Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads - · RAL22/0021

of 34

Text shows just the words. Original shows the document exactly as it was published.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

    3.13       Third party property
               If any infrastructure authorised by this approval is to be constructed on property that is not
               owned or controlled by the Applicant, it is the Applicant’s or developer’s responsibility to gain
               the necessary consents to install that infrastructure.
    3.14       Errors and omissions
               This approval shall not be taken to mean that the drawings have been checked in detail,
               Unitywater accepts no responsibility whatsoever for the survey information, the design, or
               for the accuracy of any information or detail contained in the drawings and specifications.
               Where errors or omissions occur in the design drawings or specifications, or where works do
               not conform to or meet Unitywater standards, the Applicant shall be responsible for
               arranging rectification to comply with those standards at no cost to Unitywater.
               Where approved drawings contain insufficient detail, or do not contain details of works that
               are either necessary or associated with the development then these works shall be
               designed, approved and constructed to Unitywater standards, as required by Unitywater.
               Unitywater reserves the right to request amendment of the approved drawings or request
               further information should this become necessary. Only the approved drawings shall be
               used for construction.
    3.15       Existing water meter(s)
               The Applicant is advised that if the existing water meter currently serving the property will no
               longer be required, an application (Standard Connection Application Request) must be
               made to Unitywater to disconnect the meter.
               A fee is applicable for the disconnection of services.
               Refer to Unitywater Fees and Charges schedule at: Pricing, fees and charges.
    3.17       Internal Review and Appeal Rights
               You have a right to apply for an internal review of the decision including the conditions
               attached to this decision. Under the South-East Queensland Water (Distribution and Retail
               Restructuring) Act 2009 an appeal against a decision must be, in the first instance, by way of
               an application for internal review.
               The attached information sheet provides information about the internal review and appeal
               processes, including how to apply and the details of the information required to be submitted
               with your application.
               Please note that any application for an internal review of this decision must be made within
               30 business days after the date the application was decided (see Decision Details on Page
               1).
               It is advised that prior to the submission of a formal application for internal review, the
               applicant should contact the responsible Unitywater officer to discuss the issues of concern.
               This can be done by emailing [email protected] and it needs to be made
               clear in the email content that this initial enquiry is not a formal application for internal review,
               but instead is a preliminary enquiry to discuss issues that have been conditioned in the
               Unitywater Decision Notice and/or Infrastructure Charges Notice. The Unitywater officer and
               Development Services may consider changes to the Decision Notice and/or Infrastructure
               Charges Notice without the need of an Internal Review. This preliminary enquiry and
               consultation does not have an effect on the 30 business days of the ‘decision period’ and if
               the issue cannot be resolved within this time, the only recourse of Internal Review is as
               explained in the process above.




A&C - Decision Notice Template – Connection Approvals                                                                  Page 8 of 14
Document No: F10716        Revision No: 7        Last Review Date: 10/01/2022 (Minor amend 23/02/2023)   Next Review Date: 10/01/2024

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Unity Water Decision Notice Package 2023022875S0 - ACP - 41 Picture Point Cres Noosa Heads -.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.