r
36 de Exis Sleepe
k Un .0 er all Existing
.5 Dec ouse 45 Timb ining W 15
36 Landing
Concrete H
.5 Reta Sewer M/H Highset
.0 45 RL 47.35
Dwelling
3 7 .5 W
14
37 Existing
SE16
Floo 4.12
Steps
RL 4
3 8.0
.0 Highset
46 48.0
3
r Le
39 8.5
Dwelling 13
.0
v el
.5 12
Ste
.5
39
ce
W
.5 .0
40
.0
SE
p
41 41
en
40
s
el er F
r Lev 48.5
46 5
Floo .70 ps
.0
.0
.
Ste
45
.0
Timb
455
6
42 .5 L 4
.
R
44
4 2 .0 elin
e r Lev
el
crete W Floo .97
43 . 5 E av enc
e Con
SE 4 8
43 lass F R L
0 G
Concrete
. 49
44 Dec
k
Patio
.0 )
41 el 11 ote
r Lev (See n
Gar
Floo .64 ocation te)
Line L
Poo
6 W
RL 4 r o
d
SE age imate W
a te n
en
ting ee
l
G r Gate Exished Approx n (S
Fen
crete a
Con ting S ng
isti Wall catio
Gat
Exished o
c
x L
Line
5 E ck W
e
40 S
49. Br i
e
BN
el nce 10 t eN
W
r Lev a
Tim ck Ret
Sewer M/H e im
Blo
rF g
Floo .05 be stin l ter W ower Po5le pprox
Gar
RL 40.96 /H
ber ainin
g er M
SewLocated RL 4
9 Timn Exi Wal ter
Me P 6401 A TBM
opin
Con
39 #
d
C o rick e Screw in Bitumen
No t
F en g W
M
en
SEW
W
B
SEW
c
W RL 49.366 AHD
ce o all
rete
Gar
SEW
Gar
nE
SEW
Existaining
l
d
Poo
Re
en
den Block
SEW note)
xisti
Floor Level 7 W E
Con
38 8
ting Wall
ee OH
n (S
n
t io RL 49.01
g
Loca
cret
er Line Sewer M/H 9
e
W
ate Sew RL 46.05 37
Gutterline E
roxim 36 OH
App ak
f Pe W
Roo 9.14
35 y
RL 4 6 ve wa
Dri E
Wcrete OH49 SHANE RYNNE
ting Co
n .5
Exished d en
S Gar
Existing
Roo
f 4 W E
22/03/2023
Highset 5
Dwelling OH
3
2
49.0
W
Roof Peak
E
RL 50.88
e OH
1 W enc
be rF
Tim
47.5
ll
g Wa
48.5
in E
etain
ck R W OH
isti ng Blo
x a
E lstr
Te er P
ole
Pow207237
#
W
48.0
TBM
Screw in Kerb
RL 48.084 AHD
Axis Surveys Pty Ltd ABN 94 010 743 174
Trading as: ACN 010 743 174
AXlS
SURVEYS
UNIT 5, 23 OVERLORD PLACE, ACACIA RIDGE, QLD 4110
2200853-01 C Ph (07) 3363 8100, www.axissurveys.com.au
Section 23
IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO CONTACT THE RELEVANT
AUTHORITIES TO CONFIRM THE LOCATION OF
'
° 20 ALL EXISTING SERVICES PRIOR TO THE
29 COMMENCEMENT OF EXCAVATION
.5
39
(50.238)
31.5 . 0
40
32.0
5
40.
51
.1 0'
39 9°2
32.5 2
33.0 41.0
33.5
41.5
34.0 .65 SEWER MS
13 Dense 42.0
34.5
R.L 42.00
Vegetation IL 41.00
35.0 42.5
LEGEND
Pe
35.5 Foungd PROPOSED PROPOSED LOT 51
0 EASEMENT 43.0 PROPOSED SEWER
36. 5
43.
EXISTING SEWER
2
36.5 S1 EXISTING WATER MAIN
ER
37.0 VC-U
SEW
44.
0
50 P INDICATIVE BUILDING
37.5
Ø1
NEW 3m LOWER FLOOR
5
38.
0 44. PROPOSED EASEMENT
5
3m
38.
163°12'40"
0
50.238
45.
43.0 CONTOUR AND LABEL
0
39. PROPOSED LOT 52
0
DENOTES OUTLINE
.5 42.
5 OF LEVEL ABOVE
HC 43.
39. 0 43.0 5 5
. 45.
40 40.5
42
44.0
0
41. 46.
0
5
41.
EX SEWER MH
R.L 40.96 (SURVEY)
338°30'
31.673
0 46.5
4 .
A
IL 39.99 (RECORDS) 2
338°30'
31.673
42.5
//
45.0
//
//
3 BEND
RL 48200
//
43.0
//
Sewer M/H 45.5
//
EXISTING MANHOLE TO REMAIN.
//
.5
//
HC 43 .5 EXISTING HOUSE SEWER DRAIN TO REMAIN
//
44 45.0 45.5 .0
//
47
//
46 .0
44.0
//
1 // // // // // // // // // // // // // // // // // // // // // //
//
// // // //
1
// // // // // // // // // // // //
// // //
MH2 1
//
Existing
//
EX1
//
//
EXISTING
46.0
//
S1
The text continues on section 24.
Used in these records
Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.