Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2020-10-06 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No.5.1) 2020

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                       11
                              Noosa Shire Council
                         Charges Resolution (No.5.1) 2020



      ACROL    is the adopted charge rate for reconfiguring a lot stated in section 8.3
               (Council adopted charge rate).

      QROL     is the total no of lots.

      C        is the credit stated in section 8.4 (Credit).

      Note:

               (a) for residential lot reconfiguration, the adopted infrastructure charge
                   is apportioned across all networks;

               (b) for non-residential lot reconfiguration, the adopted infrastructure
                   charge apportionment excludes the stormwater charge component.
                   The stormwater charge will be calculated and issued on a
                   subsequent material change of use or building work approval when
                   the impervious area is able to be determined.

(2)   An infrastructure charge that may be levied for a material change of use or
      building work for residential development is generally calculated as follows:

      LCR = (Sum(ACR x QR) for each defined use) − C

      Where:

      LCR      is the infrastructure charge that may be levied for a material change of
               use or building work for residential development.

      ACR      is the adopted charge rate for each defined use for a material change of
               use or building work for residential development stated in section 8.3
               (Council adopted charge rate).

      QR       is the residential quantity for each defined use.

      C        is the credit stated in section 8.4 (Credit).

(3)   An infrastructure charge that may be levied for a material change of use or
      building work for non-residential development is generally calculated as follows:

      LC = LCNR + LCSW

      Where:

      LC       is the infrastructure charge that may be levied for the total development

      LCNR = (Sum of (AC4 x Q4) for each defined use) − C4

      LCSW = (ACSW x QSW) − CSW

      LCNR     is the infrastructure charge that may be levied for a material change of
               use or building work for non-residential development for the transport,
               public parks and land for community facilities networks.

      LCSW     is the levied charge for a material change of use or building work for
               non-residential development for the stormwater network.




                    Council Resolution effective 16 October 2020
Log in to download the original file

2020-10-06 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No.5.1) 2020(PDF, 948KB).pdf · 970 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.