Original source · versioned page text
Delegated Report - Code - Planning MCU20 0021 [As Published]
N-DA-12F - Sections, prepared by Roger Parkin Project 09/10/2020
Architects
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed within this Decision Notice. The Approved Plans must be
amended to incorporate the amendments listed within this Decision Notice and resubmitted
to Council prior to the issue of any Development Permit for Operational Works.
*(Refer to Advisory Note)
Gross Floor Area
4. The proposed development must not exceed the following gross floor area:
Lot 121 RP 70296: 264.2m2 max.
Lot 1 RP 117315: 271m2 max.
In this regard, the approved plans must be amended and resubmitted to Council prior to the
issue of any Development Permit for Operational Works.
Setbacks
5. The development (including any balustrading on the upper level balcony/deck areas) must
comply with the following standard side boundary setbacks:
a. 1.5m setback up to 4.5m height;
b. 2m setback between 4.5m - 7.5m height; and
c. 2m plus 0.5m for every 3m above 7.5m height or part thereof
6. The proposed pergolas over the front entry gates are not approved and must be removed
from the plans.
7. With regards to the above requirements, the approved plans must be amended and
resubmitted to Council prior to the issue of any Development Permit for Operational Works.
Pool Area and Pool Fencing
8. The front setback area (pool area) must be constructed and comprise dense landscaping in
such a way that any required pool fencing is not visible from the streetscape.
Currency Period
9. The Currency Period for this development approval lapses if the use has not happened by
29 October 2026, unless an application to extend the currency period is approved by
Council.
Building Height
10. The maximum height of the development must not exceed 8 metres above the finished
ground level and the natural ground level, except for the clerestory/clearstorey roof forms
which must not exceed 8.45 metres in height from natural ground level.
11. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Performance Bond
12. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
the issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Page 16 of 24
Document Set ID: 21107969
Version: 17, Version Date: 30/10/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.