Original source · versioned page text
2020-10-06 P&E Agenda - Item 1 - Attachment 1 - Noosa Shire Council Charges Resolution (No.5.1) 2020
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
21
Noosa Shire Council
Charges Resolution (No.5.1) 2020
The Noosa Plan 2006 Planning Regulation 2017 &
Current at: 28 August 2020 for the 2020-2021 Financial Year
(Superseded planning scheme) The Noosa Plan 2020
Column 1a Column 1b Column 2 Column 3 Column 4
PLANNING REGULATION 2017 COUNCIL COUNCIL
COUNCIL INCLUDED REDUCTIONS
SCHEDULE 16 Prescribed amount APPORTIONMENT CHARGE
Use Use
(As inserted by the Planning Legislation (Fees and Other (per Charges breakup agreement of Amount
Basis %
Amounts) Amendment Regulation 2020) Prescribed amount) reduced
High impact industry or special industry
for each square metre of gross floor area $75.60 64% $48.38
Industrial business 1 High impact industry
• Type 3 Extractive 2 Special industry
for each square metre impervious to
$10.80 100% $10.80
stormwater
Other industry
Industrial business
• Type 1 Warehouse
• Type 2 Production, alteration,
repackaging and repairing
1 Low impact industry
Service & utility for each square metre of gross floor area $54.00 64% $34.56
2 Medium impact industry
• Type 2 Installation
3 Research and technology industry
• Type 4 Treatment, recycling &
4 Rural industry
disposal;
5 Warehouse
Transport
6 Marine industry
• Type 1 Passenger terminal
• Type 2 Carpark for each square metre impervious to
• Type 3 Depot $10.80 100% $10.80
stormwater
• Type 4 Aeronautical
High impact rural
1 Cultivating, in a confined area,
aquatic
Cultivation
animals or plants for sale
• Type 2 Intensive
2 Intensive animal industry for each square metre of gross floor area $21.55 60% $12.93
Animal husbandry
3 Intensive horticulture
• Type 1 Traditional
4 Wholesale nursery
5 Winery
Low impact rural
Cultivation
• Type 1 Traditional
1 Animal husbandry
Animal husbandry
2 Cropping
• Type 1 Traditional Nil $0.00 60% $0.00
3 Permanent plantation
Forestry
4 Wind farm
• Type 1 Native
• Type 2 Plantation
Council Resolution effective 16 October 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.