Preliminary Decision Notice - Approved by Delegation of Authority MCU21 0228
Officer: Georgina Schramm Direct Telephone: 07 53296569 Our Reference: MCU21/0228 & OPW21/0364 Your Reference: M2915P 4 April 2022 Altum Property Group C/- JFP Urban Consultants Pty Ltd T1.209 Kon-Tiki Business Centre Tower 1/55 Plaza Parade MAROOCHYDORE QLD 4558 [email protected] Dear Sir/Madam, Decision Notice Planning Act 2016 I refer to your application and advise that on 29 March 2022, Council decided to approve the application and issued a preliminary approval only, subject to conditions. Details of the decision are as follows: application details Application No: MCU21/0228 and OPW21/0364 Street address: 245 David Low Way Peregian Beach Qld 4573 Real property description: Lot 22 P 9315 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Preliminary Approval for Material Change of Use - Multiple dwelling, Office Preliminary Approval for Operational Works - Roadwork, Drainage Work, Landscaping, Stormwater, Earthworks CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions When Conditions must be Complied With Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered 1622-DA02 to DA09 prepared by Blackburn and Jackson, dated 11 February 2022, and 1622_L01_01_03 and 1662_L03_01_03 prepared by Blackburn and Jackson, dated 11 February 2022. These plans must be amended in accordance with these conditions. Amended plans and associated reports must be submitted to Council prior to any further development applications being made and must include the following to the reasonable satisfaction of the Manager, Development Assessment: One of the three (3) Multiple Dwelling units is to be: accessible by a safe, continuous and step free path of travel from the street entrance of the property or from a car parking space; has a step-free entrance door with opening width of at least 820 millimetres; and contains a bathroom on the entry level. The depth of the vertical screen along the front façade of Unit 1 is to be reduced to 350mm; the outermost projection of Unit 1 is not to exceed 5.45 metres from the front property boundary. Nature and Extent of Approved Use The approved Multiple Dwelling is comprised of three (3) small dwellings, and Office, in accordance with the administrative definitions under Noosa Plan 2020. The plot ratio of the development must not exceed 0.5:1, in accordance with the administrative definition under Noosa Plan 2020. Currency Period This development approval lapses if the use has not happened by 29 March 2028, unless an application to extend the currency period is approved by Council. Building Height The maximum height of the development must not exceed 8 metres above the natural ground level, except where shown on Plan 1622-DA07, dated 11 February 2022. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building/s do not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site (for MCUs). Nature and Extent of Approved Use Non-residential uses on the premises must not operate outside the hours of 7am to 9pm, seven days a week, including public holidays. The requirements of this condition must be included in the Community Management Statement for any body corporate for the subject site. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvres, glass panelling or the like, except where required to satisfy any privacy condition of this Decision Notice. Fencing and Walls Any street fencing must be set back an average of 1 metre from the front property boundary. Any fencing on the front boundary must not exceed a maximum height of 1.8m. The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Waste storage areas are to be screened from the roadside and internal areas within the subject site. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Protection of Privacy The upper level balcony located on the southern building face of Unit 3 must include either balcony planter boxes, balustrading or fixed external screens, positioned in such a way to obscure direct views into the habitable room windows or private open space areas of the adjoining property. Landscaping Works The development site must be landscaped in accordance with PSP3 – Landscaping Plants and Guidelines and generally in accordance with the approved plans. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. All mature trees within the road reserve must be retained in accordance with the approved landscape plan unless prior written authorisation from Council is gained for removal. The existing vegetation between the proposed fence along the road boundary of Lot 22 P9315 and the kerbside must be assessed by a qualified person* and retained, and protected where possible. Where mature trees are to be removed, reasonable grounds must be given by the qualified person*, and substituted with additional Baeckea virgata or Banksia integrifolia with a minimum pot size of 100L or greater. A minimum of one (1) street tree with a minimum pot size of 100L is to be provided along the frontage of the lot, setback at least 1 metre from the kerb in the road reserve verge, and are of a species that do not impact on services. A revised Landscaping Plan relative to plan numbered, 1622_L01-01_03 & 1622_L03-01_03, and findings specific to Conditions 24 and 25 are to be provided for approval. The revised plan is clearly identify the vegetation within the front boundary setback and road reserve which are to be retained and supplementary plantings. External Works David Low Way must be upgraded for the length of its frontage to the subject site. The works must include in particular: construction of a pedestrian footpath in accordance with the conditions of this Decision Notice removal of the existing property access and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed