Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads - · RAL22/0021
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
Calculation Details
Infrastructure charges ICN-002186
notice number:
Connection approval: 2023022875
Stage reference: 2023022875
Stage name: S0
Type of approval: Connection Application
Applicable charging
instrument: Unitywater Infrastructure Charges Schedule (No. 1) 2019
1. How the levied charge was worked out
Additional demand
Proposed Existing Additional
Demand Demand Demand
Land Use Category Demand Unit (units) (units) (units)
Detached House Item 2 1 1
Total charge
Net Applied Adopted
Demand Charge^ Charge
Land Use Category Demand Unit (units) ($/unit) ($)
Sewerage
Infrastructure
Charge
Detached House Item 1 $7,679.10 $7,679.10
Water
Infrastructure
Charge
Detached House Item 1 $5,119.41 $5,119.41
Total Charge $12,798.51
^Refer to Unitywater’s infrastructure charging instrument for details on working out the applied adopted charge.
Credit adjustment
Value of Existing Demand Credit
Credit Credit Adjustment
Description ($) ($) ($)
Total Credit Adjustment $0.00
Levied charge
Total Charge Total Credit Levied Charge
($) Adjustment ($) ($)
$12,798.51 $0.00 $12,798.51
www.unitywater.com Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.