Council archive · source document
SUPERSEDED - APPROVED Negotiated Decision Notice - MCU13/0146
Officer: Marcus Brennan Direct Telephone: (07) 5449 5225 Our Reference: MBB:TS:MCU13/0146 Your Reference: 13-1036 10 October 2013 S Yeardley C/- Suncoast Building Approvals PO Box 1054 MAROOCHYDORE QLD 4558 Dear Sir/Madam Negotiated Decision Notice Sustainable Planning Act 2009 I refer to your application and the representations you made in respect to the decision notice. On 10 October 2013, Council decided your representations. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: MCU13/0146 Street Address: 20 Tropicana Rise CASTAWAYS BEACH QLD 4567 Real Property Description: Lot 10 MCH 5387 Planning Scheme: The Noosa Plan (8 August 2011) 2. DECISION DETAILS Council, on 4 September 2013, decided to issue the following type of approval: Development Permit for Material Change of Use of Premises - Detached House In relation to representations, Council decided to: A. Agree to change condition 3. B. Include additional condition 3.1. 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 4 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface, except for the following eave encroachments: the eave situated adjacent to the southeast corner of the master bedroom, which is permitted to extend to a maximum of 8.6m; and the eave situated adjacent to the southeast corner of the family room, which is permitted to extend to a maximum of 8.35m. 3.1 Certification must be submitted to Council from a Licensed Surveyor which certifies that the detached house does not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Landscaping A minimum of 20% of the site must be retained as soft landscaping. Coastal Protection External colours and finishes of the building must comprise of muted/environmental tones that blend with the natural environment. Native vegetation within 3m of the seaward boundary must be protected from clearing. Where vegetation does not exist, this area must be provided with dense landscaping, comprising a mix of native coastal species of ground cover, shrubs and trees accordance with PSP3 Landscaping Plants and Guidelines. ENGINEERING Site Access Driveways A vehicular access driveway to service the dwelling must be constructed from the kerb and channel in Tropicana Rise to the proposed garage. The driveway must be constructed in accordance with AS/NZS 2890.1-2004 and IPWEAQ standard drawing SEQ R-050. Stormwater Drainage Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property. Geotechnical Stability and Earthworks Earthworks required on site must be carried out in accordance with Council’s Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Excavation of the site and the construction of the proposed works shall not have any adverse effects on the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a Registered Professional Engineer Queensland shall supervise the excavation of the site and the construction of the new works to determine whether any additional measures are required to protect the stability of adjoining buildings and/or structures and/or services and/or lands. The development must be carried out generally in accordance with the geotechnical report listed in this decision notice. All earthworks and associated batters must be must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. 5. REFERRAL AGENCIES Not Applicable. 6. APPROVED PLANS Approved Plans Plan No. Rev. Plan Name Date WD.202 P7 Lower Level Plan, prepared by Aboda 08/10/13 WD.203 P7 Upper Level Plan, prepared by Aboda 08/10/13 WD.204 P7 Roof Plan, prepared by Aboda 08/10/13 WD.501 P7 East/West Elevations, prepared by Aboda 08/10/13 WD.502 P7 North/South Elevations, prepared by Aboda 08/10/13 7. REFERENCED DOCUMENTS The following documents are referenced in the assessment manager conditions: Referenced Documents Document No. Rev. Document Name Date S7186 - Geotechnical Stability Review, prepared by Geo Consulting 28/08/13 8. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Development Compliance Inspection Prior to the commencement of the use, please contact Council's Development Audit & Response Unit to arrange a Development Compliance Inspection. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities, one or both of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); and Anti-Discrimination Act 1991 (Queensland). Sunshine Coast Regional Council recommends that the following matters be considered to address equitable access and facilities in the building: the building and environs should be designed to meet the requirements of the Human Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS 1428.2; applicants should be aware that a “Disability Standard on Access to premises” is currently being developed and most likely will impose changes on the Building Code of Australia; and any services and facilities in the building complex should allow independent, dignified and equitable use of the services and facilities for all people. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. ENGINEERING Building and Construction Industry (Portable Long Service Leave) Levy From 1 January 2000, the Building and Construction Industry (Portable Long Service Leave) Levy must be paid prior to the issue of a development permit where one is required for the 'Building and Construction Industry'. This applies to Building Works, Operational Works and Plumbing and Drainage Works applications, as defined under the Sustainable Planning Act 2009, where the works are $80,000 or more and matching the definition of 'Building and Construction Industry' under the Building and Construction Industry (Portable Long Service Leave) Act 1991. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Should you require clarification in regard to the amendments to the Building and Construction Industry (Portable Long Service Leave) Act 1991, you should contact QLeave on 1800 803 481 (free call) or (07) 3212 6855. Qualified Person For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability for the development, a qualified person is considered to be a person who: is a Registered Professional Engineer of Queensland (RPEQ); and has a degree in civil engineering or engineering geology; and has a minimum of 5 years experience in the field of geotechnical engineering or engineering geology. 9. PROPERTY NOTES Not Applicable. 10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 11. FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Building Work 12. SELF ASSESSABLE CODES Not Applicable. 13. SUBMISSIONS Not Applicable. 14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 15. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 16. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices. Yours faithfully DENIS WALLACE SENIOR Development Planner Enc: Appeal Rights Approved Plans Cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. PD-DA-FM387/1-13/04/2010 Page 7 of 8 FM1509s/4-25/09/2013 Page 1 of 8 MCU13/0146 FM1509s/4-25/09/2013 Page 8 of 8 PD-DA-FM387/1-13/04/2010 Page 1 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - APPROVED Negotiated Decision Notice - MCU13/0146Related documentApplication case desk ↗
About this file
- File size
- 153 KB (small file)
- File type
- DOC
No other editions are linked here.