Condition 28 (a) is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk infrastructure identified by Council’s LGIP to service the development. Site Access and Driveways A sealed access driveway must be provided from David Low Way to all parking and manoeuvring areas of the development. The works must include in particular: a driveway crossover in accordance with Council’s Standard Drawing RS-051 suitable safety measures, including warning signage, to improve driver awareness of pedestrians and enhance pedestrian safety. Car Parking A minimum of eight (8) car parking spaces must be provided and marked on the site and made available and accessible at all times while the use is open for business. The works must include in particular: The small dwellings component of the development is to have available three (3) parking spaces, which are clearly marked for that purpose and accessible at all times for visitor use. The office is to have available four (4) parking spaces, which are clearly marked for that purpose. One (1) parking space is to be available for visitors of the site. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Directional signage must be provided to direct visitors and customers to the car parking spaces provided on site. Pedestrian and Bicycle Facilities Pedestrian and bicycle facilities must be provided for the development. The works must include in particular a 2.0 metre wide footpath within the road verge for the entire length of the site’s frontage to David Low Way. Condition 33 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk infrastructure identified by Council’s LGIP to service the development. A minimum of two (2) bicycle spaces are to be provided and dedicated for use by those associated with the Office. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken generally in accordance with the “Site Based Stormwater Management Plan” – Reference number 188-002-001, Revision A prepared by BAX Engineering dated 3 February 2022 and must include: the deletion of the connection from the proposed infiltration pit to the existing infiltration pit in the adjoining property, and any modifications to the proposed infiltration pit necessary due to the deletion of the abovementioned connection The amended plans must be submitted to Council at least 5 business days prior to the pre-start meeting. Condition 35 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property. Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All earthworks and associated retaining structures/batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Operational Works APPROVED PLANS When Conditions must be Complied With Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered 188-002-002-B, 188-002-100, 188-002-200-201, 188-002-300 (as annotated by Council), 188-002-301-302 & 188-002-40 prepared by Bax Engineering, dated 7 February 2022. These plans must be amended in accordance with these conditions. Amended plans and associated reports must be submitted to Council prior to any further development applications being made and must include the following to the reasonable satisfaction of the Manager, Development Assessment: A revised Landscaping Plan relative to plan numbered, 1622_L01-01_03 & 1622_L03-01_03, is to be provided for approval detailing: The existing vegetation between the proposed fence along the road boundary of Lot 22 P9315 and the kerbside must be assessed by a qualified person* and retained, and protected where possible. Where mature trees are to be removed, reasonable grounds must be given by the qualified person*, and substituted with additional Baeckea virgata or Banksia integrifolia with a minimum pot size of 100L or greater. CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 29 March 2028, unless an application to extend the currency period is approved by Council. PRIOR TO COMMENCEMENT OF WORKS Engineering All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve/Reinstatement Safe vehicle and pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Pathways All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065. Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards. All paths must have a slip resistant surface Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard Pathways must: terminate in a manner that ensures smooth transition to existing surfaces for public safety be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility Site Access and Driveways The driveway crossover must be constructed generally in accordance with Council’s Standard Drawing RS-051 and any associated addendum. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties Underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Erosion and Sediment Control Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. These measures must be designed, implemented and maintained in accordance with “Best Practice Erosion and Sediment Control” published by the International Erosion Control Association (Australasian Chapter) (IECA, 2008), to the extent that such measures and practices are also consistent with the following: Minimise Erosion For areas of the site which drain to a sediment basin, implement drainage and erosion control measures prior to rainfall which prevent or minimise rill erosion and gully erosion For areas of the site which do not drain to a sediment basin, implement drainage and erosion control measures prior to rainfall (including contingency measures) which prevent or minimise erosion, including rain drop erosion, chemical erosion, rill erosion and gully erosion Prior to the final inspection for the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Manage concentrated stormwater flows Prior to each rainfall event ensure concentrated stormwater flow paths are