Original source · versioned page text
Information Request MCU19 0007
Officer: Lisa Pienaar Direct Telephone: 07 53296514 Our Reference: MCU19/0007 Your Reference: n.a 5 February 2019 The Mcfarlan Group Pty Ltd C/- Pivotal Perspective Pty Ltd 59 Mary Street 4/57 Mary St NOOSAVILLE QLD 4566 [email protected] Dear Sir/Madam Information Request Planning Act 2016 I refer to your application and advise that Council requires further information to satisfactorily assess the proposal. application details Application No. MCU19/0007 Street Address: 26 Project Ave Noosaville Qld 4566 Real Property Description: Lot 200 RP 913612 Planning Scheme: The Noosa Plan (8 June 2018) INFORMATION REQUIRED The information requested is set out below: Issue - Carparking Dimensions of carpark spaces are not shown on the proposal plans. Information Required Provide details of proposed carparking spaces demonstrating compliance with 2890.1 Issue There are concerns regarding conflict between the opened gate to the site and the proposed parking spaces, vehicles movement and proposed landscaping. Information Required Provide an updated plan of the proposed development site (carparking and landscaping) which considers the constraints of an opened gate to the site. Issue The proposal plans show a future extension to the existing building. It is not clear if this will be an extension to the gym use or if it will be used for another purpose/tenancy. Currently, the proposal plan ‘depicts’ enough car parks (13.5) for 19 persons capable of being entertained (or 20 as noted in another section of the proposal report – please clarify) and staff. However, based on gross floor area the development would have a shortfall of car spaces. Information Required Clarify what the future extension space on the proposal plans will be used for and at what stage and if it will result in more people attending the site. Address car parking requirements if required. Issue It is not known how Stormwater management will occur for the fully developed site (including extension). Information Required Provide stormwater management plan for the developed site. due date for response to information request The due date for providing the requested information is 6 May 2019. Please advise Council of your response to this information request in accordance with section 13 of the Development Assessment Rules. If you do not provide a response before the due date, it will be taken as if you have decided not to respond to the information request and Council will continue with the assessment of your application. other details You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online Services” page can be accessed via "Quick Links" on the left hand side of the screen. Should you have any further queries in relation to the above, please do not hesitate to contact me on the number above. Yours faithfully, Lisa Pienaar Development Planner [word/footer1.xml] Page 2 of 2 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 2 [word/header1.xml] 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.