provided with capacity in accordance with IECA (2008) Table 4.3.1 and are structurally stable in all rainfall events for the following sources: (a) From stormwater catchments upslope of the area of disturbance which are either stable or external to the site, ensure stormwater is diverted or managed either: around the site or through the site without causing erosion and without contaminating the flow; or if it is impractical to convey the flows around or through the site, convey the flows into appropriately sized sediment basins without causing erosion (b) From all disturbed areas of the site to sediment basin(s) without causing erosion Minimise sediment released from the site Install and maintain additional sediment control measures within the site, as necessary to maximise sediment capture. Minimise the tracking of material from the site onto roadways. Ensure that all material on roadways caused by vehicles leaving the site is removed without causing water contamination, prior to rainfall and at least at the end of each work day. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. The sediment and erosion control design and measures have NOT been approved, it is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have: Been duly designed by an RPEQ or CPESC and constructed in accordance with "best practise" methods, Been revised by an RPEQ or CPESC to address the issues raised by changes in the projected construction schedule and/or methods, Been revised to address predicted rainfall events, and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. Drainage paths must be regularly inspected to ensure the sediment fences/measures are not being bypassed as a result of sediment build up. Sediment laden runoff must be prevented from leaving the subject site and entering neighbouring properties and/or stormwater systems. Soil exposure must be limited on the site to a distance of no more than 2m beyond the extent of earthworks shown on the approved plans except where the exposed soil is effectively stabilised without delay and prior to rainfall occurring. A log book for the Erosion and Sediment Control measures and inspections must be maintained by the site manager and made readily available to Council when requested. The supervising engineer must verify and endorsed the E&SC measures upon their installation, and periodically check these measures and the log book during construction and the stabilisation stages. Any defects in erosion and sediment control devices, such as sediment fences, are to be inspected and documented. Upon Inspection, the contractor is to determine whether the device should be replaced or repaired. Documentation is to include how the damage was caused and what measures can be implemented to reduce the possibility of repeat occurrences. Any damage to either permanent or temporary water quality control structures or devices is to be immediately rectified at the contractor’s expense. The effectiveness of the erosion and sediment control devices must be monitored. All ESC measures are to be inspected: at least daily (when work is occurring on site) or weekly (when work is not occurring on site); or within 24 hours of expected rain; or within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to mobilise sediment on site). Landscape Landscape works must be undertaken in accordance with this Decision Notice. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION / PRIOR TO THE COMMENCMENT OF THE USE Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. Bonds Bonds must: meet the requirements of council’s relevant Planning Scheme Policy for performance and uncompleted works. be calculated using a schedule of works and relevant bond equation have approval of the bond calculations and amount from Council prior to lodgement be requested for release by writing to Council, when relevant approval requirements have been met. As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines. The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and; Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 6 – Engineering Design Standards”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to the commencement of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: certification that all works have been undertaken and completed in accordance with the requirements of this Permit as Constructed details in accordance with Council’s Planning Scheme Policy maintenance and operational manuals for all proprietary or site specific devices Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: a Council inspection reveals works do not comply with approval requirements submitted certification falsely states works comply with approval requirements. A final inspection and approval of the new works and any completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection. referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at http://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9702 or email:[email protected] ) Schedule 10, Part 4, Division 3, Table 1, Item 1 (10.4.3.1.1) - Contaminated land (unexploded ordnance) (Planning Regulation 2017) The agency provided its response on 20 January 2022 (Reference No. 2201-26787 SRA). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Preparation of a Preliminary Construction Management Plan A Construction Management Plan must be submitted to Council at least 5 business days prior to the pre-start meeting. The plan must address the following: traffic management during all aspects of the construction phase including: a Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction maintenance of safe pedestrian access for the areas affected by the works during and after daily construction has ceased proposed fencing to the site during the construction phase of the development approval of the Traffic Management Control Plan by the Department of Transport and Main Roads (DTMR) for any works on State controlled roads provision for worker car parking maintenance and protection of water quality and existing drainage lines through the construction site, through the implementation of appropriate erosion and sediment control measures works programme identifying key components of the works and their respective durations establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic, services and other relevant issues. Include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details. Include signage in prominent locations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details. identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures details on the location of external fill/dump sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense Private Infrastructure All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the final inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. Landscaping For the purpose of preparing a Landscape Plan, a qualified person is considered to be a landscape architect, landscape designer and/or horticulturist with a minimum of 3 years current experience in the field of landscape design. Public amenity trees are defined as any tree located within public streets, parks or areas that will become publically owned as a result of this development. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Advertising Devices All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1 (Administration) 2015 including both temporary and permanent signage. All freestanding, pylon or pole signs or signage that is illuminated requires approval from Council prior to being installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is prohibited from being erected in the Shire. Development Compliance Inspection Prior to the commencement of the use, please contact Council's Development Assessment Branch to arrange a Development Compliance Inspection. Resubmission of Amended Plans Required The conditions of this Decision Notice require resubmission of plan/s to Council with amendments. Please address the amended plan/s to Council’s Development Assessment Branch with the Reference No. MCU21/0228 and OPW21/0364. Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Building Works All building work. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Georgina Schramm Development Planner Enc: Appeal Rights Referral Agency Response Approved Plans/Documents cc. SARA at DILGP SARA at DILGP Referral Agency Response PLANNING ACT 2016 & PLANNING REGULATION 2017 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 21 of 21 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 21 [Attachment: image3.png (image text)] anayan valgnowagago.au ‘Atereen: —Geagra saan ‘SARA response—245 David Low Way, Peregian Beach “The cevecpmet appliances eo ua cota 2 ropa etary ne Sie Acoso nu Refer gery (SARA) on 12 ana 202 Response ‘amare ara ea ego Daeorreense: aomaya conatene “Teceratoni Aachen mute atacasta ay cevcoment oo peice ‘eto ne spear sn Atactnet? Reser: “Theres ne teal agency sponse aren atsrmant 3 Development details ‘esctor DecopreR Para Nia Change Us Mie Dwain (Som aaoece Deveopment emt Operator Von Raaswon Sec Gramps Sameer crear: Reta aang [Attachment: image4.png (image text)] conan ‘Sonease 10 at Onn 3 Tabet #(1943.41)- ermine ara nmloed rane Paring agusten am pececererirensge ———_Nonea Se Car a ‘8 Dave own, Pega Bea es oper cearoton: Un ZONES ‘ene ‘hips atconate ‘Peprantcoa tate T1T208 Kon Ta Bese Cee Maroc G0 88 Representations ‘a apiernayPake RRR 5 TOTES SEG, HY EDT SSIS — ele stm arg aire eral ape repre 6.3 Deter’ ASE RES) (epee ne reer overs an Aachen _Acopy tne repnee ne ban canton splint rine nes. ‘Forks tamaton pease crac Jenny Sepia, ene Paving Oot, onO7 S40 ora (eral secNomsaRAGcealgnqigo av wo ibe passer io ae ‘our erceay ple yj ‘earg harap Ping) ce AtonPrey Ouie +P an Comte pacreegtecon [Attachment: image5.png (image text)] Attachment 1—Referral agency conditions | conatione Soin ‘ng Naar cage oo 70311 Conard ae aici The TS RGIS SESS Baring at 26 nrntas he ear canes of be Sepa of ete Ceveapree ‘ntact, acd Gorenmer snd Parga be eee aura ee eveepment wien ic cnecpment ppoa ees xe ain an errr an rr eg ate ean 1. Pee wt cotvain be Dearie Sale Depa Inrasrcare, Local Gover an Pannghy a appre coriace on de suerlanGovenmem Spare of oSebe neraees Grnance (x0) Pane ate ajc ost bee orcad aac trogeccennes | i un etre ou sve ear snenertcoo toto 2 [Attachment: image6.png (image text)] Attachment 2—Advice to the applicant ‘Genera advice 1 [Sais Ronn eA aE eg (hatred ace rama srg. roe Oe, ee ad ay RT eNO}STO we ONDE GSS DONT (@) Resa Un may en oon rameter and won sous proceed wth ce (2) Te poceaue be thon ary pron tag aed pected ofbeng apese orarance component 1 saves Poe nmeasy 1 donates ne cost tates, nee pope o tet toeng abet (© Arte person: |r spre cence na gna epee colar wang ter ine ct es manager 20 AMA) curet UXO veers arent san carers, may ce tou webs ‘+ Depatent of erumnment ard Somes — nissan 80/2 + commenueath Deparmertt Oceae — rs one ov ula [Attachment: image7.png (image text)] ‘Attachment 3—Reasons for referral agency response. ‘Tre ceveopert comples wn Ste cate 1: Unexloaedaunance oe SOAP speoeay. Te everpmert spleen cao coatnes ore ats scat wh Were CS ‘Se appropri) manage ope rua hea ae enone Mteral vane assesment ot appeston: 1 eercopnen pcan mata astra prs + Penang act218 1 PanongRaguston 217 1+ eSOAP yerion 25) a bts SARA 1+ te Devenpmer Asessmer Rue + SARADAMSpEIg Sem + rman mgs act2010 Attachment 4Representations about a referral agency response [Attachment: image8.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.